PfA,Bng/2015/004/pfA dated 03.02.

2015

To
Mr.V.P.Mehta,
The Finance Officer,
Central Zoo Authority,
Ministry of Environment,Forests and Climate Change,
Govt. of India.

SUB:

Pfa,Bangalore-Construction of Life Time Care Enclosure-for injured,abandoned and handicapped macaquesRequisition for financial Assistance-Rs.6,10,000/-Regading.

REF:

1.PfA,Bng/2015/002/pfA dated 05.02.2015


2.PfA,Bng/2015/003/pfA dated 14.02.2015 to ms-cza@nic.in

Respected Sir,
With reference to the above subject, at PfA, Bangalore, we are rehabilitating fortyfive plus macaques which are
injured, abandoned and handicapped due to accidents,electrocution,etc.,as shown through our monthly,quarterly reports vide ref.1
and ref.2.
The macaques with limb deformities, with three/two/one limb, amputated macaques can not be released into forest
as they can not walk and find their feed.So, based on humanitarian grounds, this remains as a part of our duty to provide them lifetime-care.

We need to build a lifetime enclosure for monkeys whom cannot be released back to the wild. PFA appeals to
your generosity to fund this special home. This will be the first of its kind in India, which will hopefully inspire more people towards
animal welfare activities. Hundreds of children who visit our centre will be inspired by how these animals adjust to their handicaps
and carry on with life in a carefree manner.
These inmates are also likely to inspire the handicapped people to have a more positive approach to life.
PFA currently has many macaques who will remain permanent residents at our rehabilitation centre. They are either blind or
physically incapable of surviving in the wild as have amputated limbs.
While these macaques can never be released in the wild, PFA would like to provide them and other similar ones
with a protected and socially conducive environment to live out their lives. Attached document shares complete details of some of
these construction details and financial estimate of LTC home.The LIFE-TIME-CARE facility is specially designed to meet the
requirements of these blind and amputee macaques.
The facility will have permanently built perches and ladders keeping in mind the minimum amount of exercise that
should be given to the macaques for a healthy living. These enrichments will replicate the natural environment and will support and
ease the daily functioning of the macaques.
These macaques are presently housed in separate enclosures. Macaques are social animals. Their survival is
dependent on each other. Feeding, grooming each other and sharing the same space is an important part of their inherent behaviour.
They need a place, a protected space to care for and live together. They need a home to cater to their special needs. They need a
LIFETIME CARE CENTER.
Kindly extend your co-operation and support for us in constructing a lifetime care shelter for blind,physically incapable
macaques by presenting this proposal before the technical committee meeting on 10.03.2015 and help our proposal getting
sanctioned by the committee, thereby ensuring a life with full freedom to incapable macaques.

Yours sincerely,
Dr.C.Shankaranarayanan,BVScMBA.,
Senior Veterinary Manager,
People For Animals,Bangalore.

Encl:
1.Quotation for LTC with blueprint
2.Foundation+plint
3.Roof components
4.Outline Iron Framework(outside skeleton)
5.Iron rods of roof and sides
6.Bosch power sprayer
7.FINANCIAL ESTIMATE of cages (approved
By Govt Civil Engineer)

THE QUOTATION DETAILS FOR THE CONSTRUCTION OF LIFE-TIME-CARE-HOME FOR MACAQUES ARE AS FOLLOWS:

CHAITRA SIRI ENGINEERING WORKS


(Opposite to Bannerghatta Biological Park, Bannerghatta, Bangalore 560083)
Mob no: 9632504282
__________________________________________________________________
To,
The General Manager
PFA, Bangalore
Dear Sir

Cost of Quotation providing cages for Macaques at PFA Kengeri

With reference to the above subject, I am submitting quotation for providing cages for Macaques as per your drawing:
1) 100 x 100 x 3.2 mm M S Pipe: 2 x 4 x 6.3 Mtrs = 50.4 Mtrs
2 x 6.3 Mtrs = 12.6 Mtrs
63.00 Mtrs x 9.6Kg/Mtr = 604.8Kgs
2) 96 x 48 x 2.5 mm M.S. Pipe : 4 x 7.3 Mtrs =
5 x 5.4 Mtrs =

