TENAGA

ALAT

No.

JENIS PERALATAN

KODE
ALAT

2a

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30
31.
32.

ASPHALT MIXING PLANT


ASPHALT FINISHER
ASPHALT SPRAYER
BULLDOZER 100-150 HP
COMPRESSOR 4000-6500 L\M
CONCRETE MIXER 0.3 - 0.6 M3
CRANE 10-15 TON
DUMP TRUCK 3-5 M3
DUMP TRUCK
EXCAVATOR 80-140 HP
FLAT BED TRUCK 3-4 M3
GENERATOR SET
MOTOR GRADER >100 HP
TRACK LOADER 75-100 HP
WHEEL LOADER 1.0-1.6 M3
THREE WHEEL ROLLER 6-8 T
TANDEM ROLLER 6-8 T.
TIRE ROLLER 8-10 T.
VIBRATORY ROLLER 5-8 T.
CONCRETE VIBRATOR
STONE CRUSHER
WATER PUMP 70-100 mm
WATER TANKER 3000-4500 L.
PEDESTRIAN ROLLER
TAMPER
JACK HAMMER
FULVI MIXER
CONCRETE PUMP
TRAILER 20 TON
PILE DRIVER + HAMMER
CRANE ON TRACK 35 TON
WELDING SET

E01
E02
E03
E04
E05
E06
E07
E08
E09
E10
E11
E12
E13
E14
E15
E16
E17
E18
E19
E20
E21
E22
E23
E24
E25
E25
E27
E28
E29
E30
E31
E32

KAPASITAS
ALAT

HARGA
ALAT

ALAT YANG DIPAKAI


JAM
UMUR

KERJA

ALAT

1 TAHUN

(HP)

(Tahun)

(Tahun)

(Jam)

HP

Cp

500.0
#REF!

100.0 T/Jam
#REF! #REF!

250.0 #REF! -

#REF! #REF!

Err:504 Err:504
#REF! #REF!

Err:504
#REF!
Err:504
#REF!

Err:504
#REF!
Err:504
#REF!

Err:504 Err:504
#REF! #REF!

3,000,000,000
#REF!

10.0
#REF!

1,600.0
#REF!

250,000,000
#REF!

2.0
#REF!

20,000.0
#REF!

33.
34.

BORE PILE MACHINE


KETERANGAN :

E33

1.
2.
3.
4.
5.
6.
7.
8.

Tingkat Suku Bunga


=
Upah Operator / Sopir / Mekanik
=
Upah Pembantu Operator/Sopir/Mekanik
=
Harga Bahan Bakar Bensin
=
Harga Bahan Bakar Solar
=
Minyak Pelumas
=
Pajak Pertambahan Nilai (PPN) diperhitungkan pada Lembar Rekapitulasi B
Khusus AMP, biaya bahan bakar ditambah (untuk pemanasan material) sebe

ANALISA BIAYA SEWA PERALATAN PER JAM KERJA

ALAT YANG DIPAKAI


HARGA

NILAI
SISA
ALAT

ALAT

FAKTOR
PENGEMBALIAN
MODAL

BIAYA PASTI PER JAM


BIAYA

ASURANSI

TOTAL

BIAYA
BAHAN BAKAR & PELUMAS

PENGEM-

DAN

BIAYA

BAHAN

MINYAK

BALIAN

LAIN-LAIN

PASTI / JAM

BAKAR

PELUMAS

(Rp.)

(Rp.)

Lt/HP/Jam

Ltr/HP/Jam

BIAYA

MODAL
(Rp.)

(Rp.)

(Rp.)

(Rp.)
f1 x HP x

(10% X B)

i(1+i)^A

(B - C) x D

0.002 x B

-----------

-----------

-----------

(1+i)^A-1

(e1 + e2)

0.125

0.01

s/d

s/d

Harga BBM
+

0.175

0.02

f2 x HP x
Harga Olie

e1

e2

f1

f2

10

11

12

13

14

15

16

0.1500
#REF!
0.1500
0.1500
0.1500
#REF!
0.1500
0.1500
0.1500
0.1500
0.1500
0.1500
0.1500
0.1500
0.1500
0.1500
0.1500
0.1500
0.1500
0.1500
0.1500
0.1500
0.1500
0.1500
0.1500
0.1500
0.1500
0.1250
0.1250
0.1250
0.1250
0.1250

0.0150
#REF!
0.0150
0.0150
0.0150
#REF!
0.0150
0.0150
0.0150
0.0150
0.0150
0.0150
0.0150
0.0150
0.0150
0.0150
0.0150
0.0150
0.0150
0.0150
0.0150
0.0150
0.0150
0.0150
0.0150
0.0150
0.0150
0.0100
0.0100
0.0100
0.0100
0.0100

3,000,000,000
#REF!
250,000,000
#REF!

