RISK ASSESSMENT

PROJECT:

CE O716A/2008

SITE :

CAMPUS

JOB UNDER RISK


ASSESSMENT:

HOT WORKS
VIJAY KUMAR

NAME OF THE ASSESSOR:

IDENTIFIED
HAZARD

HAZARD
EFFECT

Compressed
gas cylinders/
welding
transformers.
Gas cylinders
for water
proofing work;
Steel bar
cutting works.

Creation of
spark, fire;
Explosion;
damage to
property and
personal
injury.

Work in open
area.

Physical
exertion/heat
stress.

INITIAL RISK
RATING
NUM
BER

SEVE
RITY

LIKELI
HOOD

RISK
RATE

25

25

DATE OF ASSESSMENT:

03rd Mar 2012

POSITION OF THE
ASSESSOR:

EHS OFFICER

EXISTING
CONTROL MEASURES &
WHEHER THE RISK IS
ACCEPTABLE

Transformers are in good


Condition with test
certificates. Gas cylinders
are good in condition and are
fitted with flash back
arresters.

Nil

Applicable legal requirements:


1. DM code of construction
safety practice Chapter -15.

Signature of assessor

CONTROL
MEASURES ADDED
All the hot works viz. blinding,
water proof sheet fixing,
welding should be carried out
only on obtaining hot work
permits.
Fire extinguishers to be
provided at close proximity.
Ensure that flash back arresters
are provided on each cylinder of
oxy acetylene system.
All proper PPEs for the welders
including fire blankets and fire
proof aprons should be
available.
Provide cool drinking water
when the workers work in hot
sun if needed give ORS.

REMARKS
NUM
BER

SEVE
RITY

LIKELI
HOOD

RISK
RATE

Risk
acceptable

Risk
acceptable

Note: frequent tool box talk


shall be conducted on this
subject.
Legal Requirement Complied
Yes.

Date of review:

Page 1 of 1

FINAL RISK RATING

02nd Sep 2013


Ref. no.: UES-09/ F-004
Issue date: 28.02.11