BILL OF ENGINEERING MEASUREMENT AND EVALUATION

THREE CANAL REGULATORS


Item No

Description

A1

Earthworks

A1.01

Canal Excavation in any material except igneous rock, load and haul to form
embankment and associated roadways

A1.02

Overhaul of borrow materials

A1.03

Supply, place and compact laterite


surfacing for service roads.

A1.04

250
105,750

2,500

Place topsoil and plant grass on outer side


slopes and crest of embankment of canal regulator

A1.05

Rip-rap Protection

A1.06

Construction of coarse sand filter and


blanket

A1.07

QTY

2,300
280

160

Rubble stone pitching protection (150mm


thickness)

Total Sub Section A Carried Forward

400

BILL OF ENGINEERING MEASUREMENT AND EVALUATION


THREE CANAL REGULATORS
Item No

Description

QTY

Brought Forward
A2

Structural Works

A2.01

Excavate for Canal regulator structure

A2.02

Supply place and compact backfill for

6,500

structures
A2.03

Concrete for structure

650
750
140

(a) Structural Concrete Class A


(b) Structural Concrete Class B
(c) Structural Concrete Class E
A2.04

Reinforcement including cutting bending

84,920

and fixing
A2.06

2,800

Supply and install Armco type rectangular


steel gates for turn outs
(a) size 1200mmm - model 10.00

A2.07

5
1,500

Miscellaneous metal works.

Total Section B to Summary Sheet

BILL OF ENGINEERING MEASUREMENT AND EVALUATION


SUMMARY SHEET
Section

Description

Construction of a Typical Canal Regulator

Net Total
Three number
Add 5% General Contingency

Page
3

Sub Total
Add 5% VAT
Grand Total

T AND EVALUATION

TORS

Units

Rate N

Amount

cu.m
st.cu.m

cu.m

sq.m
cu.m

sq.m

sq.m

T AND EVALUATION

TORS

Units

Rate N

Amount

cu.m

cu.m

cu.m
cu.m
cu.m

kg

No
kg

NT AND EVALUATION
T
Amount N
-

You might also like