RENCANA ANGGARAN BIAYA

Pekerjaan
Tahun

No.
A.

: Pengadaan Landscape & Pengaspalan Renovasi Rumjab Kapolda Kaltim


: 2014

Uraian Pekerjaan

1
2
3
4
5
6
7

PEKERJAAN LANDSCAPE
Tanaman Depan Rumah
Rumput Gajah
Tanah top Soil
Pupuk Kandang
Palm Merah Tinggi 4 m
Palm Kuning Tinggi 2 m
Palm Merah Tinggi 1.8 m
Pas Kanstin

1
2

Taman Samping Kanan Rumah


Rumput Gajah
Pucuk Merah

Volume

Sat.

552.00
6.00
10.00
1.00
1.00
1.00
200.00

M2
Truck
Krg
Pohon
Pohon
Pohon
M1

132.00
5.00

M2
Pohon

JUMLAH

JUMLAH
1
2
3
4
5
6
7
8

Taman Samping Kiri Rumah


Rumput Gajah
Palm Merah Tinggi 4 m
Palm Kuning Tinggi 2 m
Tanah Urug
Bromelia Putih
Bromelia Merah
Sambang Darah
Iris Kuning

126.00
1.00
1.00
3.00
10.00
4.00
30.00
150.00

M2
Pohon
Pohon
Truck
Pohon
Pohon
Pohon
Pohon

JUMLAH
1

Kolam Tanaman Dekat Dapur


JUMLAH

Ongkos Kerja
JUMLAH

JUMLA
B
1
2
3

PEKERJAAN PERKERASAN ASPAL


Lapis Perekat-Aspal Cair
Laston Lapis Antara (AC-BC) (Gradasi Halus/K
Aspal Minyak

183.55
71.92
4.38

Ltr
Ton
Ton

Aditif Anti Pengelupasan

43.77

Kg

BIAYA

polda Kaltim

Harga

Jumlah

25,000.00
450,000.00
25,000.00
1,750,000.00
750,000.00
1,750,000.00
40,000.00

13,800,000.00
2,700,000.00
250,000.00
1,750,000.00
750,000.00
1,750,000.00
8,000,000.00
29,000,000.00

25,000.00
350,000.00

3,300,000.00
1,750,000.00
5,050,000.00

25,000.00
1,750,000.00
750,000.00
250,000.00
45,000.00
75,000.00
25,000.00
7,000.00

3,150,000.00
1,750,000.00
750,000.00
750,000.00
450,000.00
300,000.00
750,000.00
1,050,000.00
8,950,000.00
13,000,000.00
13,000,000.00

7,494,000.00

JUMLAH A

16,810.56
574,605.95
12,995,535.00

7,494,000.00
7,494,000.00
63,494,000.00

3,085,578.29
41,325,659.92
56,920,443.30

61,500.00

2,691,855.00
104,023,536.51

REKAPITULASI
Pekerjaan
Tahun

No.

: Pengadaan Landscape & Pengaspalan Jalan Renovasi Rumjab Kapolda Kaltim


: 2014

Uraian Pekerjaan

PEKERJAAN LANDSCAPE

PEKERJAAN PERKERASAN ASPAL


Jumlah
PPN 10%
Total
Dibuatkan

ASI

lan Renovasi Rumjab Kapolda Kaltim

Volume
63,494,000.00
104,023,536.51
167,517,536.51
16,751,753.65
184,269,290.16
184,269,000.00
Balikpapan, 27 januari 2014
CV. Putri Masamba

Dewi Risnawati
Direktur