Implement machine to automatically flip and align packages, devise quicker labeling process, and control package
accumulation at scaling operation.
Implement device to flip and arrange meat packages in optimal configuration on conveyor for inspection by x-ray scanner
Implement system or device to reduce labor hours associated with labeling packages
Implement system or device to regulate and control accumulation of meat packages at scaling operation
AMI/OSHA Specs
Pass
Pass
Labor Hours
18.34
18.34
Injury Rate
1.35
< 1.35
inj./month
180
180
deg.
8.6/16.3/24.5/
34.6
current
pc./min.
Flip Angle/Alignment
Flow Rate