B.O.Q Estimated Cost: Rs. 16.109 (M)

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

B.O.

Q
Estimated Cost: Rs. 16.109(M)
Name of Work

F/S, Design and Black Topping of road at Palai & Agra (10KM) in District Malakand.

SUB HEAD

B/T of road Bazdara road (1KM).

S.
No.

MRS
NO.

Itmes of Work

Qty

Unit

Rate offered by
Contractor/firms
In Figure

Excavation in shingle or gravel


03-09-a formation & rock not requiring
blast, undressed, 50m lead : Dry

4365.18

m3

Formation of Embankment from


Borrow Excavation in Common
03-61-c
Material including compaction by
power roller.

1080

m3

16-03-a

Granular Sub Base Course using


Pit Run Gravel

585

m3

16-04-b

Water Bound Macadam Base


Course

574.875

m3

16-06

Bitumenous Prime Coat

3832.5

m2

16-12-b

Asphaltic Wearing Course


(Asphalt Batch Plant Hot Mixed)

191.625

m3

Carriage of asphalt concrete from


asphalt plant batch plant to site of
16-12-c
450.31
work by dump trucks upto 44
kms.

t/km

Excavation in foundation of
03-23-b building, bridges etc complete : in
ordinary soil

m3

897.69

In words

06-36-a

10

PCC 1:3:6 in mass concrete less


formwork using 50% boulders

1010.89

m3

Plain Cement Concrete including


06-05-f placing, compacting, finishing &
curing (Ratio 1:2:4)

47.41

m3

11

Errecting & removing formwork to


06-38-b concrete in any shape / position
(Vertical)

2138.4

m2

12

Formation of Embankment from


Borrow Excavation in Common
03-61-c
Material including compaction by
power roller.

309.96

m3

13

Plain Cement Concrete including


06-05-h placing, compacting, finishing &
curing (Ratio 1:3:6)

88.94

m3

14

Providing and Laying RCC pipe


23-03-asewers complete As per ASTM C03
76-79, Class II : 18" i/d, Wall B

7.2

15

RCC in roof slab, beam, column


06-06-a& other structural members, insitu
03
or precast. Type C (1:2:4)

20.62

m3

16

Supply & fabricate M.S.


reinforcement for cement
06-07-c
concrete (Hot rolled deformed
bars Grade 40)

3.21

Tonne

66.54

m3

17

08-15

Provide & lay stone/boulder dry


hand packed as filling behind
retaining walls or in pitching

Grand Total:-

Note:-

1. The Quantity of work & tender cost is liable to increase/decrease as per actual site re
2. NO premium is allowed on BOQ items

Signature of contractor._______________________

SUB DIVISIONAL OFFICER


C & W SUB DIVISION # I MALAKAND

16.109(M)

ict Malakand.

Amount

FFICER
MALAKAND