29.2 Mtrs
27.0 Mtrs
56.2 Mtrs x 5.8 Kgs/ Mtr = 325.96 Kgs

3) 40 x 60 x 2mm M.S Pipe

2 x 5 x 7.3 Mtrs =
3 x 5 x 5.4 Mtrs =

73.0 Mtrs
81.0 Mtrs
154.00 Mtrs x 3 Kgs / Mtr = 462.00Kgs

TOTAL : 1392 kGS X Rs.100/- =


4) Welded Mesh

5) Earth Work

1,39,200.00

30 x 30 x 3mm = 2 x 7.3 x 6 Mtrs = 87.6 Sqmtr


3 x 5.4 x 6 Mtrs = 97.2 Sqmtr
1 x 5.4 x 7.3 Mtr = 39.4 Sqmtr
TOTAL : 224.2 xRs. 630/- =
1,41,246.00
2 x 7.3 x 0.60 x0 .60 = 5.25 Cmtr
3 x 5.4 x 0.60 x 0.60 = 5.83Cmtr
TOTAL
11.08 Cmtr x Rs.250/2,770.00

6) Size Stone Masonry :

2 x 7.3 x 0.45 x 0.40 = 2.62 Cmtr


3 x 5.4 x 0.45 x 0.40 = 2.91 Cmtr
TOTAL
5.53 Cmtr x Rs.4500/-

7) Flooring (Below Foundation:


1 : 4 : 8 Cement Concrete

2 x 7.3 x 0.45 x 0.10 = 0.65 Cmtr


3 x 5.4 x 0.45 x 0.10 = 0.72 Cmtr
8.0 x 6.0 x 0.15 = 7.20 Cmtr

22,120.00

8) 1 ; 2 ; 4 Cement Concrete

TOTAL
8.57 Cmtr x Rs.4000/8.0 x 6.0 x 0.15 = 7.2 Cmtr x Rs.5000/-

34,280.00
36,000.00

9) Sitting Plat Form 2 Feet Below Roof with Lader


10)
11)
12)
13)
14)
15)
16)
17)
18)
19)
20)
21)
22)
23)

Water Trough =
3 Nos x Rs.1200/Door (7 x 3 Feet)
2 Nos
Trap Doors 2 Feet Ht
Kadapa Stone Plat Form 2 Nos x Rs.2000/Siting Plat Form with Lader 3 Nos x Rs. 2000/Painting : 225 Sqmtr x Rs. 75/Top Sheet Cover 2.4 x 6 Mtrs = 14.4 Sqmtr x Rs.600/Square Rod 10mm for strengthen of Mesh 200Kgs x Rs.85/Perches (2 x 1 Feet) 9 Nos (3 on each side)
Stainless steel feeding trays 9 Nos (half inch deep) 1 x 1 Feet
Staircase around the enclosure to reach for the perches to keep food - 3 nos
Stainless steel ladder (SS chains and rods)
6 nos
Ladder to Perches (12 Ft) 3 Nos
Wheels to the Partition making it a Sliding door

GRAND TOTAL
Note:

22,000.00
3,600.00
20,000.00
8,000.00
4,000.00
6,000.00
16,875.00
8,640.00
17,000.00
9,000.00
6,000.00
12,000.00
18,000.00
9,000.00
3,000.00

5,39,731.00

Time for Completion for Work Minimum 20 Days


50% of the Advance amount to be paid before start of Work
Balance Amount after Completion of the Work

Others:
BOSCH POWER SPRAYER AQT 37-13 PLUS

21,000/-

Electrical work for installation at the LTC facility:


Underground cable (140 m approximately)
MCB switch

14,000
1,000

Three pin plug socket (2 nos)


Wooden box
Labour
Total
Solar lamps(15,000 each) 2 nos.
Total Expenditure for the LTC facility including
work needed for the power sprayer :

480
190
4,000
19,670
30,000/the Power sprayer, Solar lamps and electrical

6,10,401.00

certificate
Certified that the above quotation was selected out of three
quotations we have received for LTC construction work,cross-checked with the
value of machinery and inputs mentioned in the quotation, found correct as per
the present market value, cross-checked with the quality of work done by the
vendor previously and found to be good, as per the entry made in the pfa wildlife
animal shelter construction register page no.11.of pfA,Bangalore. Certified that
the price and quality of materials mentioned are found to be correct as per the
prevailing market conditions.

Dr.C.Shankaranarayanan,BVScMBA.,
Senior Veterinary
Manager,

PeopleForAnimals, Bangalore.