300,000,000
#REF!
#VALUE!
25,000,000
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

0.22251
#REF!
#VALUE!
0.63872
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

375,493.46
#REF!
#VALUE!
7,185.55
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

3,750.00
#REF!
#VALUE!
25.00
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

379,243.46
#REF!
#VALUE!
7,210.55
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

618,750.00
#REF!
#VALUE!
309,375.00
#REF!
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

0.1250

0.0100

#VALUE!

#REF! % per-tahun
Rupiah per-orang/jam
Rupiah per-orang/jam
Rupiah per-liter
Rupiah per-liter
Rupiah per-liter
ada Lembar Rekapitulasi Biaya Pekerjaan
pemanasan material) sebesar : 12 Liter x (Kapasitas AMP Riil = 0.7 x Kapasitas AMP/Jam) x Harga BBM Solar , (kolom 16)

BIAYA OPERASI PER JAM KERJA


WORKSHOP
KOEF.

BIAYA

TOTAL

PERBAIKAN & PERAWATAN


KOEF.

BIAYA

UPAH

TOTAL

BIAYA

OPERATOR PEMBANTU

BIAYA

SEWA ALAT

/ SOPIR

OPERATOR

OPERASI

PER

/ SOPIR

/ JAM

JAM KERJA

(Rp.)

(Rp.)

(Rp.)

(Rp.)

1 Orang

1 Orang
F+G+H+I

E+J

KET.

(Rp.)

(Rp.)

0.0625

(g1 x B')

0.125

(g1 x B')

Per

Per

s/d

-----

s/d

-----------

Jam Kerja

Jam Kerja

0.0875

0.175

g1

g1

17

18

17

18

19

20

21

22

23

0.1500
0.0000
0.0000
0.1500
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

281,250.00
#REF!
#VALUE!
1,875.00
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

0.1500
#REF!
0.1500
0.1500
0.1500
#REF!
0.1500
0.1500
0.1500
0.1500
0.1500
0.1500
0.1500
0.1500
0.1500
0.1500
0.1500
0.1500
0.1500
0.1500
0.1500
0.1500
0.1500
0.1500
0.1500
0.1500
0.1250
0.1250
0.1250
0.1250
0.1250
0.1250

281,250.00
#REF!
#VALUE!
1,875.00
#REF!
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

6,000.00
0.00
0.00
6,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

15,000.00
0.00
0.00
5,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

921,000.00
#REF!
#VALUE!
324,125.00
#REF!
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

1,300,243.46
0.00
#REF!
#REF!
#VALUE!
331,335.55 Usia 3 th
#REF! Tid
#VALUE!
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

0.1250

#VALUE!

0.00

0.00

#VALUE!

#VALUE!

URAIAN ANALISA ALAT


No.

A.
1.
2.
3.
4.

5.

B.
1.

URAIAN

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
a.
b.
c.
Alat Yang Dipakai : a.
b.
c.

KODE

Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat (*)

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

KOEF.

BULLDOZER 100-150 HP
Pw
200
Cp
A
2.0
W
2,000.0
B
250,000,000
A'
2.0
W'
2,000.0
B'
250,000,000

25,000,000

i x (1 + i)^A'
(1 + i)^A' - 1

0.63872

( B' - C ) x D
W'

71,855.50

250.00

(Dibulatkan)

72,106.00

1.

Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms

285,000.00

2.

Pelumas

57,000.00

3.

Perawatan dan
perbaikan

(12,5 % - 17,5 %) x B'


W'

18,750.00

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operato= ( 1 Orang / Jam ) x U2

L
M

10,714.29
5,714.29

Biaya Operasi per Jam = (H+I+K+L+M) (Dibulatkan) P

377,179.00

D.

TOTAL BIAYA SEWA ALAT / JAM

449,285.00

E.
1.
2.
3.
4.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

0.002 x B'
W'

Biaya Pasti per Jam = ( E + F )


C.

4.
5.

BIAYA OPERASI PER JAM KERJA

= (0.01-0.02 Ltr/HP/Jam) x Pw x Mp

(G+P)

i
U1
U2
Mb

18.00
10,714.29
5,714.29
5,000.00

5.
6.
7.

Bahan Bakar Solar


Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

Ms
Mp

9,500.00
19,000.00

Lampung Selatan 28 Juni 2012


PT. DIRGANTARA ALAM

NENENG NURCHAYATI
Direktur Utama

URAIAN ANALISA ALAT


No.

A.
1.
2.
3.
4.

5.

B.
1.

URAIAN

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
a.
b.
c.
Alat Yang Dipakai : a.
b.
c.

KODE

Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat (*)

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

KOEF.

DUMP TRUCK 3-5 M3


Pw
95.0
Cp
6.0
A
5.0
W
2,000.0
B
155,000,000
A'
5.0
W'
2,000.0
B'
155,000,000

15,500,000

i x (1 + i)^A'
(1 + i)^A' - 1

0.27741

( B' - C ) x D
W'

19,349.33

155.00

(Dibulatkan)

19,504.00

1.

Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms

135,375.00

2.

Pelumas

42,750.00

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

Biaya Pasti per Jam = ( E + F )


C.

