Project Description Template Tight Focused Coherent Practical Directly
Project Description Template Tight Focused Coherent Practical Directly
Project Description Template Tight Focused Coherent Practical Directly
A good project is
tight
,
focused
,
coherent
and
practical
. All activities should
directly
contribute to the one or more results included in a Results Framework.
Strategic objective
:
Improve classroom learning in marginalized regions.
Relevant IRs and sub-IRs for this project
(with corresponding Results Framework numbers):
PART ONE
Complete the table below for
each
project component/activity cluster. If, illustratively, a
project has 6 components/activity clusters, then six Part One tables should be completed. A
menu of potential project components (activity clusters) is provided in Column One of the
Intervention Design Grid
.
Name of project component/activity cluster: PGPs implemented in rural education
Brief
narrative
description
Target
audience(s)
Timing of
activities
Frequency of
activities
Duration of
activities
PGPs are
identified through
positive deviants
analysis through
focus groups,
class observation,
student
committee
interviews
(year/quarter)
(how often)
(how long)
-Teachers in MRs
-Students
-Parents
-Community
Leaders
July to December
of 2014
Weekly
6 months
Network of
teachers is
identified through
class observations
and professional
development
training.
Locally sourced
teachers and
administrators
December
Summer Break
Daily
Three days
Institute for
Equity in
Education in
Latin America
(IELA)
Teacher led
strategic plan
developed with
admin, teachers,
community
leaders, parents
through IEE
facilitated
workshop
Teachers, parents,
administrators,
community
members
January-March
Daily
Three days
Institute for
Equity in
Education in
Latin America
(IELA)
Current national
standards are
researched and
curriculum is
developed based
on them and the
PGPs. Resource
kit is
disseminated by
teacher network.
IELA
January-March
Daily
Three months
Institute for
Equity in
Education in
Latin America
(IELA)
One semester to
develop a base
line.
Implementing
entity
Additional comments (e.g., linkages to overall strategy for achieving scale, sustainability
and successful exit; innovations):
PART TWO
Briefly describe your plans to achieve scale, sustainability and successful exit.
Scale Plan
What elements of our project cant vary (i.e., they should not
be locally adapted)?
Positive Deviance Inquiry
Network of Teachers
Resource Kit
Strategic Planning Meeting
What elements of our project can be locally adapted?
Adaptation of PGPs will vary depending on community.
Strategic plan
Professional development training
Method for PD Inquiry
How do we ensure that the elements that cant vary are
always delivered at the necessary level of quality?
Monitoring and evaluation on application
Student learning assessment
PGP tool belt expansion and dissemination with the
expansion to each site.
Local networks and M & E Systems are supported with
bridging communication.
Sustainability
Plan