Executant: SC CONECT GROUP SRL

Investitie: Hala Marginea


Perioada Executie: 19.09.2014-28.11.2014

Situatie de Lucrari
Nr.
Crt.

Denumirea

Cantitat
ea

1. Excavatie Demisol + Fundatie


Ore Bobcat
13.00
Transport Camion 1,5 km
8.00

UM

Pret
Unitar
[lei]

Total
[lei]

h
curse
Total

2. Pardoseala Demisol
Materiale
Beton B150
Plasa sudata 4
Folie

6.60
4
4.00

m3
220
buc
70
kg
10.00
Total materiale

Manopera
Turnare beton
Montare Armatura

6.6
211.2

m3
kg
Total manopera
Total

3. Diafragma + Fundatii
Materiale
Beton B250
Cupoane 35 cm
Stalpi
Plasa 6

27
19.20
81.58
5

m3
220
kg
2.8
kg
2.8
buc
158.84
Total materiale

Manopera
Turnare beton -pompa
Montare Armatura
Cofraj

27
364.78
32.08

m3
kg
m2
Total manopera
Total

4. Elevatii
Materiale
Beton B250
Mustati Stalpi
Centuri
Plasa sudata 4

19
96.80
243.60
4

m3
220
Kg
2.8
Kg
2.8
buc
58.15
Total materiale

Manopera
Turnare beton - pompa
Montaj Armatura

19
405.97

m3
kg

1188
280.00
40.00
1508

5940
53.76
228.42
794.20
7016.38

4180
271.04
682.08
232.60
5365.72

Executant: SC CONECT GROUP SRL


Investitie: Hala Marginea
Perioada Executie: 19.09.2014-28.11.2014

80

m2
Total manopera
Total

5. Placa Demisol
Materiale
Beton B 250
Armatura 8
Plasa 6
Polistiren extr.

6.4
284.4
4
3

m3
220
kg
2.8
buc
158.84
139,44
bax
Total materiale

Manopera
Montaj Armatura
Turnare beton
Cofraj

495.6
6.4
38.53

kg
m3
m2
Total manopera
Total

Cofraj

6. Umplutura Pardoseala
Utilaje
Excavator
Vola
Compactor+Placa
Transport
Transport camioane balast

15
3
6

h
h
h

17

curse

1408
796.32
635.36
418,32
3258

Total
7. Pardoseala
Materiale
Plasa 6
Folie
Beton
Manopera
Montaj Armatura
Turnare beton
8. Elicopterizare Pardoseala
Materiale
Ciment
Quartz
Manopera
Elicopterizare

15
18
25

buc
158.84
kg
m3
220
Total materiale

792
25

kg
m3
Total manopera
Total

1
1
Total

9. Zidarie BCA - Parter

2382.60
180.00
5500
8062.6

Executant: SC CONECT GROUP SRL


Investitie: Hala Marginea
Perioada Executie: 19.09.2014-28.11.2014

Materiale
Carton Asfaltat
Adeziv BCA
Dulapi Buiandrugi
Manopera
Zidarie BCA

2
54
0.194
216

rola
35
Sac
16
m3
600
Total materiale

70
864
116.4
1050.4

m2
Total

10.
Stalpi
Materiale
Armatura
Beton

428.4
3

Kg
2.8
m3
220
Total materiale

Manopera
Armare
Cofrare
Turnare

428.4
27
3

kg
m2
m3
Total manopera
Total

11.
Centuri
Materiale
Armatura
Beton

233
4.8

kg
2.8
2
m
220
Total materiale

Manopera
Armare
Cofrare
Turnare

233
48
4.8

kg
m2
m3
Total manopera
Total

12.
Grinzi Planseu
Materiale
Grinzi Lemn
Manopera
Montare Grinzi

88

88

15

1199.52
660
1859.52

652.4
1056
1708.4

1320

Total
13.
Scara Demisol
Materiale
Armatura
Beton

26
1

kg
2.8
3
m
220
Total materiale

Manopera
Armare

26

kg

72.8
220
292.8

Executant: SC CONECT GROUP SRL


Investitie: Hala Marginea
Perioada Executie: 19.09.2014-28.11.2014

Cofrare
Turnare
14.

6.6
1

m2
m3
Total manopera
Total

Tamplarie PVC
Materiale + Manopera
Total

15.
Termosistem
Materiale
Polistiren
Adeziv polistiren
Dibluri
Plasa
Coltare
Total materiale
Manopera
Polistiren+Dibluri
Plasa+Masa de spaclu

176
103

9724.26

1538.18
1041.6
158.1
525.78
138
3401.66

m2
m2
Total

16.
Invelitoare
Materiale
Ferme metalice
Pene metalice
Panouri sandwich

6
308

buc
m

1500
10.5

Total materiale
Manopera
Macara mobila
Montatori
Transport ferme+pene

ore

150

9000
3234
22123,5
34357,5
450

Total manopera
Total
17.
Put
Materiale
Tuburi
Manopera
Excavator Bobcat E45
Transport tuburi

buc

ore

40

Total Manopera
Total
18.
Rampe acces
Manopera
Excavator Komatsu

ore
Total

120

Executant: SC CONECT GROUP SRL


Investitie: Hala Marginea
Perioada Executie: 19.09.2014-28.11.2014

Total
Total materiale 79045,24
Total manopera
Total General

Denumirea
Ulei ungere
Benzina
Sarma f.
Sarma d.
Lamele 30
Lamele 15
Cuie 6
Cuie 12

Consumuri materiale
Cantitatea
UM
4
l
14,5
l
13,5
kg
15
kg
500
buc
95
buc
10
kg
10
kg

Pret Unitar

Pret Total

You might also like