Standard operation procedure

Procedure title

Coal material
handling preparation

Written by
Approved by
Scope: to describe the steps necessary
.before starting up coal mill

:Stacker and reclaimer area


Check for stacker and reclaimer - 1
.mechanically and electrically inspection
Check for lubrication system for all -2
.rotating machines and motors
Check for lubrication oil quality and -3
.level
Check for any oil leakage from -4
.lubrication systems
.Check for all cooling water systems -5
Check for any material drops (chutes-6
must be cleaned to prevent any
.blockage)
Check for all bag filters ready in -7
.operation condition
Check for all feeding bins to have any -8
.hazardous material
Check for dividing gate which switches -9
from the two bins (mechanically and
.electrically)