To,

M/S Surendra

Date : 26/02/2015
Project Name :
Site Location : Ahamadbad
Client : Mr.Surendra
SUB. : Quotation for Civil & Interior Works at AHAMADBAD.

Sr. no.

Description

Unit

Approx.
Qty

Rate

Amount

Demolition work

Sft

1500

20.00

30,000.00

P/F 100mm thk. Brick work

Sft

1850

85.00

157,250.00

P/F 150mm thk. Brick work

Sft

200

115.00

23,000.00

P/A Plaster work

Sft

6000

40.00

240,000.00

P/F of Vitrified Flooring Tiles (Basic cost of Tiles of


Rs.65/- sft)

Sft

1500

140.00

210,000.00

P/F of Vitrified Skirting

Rft

400

85.00

34,000.00

P/F of Tiles Dado (Basic cost of Tiles of Rs.65/- sft)

Sft

1000

160.00

160,000.00

P/A POP Punning on Wall

Sft

6000

24.00

144,000.00

P/F Main Entrance Glass door Size 3 ' x 7'

No

21,500.00

21,500.00

10

P/F Entrance Flush Door finish with Laminate

No

18,500.00

18,500.00

11

P/F 12mm thick Toughned glass glazing fixed on


alu. Channels

Sft

145

450.00

65,250.00

11a

P/F Cabin Glass door Size 3 ' x 7'

No

21,500.00

21,500.00

12

P/F Wooden frame work for Flush Door

No

12

5,000.00

60,000.00

13

P/F 35mm thk. FLUSH DOOR finish in laminate of


approved shade with all required hardwares

No

12

16,500.00

198,000.00

14

P/F Gypsum Ceiling

Sft

1500

70.00

105,000.00

15

Providing & Fixing Plastic paint in ceiling

Sft

2000

22.00

44,000.00

16

Providing & Fixing Luster paint in ceiling

Sft

3000

28.00

17

P/F Reception table made in 19mm thick ply top


finish in laminate and base in ply boxing finish in
laminate with

No

35,000.00

84,000.00
35,000.00

18

P/S three shitter Shofa

No

20,000.00

40,000.00

19

P/S Side Table

No

5,000.00

5,000.00

Sr. no.

Description

Unit

Approx.
Qty

Rate

20

P/F Cabin table made in 19mm thick ply top finish in


laminate and base in ply boxing finish in laminate
with

No

35,000.00

35,000.00

21

P/F Cabin Side table made in 19mm thick ply top


finish in laminate and base in ply boxing finish in
laminate with

No

8,500.00

8,500.00

TOTAL

Amount

207,500.00

Thanking You,

RAJESH MISTRY
DESCON TURNKEY SOLUTIONS
: TERMS & CONDITION :
~ Water & Electricity shall be provided at the place of work (site) free of cost.
~ Client should provide all the permissions for renovation & execution of work for premises from the
Society & Others.
~ 60% Advance Payment with Order
~ 35% Against Running Bill
~ 5% Against Final Bill
~ Any extra work which is not included in BOQ will be charged separately as an Extra work Bill.
Taxes
VAT and SEVER TAX will be charged extra as applicable