Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Basic Steps to Create Dymanic Modification Rule | SCN

Process:
Quality M anagement --> Inspection Planning--> Basic data--> Sample --> Dynamic modification Rule (QDR1)

DMR is basically used to vary the inspection scope.


DMR can define in 1. Task list at header level
2. Task list at characteristic level
3. Inspection setup of the material master at
inspection type level

E.g:
Normal inspect(5 lots(A*)) --> skip(10lots(A*))--> Reduced inspect(1 lot(A*))--> skip(10lots(A*))
skip(10lots(R*))--> Tighten inspect(5 lot(A*))--> Normal inspect(5 lots(A*))
A- Lot Accept
R- Any one Lot Reject

Select option Dynamic modification rule is created for usage decision /At lot
creation.

You might also like