Construction Management Prelim Exam Reviewer
Quiz 1
Test |- True or False
True 1.) Owner shall pay for Structural, Chemical, Mechanical, Soil Mechanics or other tests
and reports as may be required for the project.
False 2.) lf the owner observes or otherwise becomes aware of any defect in the project, he
shall give prompt verbal notice thereof the architect.
True 3.) He shall designate, when necessary, representatives authorized to act in his behaf,
He shall examine documents submitted by the Architect and render decisions
pettaining thereto promply, try to avoid unreasonable delay in the progress of the
Architect's werk.
True 4.) He shal pay all reimbursable expenses incurred in the project as called forin
Article 7 and all taxes excluding inoome tax) that the Gav. may impose on the Arch,
af the services rendered by the Arch on the project.
False §.) The Architect shall pay for structural, chemical, mechanical, sol mechanics or other
tests and reports as may be required for the prdect.
Test I
Cost Records 1.) During the progress of work the Owner shall fumish the Architect two (2) copies of
records of expenses being incurred for the constuction. Upon completion of the
project, the Owner shall furnish the Arch 2 copies of the summary of all items.
401 2.) Architect Owner Contract form is UAP doc. Form no.
Contract Documents 3.) He shallfurnish not more than five (5) complete sets of contract drawings,
Phase specifications and general condition.
‘Construction Phase 4.) He shallassist the owner in obtaining proposals from contractors and in awarding
and preparing construction contracts
Basic Fee 5.) Applies to construction work done by a contractor or contractors on the basis of a
lump sum contract or lump sum contract basis, where the architect has to render
more than the regular or basic services shal be subject of an additional charge
Test Ill
Government Taxes On 1.) Any tax that the government may impose on the Architect as aconsequence
Services of the service performed for the Project (exclusive of income tax) shall be paid
by the Owner.
Work Suspended Or 2.) When the owner therefore fails to implement the plans and documents for
Abandoned construction as prepared by the architect, the architect is entitled to receive as
compensation the sum corresponding TO EIGHTY FIVE (85) percent af ris fee.
Changes Ordered By 3.) If he work of the Architect is abandoned or suspended, in whole or in part,
‘Owner Services the-Architect is to be paid by the Owner for the services rendered
corresponding to the fees due at the stage of suspension or abandonment
of the work.
Extra Sets Of Contract 4.) Architect is tofumish the Owner five (6) sats of Drawings, Specifications and
Documents other E Government taxes Contract Documents, Cost for printing or
reproduction of extra sets of Contract Documents on when recuited by the
‘winer is to be paid by the Owner.
Per DiemsAnd Traveling 5.) Snail be chargeable to the owner on any occasion where the architect or his
Expenses duly authorized representative shall be required to perform services at a locality
beyond the radius of 100 kilometers from his established office,
Miniature Models 6.) lf the Owner desires to have such item of the final and approved preliminary
drawings display purposes, the Owner shall pay for the cost of said item, The
architect may make and include this item of studies as part of fis preliminary
sketches.
Other Professional Services 7.) Do not include services for survey, soil exploration and laboratory tests, other
services such as acoustic engineers, mural painters, sculptors and interior
decor recommended by the Arch. for Owner's approval & casts are to be paid
by the Owner.Separate Services 8.) Ifthe Owner requires to design or plan movable closets, cabinets, furniture,
covered walks, grottos, pools, landscaping and other items, the Owner shall
pay add'l compensation in the amount of (15%) of the construction cost.
Different Periods of 9.) If the portions of the bldg, are erected at this duration, this increasing the
Construction architect in this phase period & burden or services, charges pertaining to
services rendered during this phase shall be doubled.
Owner's Responsibiities 10.|The Owner shall provide full information as to his requirements for the Project.
Test IV
Atbitration 1.) Allquestions in dispute under this Agreement shall be submitted in
accordance with the provisions of Philippine Law on Arbitration and
provided for in Art. 2042 of the New Civ Cade of the Philippines and the
provisions of Republic Act No. 876.
Ownership of Documents 2.) This is in pursuance with the pertinert provisions of Republic Act $45
promulgated on June 17, 1960 and of Presidential Decree No, 49 on this
"LAW" issued on November 14 1972.
10 percent (10%) 3.) Fee for the Architect's liability under the Civi Code in hs reguier design
senices.
5 percent (5%) 4.) Fee for the construction phase service which includes preparation of
contract document forms and periodic visits during construction
Project Construction Cost §.) Means the completed structure of the owner including plumbing and
electrcal fixtures, mechanical equioment, air conditioning equipment,
generators