Professional Documents
Culture Documents
Process Design Lurgi
Process Design Lurgi
Responsible Issuer:
Section
1.0 P&ID Engineering and Philosophy
2.0 Utility Battery Limit and Utility Header & Block Valves
3.0 Connection for Instruments
4.0 Equipment Sparing Philosophy
5.0 Equipment Duty Margin
6.0 Pressure Relief Philosophy
7.0 Insulation and Tracing Philosophy
8.0 Process Block Valves Philosophy
9.0 Utility Station Location Philosophy
10.0
11.0
12.0
13.0
14.0
Utility Conditions
15.0
Noise Control
16.0
Aromatics Handling
17.0
Corrosion Allowance
18.0
IBR requirements
Anoop Sharma,
Approval: Name, Date, Signature
Copying of this document, and giving it to others and the use or communication
of the contents thereof, are forbidden without express authority by Lurgi.