Download as pdf or txt
Download as pdf or txt
You are on page 1of 9

PNGE 333

Homework 6
Phillip Colasessano
2/28/2015

HOMEWORK 6
1.

2.

The following information is available from an oil reservoir. There were two
producing wells in the reservoir during the first year. Each well was produced at a
constant rate of 300 STB/D.
t
Days

P
Pisa

Bo
RB/STB

Bg
RB/MCF

RS
SCF/STB

0
365

2500 (Pi =Ps)


2450

1.50
1.45

1.05
1.15

720
670


4.

-
720

-
0


Determine the initial oil in place assuming that this reservoir is a solution-gas
drive reservoir. You may ignore the rock and the formation water expansion.

Repeat problem 2 assuming the reservoir is surrounded by an aquifer. The aquifer
properties are given below:
A (Reservoir)


3.

Rp
Wp
SCF/STB Bbls

1200
0.1
25

acres
fraction
ft.

ct
, water
k

7.00E-06
1
75
360

1/psi
cp
md
degrees

The reservoir in Problem 2 was produced for another year. During the second
year, there were five procuring wells in the reservoir. Each well was produced at
a constant rate of 300 STB/D. The following information were obtained at the
end of the second year:
t
Days

P
Pisa

Bo
RB/STB

Bg
RB/MCF

RS
SCF/STB

Rp
SCF/STB

Wp
Bbls

730

2370

1.43

1.30

620

1125


Which of the two assumptions (solution-gas drive vs. water drive) is more
accurate?
Calculate the initial oil, the solution gas, and the free gas in place assuming the
reservoir in problem 3 has also an initial gas cap.

a. Solution Method:
1. Find the Cumulative Oil Produced (Np), then the Bt , and use these values along
with the given data to calculate the initial oil in place (N).
! = ( )
! = ! + (!" ! )!
=

! [! + ! !" ! ]
(! !" )

2. Find r2w , B , tD , pD , pD , We , Gp , then use these values to find N


! ! =

43,560

360

360

= 1.12! ! !
0.00633
! !

! =

! =

370.529! ! + 137.582! + 5.6949! !


!

328.834 + 265.488! ! + 45.217! + ! !


!

! ! =

1296.86! ! + 1204.73! + 618.618! ! + 538.072! ! + 142.41! !

! = !!!! + !! !!!!

! ! !!!! !
! !!!! ! !

! = ! !
=

716.441 + 46.798! ! + 270.038! + 71.0098! !

! ! + ! ! ! ! (! !)
! !" + (!" ! )!

3. Repeat steps from 1. and 2. To compare but with 5 wells and new given data.
! =
Solution-gas Drive
! = ! + (!" ! )!
=

! [! + ! !" ! ]
(! !" )

Water Drive
0.00633
! !

! =

! =

370.529! ! + 137.582! + 5.6949! !


!

328.834 + 265.488! ! + 45.217! + ! !


!

! ! =

1296.86! ! + 1204.73! + 618.618! ! + 538.072! ! + 142.41! !

! = !!!! + !! !!!!

716.441 + 46.798! ! + 270.038! + 71.0098! !

! ! !!!! !
! !!!! ! !

! ! + ! !" ! (! ! )
(! !" )

4. Simultaneously determine the initial oil and gas in place using a plot. The
equation of the line is the answer.
= ! ! ! ! + ! ! + !
! = ! !"
! = (! !" )
! = !"

b. Results:
1. ! = = 300

!"#

365 2 = 219000
! = ! + !" ! ! = 1.45 + 720 670 1.15 10!! = 1.5075
=

! ! + ! !" !
! !"
=

219000 1.5075 + 720 720 1.15 10!!


1.5075 1.50

= 44,019,000
2.
! ! =

43,560 1200 43,560


=
= 16638694.37 !

360
(360)
360

360

= 1.12! ! !

= 1.12 0.1 25 7.00 10!! 16638694.37


= 326.12

! =

0.00633
0.00633 75 365
=
= 14.88
!
!
0.1 1 (7.00 10!! ) 16638694.37
!

! =

370.529! ! + 137.582! + 5.6949! !


328.834 +

!
265.488! !

+ 45.217! +

!
! !

360
360

= 1.83
!

716.441 + 46.798! ! + 270.038! + 71.0098! !


!

1296.86! ! + 1204.73! + 618.618! ! + 538.072! ! + 142.41! !


= 0.03

! ! !!!! !
! !!!! ! !

! = !!!! + !! !!!!

= 0 + 14.88 0

326.12 2500 2450 0 0.03


1.83 0 0.03

= 132,586.49
! = ! ! = 157680000
=

! ! + ! ! ! ! (! !)
! !" + !" ! !

219000 1.45 + 1.15 10!! 157680000 219000 670


=
1.45 1.50 + 1.15 10!! 720 670

132,586 0

= 26,340,866.67
3.
! =
= 300 365 5 + 219000 = 766500
Solution-gas Drive
! = ! + !" ! ! = 1.43 + 720 620 1.3 10!! = 1.56

! [! + ! !" ! ] (766500) 1.56 + (1.3 10!! )(1125 720)


=
=
(! !" )
(1.56 1.50)
= 26655037.5
Percent Error:

!"#$%&"".!"!!""##$%&.!
!"#$%&"".!"

100 = 1.20%

Water Drive
! =

0.00633
= 29.76
! !
!

! =

370.529! ! + 137.582! + 5.6949! !


!

328.834 + 265.488! ! + 45.217! + ! !

= 2.143

! ! =

1296.86! ! + 1204.73! + 618.618! ! + 538.072! ! + 142.41! !

! = !!!! + !! !!!!

716.441 + 46.798! ! + 270.038! + 71.0098! !

! ! !!!! !
= 588,750.84
! !!!! ! !

! ! + ! !" ! (! ! )
(! !" )
(766500 1.56 + (1125 720)(1.3 10!! 588,750.84
=
(1.56 1.50)
= 16,842,523.5

Percent Error:

!"#$%&"".!"!!"#$%&%'.!
!"#$%&"".!"

= 36.06%

Solution Gas Drive is more accurate 1.20%<36.06%

4.
= ! ! ! ! + ! ! + !
= (1.43 620 1.3 10!!

766500

+ 1.3 10!! 157680000 = 1142358.75


! = ! !" = 1.56 1.50 = 0.06

y = F/Eo

! = ! !" = 2.5 10!!


5.00E+07
4.50E+07
4.00E+07
3.50E+07
3.00E+07
2.50E+07
2.00E+07
1.50E+07
1.00E+07
5.00E+06
0.00E+00

y = 1,894,250,454.55x + 18,762,327.27
R = 1.00

0.002

0.004

0.006

0.008
X = Eg/Eo

y = 1,894,250,454.55x + 18,762,327.27
R = 1.00
N=1,894,250,454.55 MMSTB
G=18,762,327.27 BCF
! =

!"
= 13508875.63
10!

0.01

0.012

0.014

0.016

You might also like