SOLAR STRUCTURAL

COST ESTIMATE
QTY

UOM

A. STEEL WORKS
5 PCS
6 PCS
5 PCS
2 PCS
2 PCS
5 KG
6 PCS
1 PCS
5 PCS
2 PCS
5 PCS
6 PCS

DESCRIPTION

2" X 6" x 1.5 Tubular


2" X 4" x 1.5 C- C - Purlin
4" X 4" x 1.5 Tubular
GI Pipe - 1/2"
GI Pipe - 3/2"
Welding rod
5" x 5" x 1/2 steel plate
6" Cut-off blade
Cutting Disk
Grinding Disk
Hacksaw blade
Anchor bolts - 1/2" x3"
TOTAL

B. MASONRY WORKS
1 BAG
Portland cement
8 BAG
Plastering sand
1 PCS
100 mm REBAR
2 KG
Tie wire

UNIT COST

2600
800
2700
300
400
105
300
850
160
420
75
80

13000
4800
13500
600
800
525
1800
850
800
840
375
480
38370

240
30
180
70

240
240
180
140

TOTAL
C. PAINTING WORKS
2 GAL
2 GAL
1 GAL
1 LOT

Epoxy Primer
Acrylic Paint
Acrylic thinner
Accessories
TOTAL

AMT

800

600
850
350
1000

1200
1700
350
1000
4250

TOTAL MATERIAL

43420

LABOR
MOBILIZATION

21710
3000
68130

3/4'
3.95

3.95

11.9
1.983333
2