BUR - Fencing (Labour Only)

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

Build-Up Rates

FENCING
a) Machinery Cost
i)

Pick-up truck (3.0T) for carring,materials, workers and tools :1

ii)

RM

150.00 per day

= RM

150.00

per

day

1 day

RM

270.00 per day

= RM

270.00

per

day

= RM

100.00

per

day

= RM

520.00

per

day

= RM

5.75

per

Miscellaneous items (e.g. crowbar, hammer and hardware tools)


Allow a est. sum for

iv)

1 day

Backhoe operation, overhead cost incl. maintenance cost :1

iii)

1 day

RM

100.00 per day

Sub - Total Overall Cost for Machinery

Productivity of Work

Machinery Cost per Metr :

91
RM

520.00

per day

91

b) Workmen & Manpower Cost


i)

Ganger daily basic salary :1

ii)

1 day

RM

130.00 per day

= RM

130.00

per

day

RM

60.00 per day

= RM

300.00

per

day

= RM

430.00

per

day

= RM

4.75

per

= RM

10.50

per

= RM

1.57

per

= RM

12.07

per

RM

12.10

per

General Worker daily basic salary :5

iii)

1 day

Sub - Total Overall Cost for Workmen & Manpower

Productivity of Work

Manpower Cost per Metr :

91
RM

430.00

per day
91

c) Total Machinery + Workmen & Manpower Cost


so,

ADD

Profit & Overhead

15%

Total Rate per Unit

PROPOSED RATE

Build-Up Rates