OFFSHORE MARINE SPREAD - DECK and BRIDGE INSTALLATION

Kharg Island Gas Gathering and NGL Recovery Project C-1285

Operation
Structure

AB-GCP Deck

B-GCP Deck

Floatover of Topsides
Sr.
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14

Activity
(in days)
Barge Modifications
Mobilization
Loadout & Seafastening
Transport
Floatover
Transport
Demobilization
Subtotal
Loadout & Seafastening
Transport
Floatover
Transport
Demobilization
Subtotal

Name
Sascha
Sascha
Sascha
Sascha
Sascha
Sascha
Sascha
Sascha
Sascha
Sascha
Sascha
Sascha
Sascha
Sascha

Sascha - Float over Vessel


Duration
From
To
17
Preparation @ GPC
5
5
2
5
34
5
5
2
5
d
17

At GPC Yard
GPC
AB Site
At AB Site
AB Site
GPC
days
At GPC Yard
GPC
B Site
At B Site
B Site
GPC
Other Jobs
GPC
days
+d

Operation
Structure

B-GCP Bridge
(73 meters long)

Activity
(in days)

17
18
19
20

Mobilization
Loadout & Seafastening of
AB & B Bridges
Transport to AB Field
AB Bridge Installation
Misc. Installation Works
Demobilization from AB Field

21

Subtotal

22
23
24
25
26

Transport to B Field
B Bridge Installation
Misc. Installation Works
Transport
Demobilization

27

Conclusion:

TB - Supporting Boat
Name
Duration
Idle for
TB1
TB1
TB1
TB1
TB1

m
5
5
2
5

TB1
TB1
TB1
TB1
TB1
TB1
TB1

17
5
5
2
5
d
17

days

days

Name

Tugboats - for Float over Assistance


Duration
From
To
Idle For

TB2 + TB3

Sub-con

GPC

TB2 + TB3
TB2 + TB3
TB2 + TB3

5
2
5

GPC
AB Site
At AB Site
AB Site
GPC

TB2 + TB3
TB2 + TB3
TB2 + TB3
TB2 + TB3
TB2 + TB3
TB2 + TB3
TB2 + TB3

12
5
5
2
5
d
17

days
+m
At B Site
At B Site
At B Site
B Site
GPC
GPC
Sub-con
days
+d

Lifting of Bridge & Other Misc. Installation Works


Sr.
No.
15
16

AB-GCP Bridge
(28 meters long)

Idle For

Subtotal

Summary of Durations

CRANE / Accomodation Barge + TB4


Name
Duration
From
To
Idle For
Crane Barge
m
Sub-con
GPC

Crane Barge
Crane Barge
Crane Barge
Crane Barge

Crane Barge
+ TB4
Crane Barge
Crane Barge
Crane Barge
Crane Barge
Crane Barge

Crane Barge
+ TB4

Sascha
Crane Barge
+ TB4

Filename: Offshore Marine Spread Duration - Contract Scope


Date: 27 Nov. 2008

5
2
10
1
18
1
2
5
7
d

Name
CB1 + TB5
CB1 + TB5
CB1 + TB5
CB1 + TB5
CB1 + TB5
CB1 + TB5

At GPC Yard

5
2
10
1

GPC
AB Site
At AB Site
At AB Site
AB Site
B Site

CB1 + TB5

23

CB1 + TB5
CB1 + TB5
CB1 + TB5
CB1 + TB5
CB1 + TB5

1
2
7
5
d

CB1 + TB5

15

days

+d

days

TB2 + TB3

29

days

+m+d

+m+d

CB1 + TB5

38

days

+m+d

GPC
AB Site
At AB Site
At AB Site
AB Site
B Site
days
AB Site
B Site
At B Site
At AB Site
B Site
GPC
GPC
Other Jobs

15

days

+d

51

days

+m+d

33

days

+m+d

TB1

34

CB1 (Cargo Barge) + TB5


Duration
From
To
m
Sub-con
GPC

days

Idle For

+m

AB Site
B Site
At B Site
At AB Site
B Site
GPC
GPC
Sub-con

Page 1 of 1