LIST OF ACTIVITIES F

SR.NO.

DESCRIPTION

FROM B-2 TO B-1

1
2
3

Removal of enable piles and its debris (13 nos of pile)


Shuttering work for slab near pile openings and casting the same
Removal of staging and its materials likes (props and ply).

Waterproofing /grouting in lift (SL-2), weep holes in raft and vertical weep holes in retain

5
6
7
8
1
2
3
4
5
6
7
8
9

Casting of shear wall of sl-2 lift


Casting of staircase from B-2 to B-1
Rendering of RCC walls and honeycombing works if any
Removing of struting beams and carting it away from site
B
FROM B-1 TO GROUND FLOOR
Removing of struting beams and carting it away from site
Excess shuttering materials lying on B-1 slab to be removed
Vertical PCC for 3rd phase above -3 m slab
vetical waterproofing for 3rd phase
Reinforcement work , shuttering and Casting of retaining wall of 3rd phase
Staging, shuttering work and reinforcement work of 1st,2nd and 3rd phase

10
11

Casting of slab for 1st, 2nd and 3rd phase


Staircase casting form B-1 to ground floor of 1st and 3rd phase
Removing of staging and shuttering of slab 1st and 3rd phase
Exceess reinforcement lying (scrap) on site in open space to be stocked properly and rem
immediately
Housekeeping of B-2 , B-1 and grond level open space area to be maintained

12
13
14
15
16

Waterproofing nito proof treatment above 0.00 m level to retaining wall from external fa
the joint between ramp and capping beam.
Casting of retaining wall above 0.00 m level peripheri of ramp area
Toilet sunk casting
Rendering of RCC walls and honeycombing works if any
Demobolising of site materials and machineries

OF ACTIVITIES FROM B-2 TO GROUND FLOOR

al weep holes in retaining wall

d phase

rd phase

STATUS UPTO 3-03-2015 COMPLETED

Active
Active
Active
Active

g wall from external face and at

In progress . 1 no
comp.

yet to start
yet to start
Active

Active
yet to start
Active
yet to start
Active

completed
in progress
completed
completed
in progress

Active

1st and 2nd comp.

yet to start
yet to start
yet to start

1st and 2nd comp.

ocked properly and removed

maintained

3
0

Active
Active
yet to start

BALANCED

EXPECTED
COMPLETION DATE

10
13

16-04-2015
25-04-2015
5/4/2015

13-04-2015
10/4/2015
10/4/2015
11/4/2015
9/4/2015

1/4/2015 to 3-04-2015
3rd phase in
progress

3/4/2015

3rd phase in
progress

3/4/2015
10-04-2015 & 13-04-2015
04-04-2015 & 20-04-2015
20-04-2015
26-04-2015
13-04-2015
6/4/2015
11/4/2015
24/4/2015
30-04-2015