Water Supply Quotation For Survey Works: Area Width (M) Length (M) Area (Acres) Unit Rate Amount
Water Supply Quotation For Survey Works: Area Width (M) Length (M) Area (Acres) Unit Rate Amount
Water Supply Quotation For Survey Works: Area Width (M) Length (M) Area (Acres) Unit Rate Amount
Width
(m)
25
50
60
Length
(m)
47,000
100
20
Area
(acres)
Unit
Rate
Amount
1.2
0.3
59.6
General Requirements
Bench marks: to be placed at strategic points at which they may not be disturbed.
These must be concrete structures with iron pins whose locations (x,y,z) must be
established and recorded. All benchmarks must be marked on the soft, hard copies
and on ground.
Treatment works, tanks site areas: Must have at least 3 benchmarks, the pipeline
interval of 0.2m:
Softwares: Topo map to be produced via ARC GIS or Autocad CIVIL3D and saved