PT.

PLN (Persero) DISTRIBUSI BALI


AREA BALI SELATAN

PEKERJAAN

LOKASI
POS ANGGARAN

RENCANA ANGGARAN BIAYA


Pembangunan SKTM NA2XSEYBY 3X240 mm untuk Express
Bajataki, Pecah beban P_Kerobokan dan P_Tibubeneng

GI Padang Sambian, Jl.Buana Raya, Jl. Gunung Guntur, Jl. Tunjung


Sari, Jl. Padang Kartika, Jl. Muding Tengah

6.1

VOLUME
NO

URAIAN PEKERJAAN

PLN

FUNGSI KABEL TANAH


I
1
2
3

MATERIAL UTAMA
Kabel NA2XSEYBY 3X240 mm
Jointing 3x150 mm - 3x240 mm coldshrink
Terminal OD 3x150 mm - 3x300 mm coldshrink

Terminal ID 3x150 mm - 3x300 mm coldshrink

5
6

Trefurcating 150/240 mm2


Arrester 24 kV 10 KA

Harga Satuan
Material
( Rp )

Stn
Pemb.

Harga Bagian

Jumlah

Jasa

Material

Jasa

Biaya

( Rp )

( Rp )

( Rp )

( Rp )

kms

10.958

m
set
set
set

10,958
-

45
2
3

4,725,000.00
4,455,000.00

13,161.00
658,052.00
438,701.00

212,625,000.00
8,910,000.00

3,712,500.00

438,701.00

11,137,500.00

3,591,000.00
-

658,052.00
29,900.00

7,182,000.00
-

1,316,104.00

239,854,500.00

177,609,287.00

set

bh

Sub Jumlah I
II

MATERIAL KONSTRUKSI

1
2

Penggalian kabel pada tanah biasa


Penggalian kabel pada aspal

m
m

Penggalian kabel pada hotmix

4
5

Penggalian kabel pada trotoar / beton


Agregat A

m
m

Agregat B

7
8

Concrete plate 40x20x6 cm


Pasir Urug

144,218,238.00
29,612,340.00
877,402.00
1,316,103.00
269,100.00

698
1,895

43,870.00
65,805.00

30,621,260.00
124,700,475.00

32

65,805.00

235
1,144

200,444.00

75,976.06
21,935.00

229,252,653.54

2,105,760.00
17,854,374.10

858

180,962.00

21,935.00

155,227,964.01

18,815,692.75

bh
m
m

38,482
572

3,850.00
90,500.00

439.00
21,935.00

148,156,855.00
51,753,520.05

16,893,729.70
12,543,795.16

m
m

1,895
32
235

219,351.00
263,221.00
202,771.80

12 Timah tanda kabel


13 Patok tanda kabel

bh
bh

1,096
592

6,864.00
24,230.00

6,867.00
8,774.00

7,522,944.00
14,344,160.00

14 Box joint kabel

bh

44

815,835.00

263,221.00

35,896,740.00

15 Boring kabel manual dengan pelindung pipa PVC

88

164,513.00

16 Pipa galvanis BSA 6" pelindung kabel 6 mt


17 Pipa galvanis BSA 6" pelindung kabel 6 mt (jembatan kabel)

bt
bt

2
4

1,602,720.00
1,602,720.00

32,903.00
32,903.00

3,205,440.00
6,410,880.00

18 Pipa pelindung PVC. 6" 4 mt (boring)

bt

22

540,112.00

11,882,464.00

19 Dudukan Terminating OD 2000mm UNP 100 Gal Komplit


20 Dudukan Terminating ID 1200mm UNP 100 Gal Komplit

set
set

3
3

585,200.00
585,200.00

32,903.00
32,903.00

1,755,600.00
1,755,600.00

98,709.00
98,709.00

21 Dudukan Pipa Pelindung Kabel


22 Dudukan Arrester 2000mm UNP 100 Gal Komplit

set
set

2
3

337,900.00
669,800.00

32,903.00
32,903.00

675,800.00
2,009,400.00

65,806.00
98,709.00

23 Arde 3 Ohm (pasang dalam) terminasi di gardu

set
set

3
3

563,200.00
566,182.00

109,675.00
131,610.00

1,689,600.00
1,698,546.00

329,025.00
394,830.00

673,238,166.61

760,429,781.04

9 Perbaikan aspal tbl 10 cm


10 Perbaikan hotmix tbl 10 cm ( 6 cm laston ATB + 4 cm laston AC)
11 Perbaikan trotoar dan beton

24 Arde 3 Ohm (pasang luar) terminasi di tiang

