263475268.

xlsx

Prepare

Analysis base
on previous
DT log file

Identify problem
area and give
solution for tuning

Security Level

Get access permission


for sites may need
tuning; define area
where need DT to verify
for tuning

DT engineer, analysis
engineer and rigger go
to problem area
together

On site

End

03/14/2015

Huawei Proprietary - Restricted Distribution

Page1of2

263475268.xlsx

Security Level

ccess permission
sites may need
ng; define area
need DT to verify
for tuning

ngineer, analysis
eer and rigger go
problem area
together

Rigger stay on site, once


tuning finish, DT team verify
immidiatly and inform rigger
whether need to roll back and
more tuning

once DT result is meet


the target, the problem
can be close, othervise
rollback tuning and give
solution

03/14/2015