Techno Commercial Bid Layout

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Comments on tender Drawings:

General comment:
1) M/s confirm that there are no deviation in their bid except those discussed or
mentioned in the bid. Any other deviation or incomplete system description
appeared anywhere at any stage of project in their bid stand withdrawn.
2) All ventilation, Gantry crane, & LT mentioned in Power House GA
sheet 4/4, Drawing No: are in bidder scope. Please delete the note
from the drawings.

You might also like