CE5161 - Course Handout

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

NATIONAL INSTITUTE OF TECHNOLOGY WARANGAL

Department Of Civil Engineering


Warangal 506004, Telangana, India
CE5161: Construction Methods and Equipment
Course/Specialization: M.Tech- ES, CTM
Course Type : Elective (PG)
Course Credits: 3(3-0-0)
Slot: (3-4 PM) W (8-10 AM) F

Semester: Dec 2014-May 2015


Instructor: Dr. M.V.N.Sivakumar
Office: 12th Block, 12-G-05
E-Mail: mvns@nitw.ac.in

Course Outcomes:
At the end of the course, the student will be able to:
v Select construction equipment appropriate to tasks
v Estimate equipment ownership and operating costs
v Estimate and schedule activities using equipment productivity and cost data
v Understand contemporary issues pertaining to construction methods, equipment usage and
management.

Detailed lecture Plan


S.No.
1

Topics
Equipment Economics
Equipment records, Cost of Capital
Elements of ownership Cost, Operating Cost
Replacement Decisions
Rent and Lease Considerations
Planning for Earthwork Construction
Planning
Graphical Presentation of Earthwork
Earthwork Quantities
Mass Diagram
Pricing Earthwork Operations
Compaction and Stabilization Equipment
Compaction of Soil and rock
Types of Compacting Equipment
Dynamic Compaction
Stabilizing soils with Lime
Cement Soil Stabilization
Mobile Equipment Power Requirements
Required Power
Available power
Usable power
Performance Charts
Dozers
Introduction
Performance Characteristics of Dozers
Pushing Material
Land Clearing

CE5161/MVN/II-Semester/2014-15

Lectures planned
3

Page 1

9
10

11
12
13

Scrapers
Scraper types, operation
Performance Charts, Production cycle
Excavators
Hydraulic Excavators
Shovels, Hoes
Trucks and Hauling Equipment
Trucks, productivity
Performance Calculations
Finishing Equipment
Gaders, Trimmers
Concrete and Concrete Equipment
Concrete Mixtures
Batching of Concrete, Placing of Concrete
Cranes
Piles and Pile-Driving Equipment
Planning for Building Construction

2
2

2
3
2

Evaluation Scheme
Evaluation Component

Weightage

Minor-I

5%

MID

30%

Minor-II

5%

Assignment/Seminar/Term
Project
End Sem

10%
50%

Reference Books:
1. Peurifoy, R.L., Ledbetter, W.B.and Schexnayder, C , " Construction Planning Equipment and Methods ",
5th Edition, McGraw Hill, Singapore,
2. Sharma S.C. Construction Equipment and Management ", Khanna Publishers New Delhi.

CE5161/MVN/II-Semester/2014-15