This is to inform you about the testing of the emergency power from the 2 runs
of cable laid for emergency power requirements from the existing Emergency
power feeder section of WRM PH LCSS panel to the emergency panel (3 runs of
cable are already laid for emergency power purpose for Bar Mill and USM
respectively) located beside in Pump House ECE ASAP.
In view of the recent power shutdown on 15.2.15(Sunday), when we could only
switch on 1 soft water pump and 1 industrial water pump (300A current drawn
from LBDS#8 emergency feeder) but could not switch on a third emergency
power pump (failed to draw 450 A from LBDS#8 from LBDS#8 emergency
feeder) .This was because the emergency power supply was repeatedly tripping
after running for 5 mins. So, it is required for WRM projects to get a confirmation
from Power Distribution (Projects) as to how many pumps can be switched on i.e
how much current can be drawn from emergency feeder section of LBDS#8 ,in
the event of a future power shutdown in both WRM and Bar Mill.