Sub Jumlah II

III LAIN - LAIN


1 Pembuangan tanah galian

698

26,322.00

Test kepadatan urugan tanah dan agregat

lks

87,621.00

3
4

Pengangkutan material dari/ke gudang


Foto dokumentasi 4R

ton
lbr

71.23
6

5
5

Asbuilt drawing digitasi emap JTM


Commisioning test-SLO SKTM

kms
lks

10.958
1

Sub Jumlah III


Total I + II + III + IV
PPN 10 %

3,000.00
-

131,610.00
2,861.00
11,000.00
3,100,000.00

18,000.00
-

417,463,787.00

25,087,590.33

415,670,145.00
8,423,072.00
47,651,373.00
7,526,232.00
5,194,208.00
11,581,724.00
14,477,144.00
65,806.00
131,612.00
-

1,433,667,947.64

18,372,756.00
87,621.00
9,374,580.30
17,166.00
120,538.00
3,100,000.00

18,000.00

31,072,661.30

31,090,661.30

913,110,666.61

969,111,729.34

1,882,222,395.94
188,222,239.59

Jumlah +PPN

2,070,444,635.53

Dibulatkan

2,070,444,636.00

PT. PLN ( PERSERO )


AREA JARINGAN
BALI SELATAN
J a l a n S u d i r m a n N o. 2 D e n p a s a r
Telepon

264610, 228121
3260

Kotak Pos

80113

Facsimile : 234920

Pelayanan gangguan : 123

PERMINTAAN ANGGARAN
Nomor : . / 6.1 /REN/ XI/ 2014

Pos Anggaran
Kode Perkiraan

6.1

:
:

Perkiraan Biaya
No

Uraian Pekerjaan

Vol / Sat
3

Harga Satuan

Jumlah

( Rp )

( Rp )

Pekerjaan :
- Pembangunan SKTM NA2XSEYBY 3X240 mm untuk Express Bajataki, Pecah beban
P_Kerobokan dan P_Tibubeneng
-

Lokasi :
- GI Padang Sambian, Jl.Buana Raya, Jl. Gunung Guntur, Jl. Tunjung Sari, Jl. Padang
Kartika, Jl. Muding Tengah

SKTM

(430303)

10.958 Kms

2,070,444,636.00

KUBIKEL

(43041)

- Set

APP TM

(43051)

- Plg

SKK : KEANDALAN (BASKET 1)


Jumlah

Terbilang :

2,070,444,636.00

Dua milyar tujuh puluh juta empat ratus empat puluh empat ribu enam ratus tiga puluh enam
Denpasar, Nopember 2014

Pemohon
Assman Perencanaan & Evaluasi

Menyetujui,
Assman Pelayanan & Administrasi

Mengetahui,
Manajer

Agus Yudhistira Sujana

I Gst Ketut Putra

I Nyoman Sueca

PT. PLN ( Persero ) Distribusi Bali


Area Bali Selatan
REKAPITULASI RENCANA ANGGARAN BIAYA
Pekerjaan :

Pembangunan SKTM NA2XSEYBY 3X240 mm untuk Express Bajataki, Pecah


beban P_Kerobokan dan P_Tibubeneng

Lokasi

GI Padang Sambian, Jl.Buana Raya, Jl. Gunung Guntur, Jl. Tunjung Sari, Jl.
Padang Kartika, Jl. Muding Tengah

Pos Angg :

6.1

Material (Rp)
No.
Jenis Pekerjaan
I
II
I JTM KABEL TANAH 3 x 240 MM2
Kabel Dibawah Tanah
Peralatan Jaringan

PLN
III

Konstruksi
IV

Jasa (Rp)

Jumlah (Rp)

Keterangan

VI

VII

144,218,238.00

913,110,666.61

824,893,491.34

144,218,238.00 Fungsi Kabel Tanah 3 x 240 mm2 :

II GARDU KUBIKEL
Gardu Distribusi

Trafo / Kubikel

III APP TM
SR 3 Phase TM
Jumlah

P P N 10 %
Jumlah

:
:

Jumlah dibulatkan

913,110,666.61

969,111,729.34

10.958 kms

1,738,004,157.94
Kubikel

Cell

APP TM

Plg

1,882,222,395.94
188,222,239.59
2,070,444,635.53

2,070,444,636.00

Terbilang : Dua milyar tujuh puluh juta empat ratus empat puluh empat ribu enam ratus tiga puluh enam
Catatan : Harga satuan berdasarkan kontrak KHS, tgl 21 April 2014

Denpasar,

Nopember 2014

Assman Perencanaan & Evaluasi

Agus Yudhistira Sujana