Download as pdf
Download as pdf
You are on page 1of 1
Minutes of meetings. Minutes of meeting held between M/s OEG India Ltd and M/S Blue Star Itd. Blue Star Engineers arrived at M/S IBPGL site Tuticorin on 05.01.2015 at 11.00PM They were checked VFD Packaged A/C and 11 meter Control room packaged A/C units. They are requested the following Points to steady and analyze the performance of Packaged A/C units. We required Present head load for the VFD Control room. * We have taken CFM 6300 of one DPAP 1983 unit (As per designed 8800CFM). 1. There is no fresh air intake, only exhausting the hot air and there is no enough fresh air circulating inside the VFD room . VFD room Size. . Heat load for VFD No. of Electrical panels. No. of windows and Sizes. . Drive modules inlet and outlet Exhaust temp and CFM of Exhaust air. . Requested Room Temp has to be maintained 22 to25degC. poxce . Indoor coil cleaned to be cleaned by chemical cleaner with water fresher. Presently we are doing water wash cleaning and Monthly once chemical cleaning. : 9. After servicing CFM calculation to be done. 10.Condenser coil( fins coils) are in damaged condition. ON aAnNRwWN After Cleaning the indoor coils , need to take the Machine performance. Blue star Engineers relived from IBPL site at 2.00PM. For OG For Blue Star SB ele Af. Csr ORES) Yacob sussa 1 “ ac) Pic Cralani eurad

You might also like