0.002 x B'
W'

BIAYA OPERASI PER JAM KERJA

= (0.01-0.02 Ltr/HP/Jam) x Pw x Mp

3.

(12,5 % - 17,5 %) x B'


W'

11,625.00

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operato= ( 1 Orang / Jam ) x U2

L
M

10,714.29
5,714.29

Biaya Operasi per Jam = (H+I+K+L+M) (Dibulatkan) P

206,179.00

D.

TOTAL BIAYA SEWA ALAT / JAM

225,683.00

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir / Mekanik
Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

4.
5.

Perawatan dan
perbaikan

(G+P)

i
U1
U2
Mb
Ms
Mp

12.00
10,714.29
5,714.29
9,500.00
30,000.00

Lampung Selatan 28 Juni 2012


PT. DIRGANTARA ALAM

NENENG NURCHAYATI
Direktur Utama

URAIAN ANALISA ALAT


No.

A.
1.
2.
3.
4.

5.

B.
1.

URAIAN

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
a.
b.
c.
Alat Yang Dipakai : a.
b.
c.

Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat (*)

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

KODE

KOEF.

Pw
Cp
A
W
B
A'
W'
B'

DUMP TRUCK 10 M3
125.0
10.0
2.0
2,000.0
225,000,000
2.0
2,000.0
225,000,000

22,500,000

2.

Faktor Angsuran Modal

i x (1 + i)^A'
(1 + i)^A' - 1

0.59170

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

( B' - C ) x D
W'

59,909.43

225.00

(Dibulatkan)

60,134.00

1.

Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms

178,125.00

2.

Pelumas

56,250.00

3.

Perawatan dan
perbaikan

(12,5 % - 17,5 %) x B'


W'

16,875.00

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operato= ( 1 Orang / Jam ) x U2

L
M

5,000.00
4,000.00

Biaya Operasi per Jam = (H+I+K+L+M) (Dibulatkan) P

260,250.00

D.

TOTAL BIAYA SEWA ALAT / JAM

320,384.00

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir / Mekanik
Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

b. Asuransi, dll =

0.002 x B'
W'

Biaya Pasti per Jam = ( E + F )


C.

4.
5.

BIAYA OPERASI PER JAM KERJA

= (0.01-0.02 Ltr/HP/Jam) x Pw x Mp

(G+P)

i
U1
U2
Mb
Ms
Mp

12.00
10,714.29
5,714.29
9,500.00
30,000.00

Lampung Selatan 28 Juni 2012


PT. DIRGANTARA ALAM

NENENG NURCHAYATI
Direktur Utama

URAIAN ANALISA ALAT


No.

URAIAN

KODE

KOEF.

A.
1.
2.
3.
4.

5.

B.
1.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
a.
b.
c.
Alat Yang Dipakai : a.
b.
c.

Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat (*)

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

EXCAVATOR 80-140 HP
Pw
80.0
Cp
0.75
A
5.0
W
1,250.0
B
450,000,000
A'
5.0
W'
1,250.0
B'
450,000,000

45,000,000

i x (1 + i)^A'
(1 + i)^A' - 1

0.27741

( B' - C ) x D
W'

89,880.75

720.00

(Dibulatkan)

90,601.00

1.

Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms

114,000.00

2.

Pelumas

36,000.00

3.

Perawatan dan
perbaikan

(12,5 % - 17,5 %) x B'


W'

5,400.00

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operato= ( 1 Orang / Jam ) x U2

L
M

10,714.29
5,714.29

Biaya Operasi per Jam = (H+I+K+L+M) (Dibulatkan) P

171,829.00

D.

TOTAL BIAYA SEWA ALAT / JAM

262,430.00

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

0.002 x B'
W'

Biaya Pasti per Jam = ( E + F )


C.

4.
5.

BIAYA OPERASI PER JAM KERJA

= (0.01-0.02 Ltr/HP/Jam) x Pw x Mp

(G+P)

i
U1
U2
Mb
Ms
Mp

12.00
10,714.29
5,714.29
9,500.00
30,000.00

Lampung Selatan 28 Juni 2012


PT. DIRGANTARA ALAM

NENENG NURCHAYATI.S.Sos
Direktur Utama

URAIAN ANALISA ALAT


No.

A.
1.
2.
3.
4.

5.

B.
1.

URAIAN

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
a.
b.
c.
Alat Yang Dipakai : a.
b.
c.

KODE

Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat (*)

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

KOEF.

VIBRATORY ROLLER 5-8 T.


Pw
75.0
Cp
10.0
A
3.0
W
2,000.0
B
175,000,000
A'
3.0
W'
2,000.0
B'
175,000,000

BIAYA PASTI PER JAM KERJA


17,500,000

i x (1 + i)^A'
(1 + i)^A' - 1

0.45992

( B' - C ) x D
W'

36,219.00

175.00

(Dibulatkan)

36,394.00

1.

Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms

106,875.00

2.

Pelumas

33,750.00

3.

Perawatan dan
perbaikan

(12,5 % - 17,5 %) x B'


W'

13,125.00

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operato= ( 1 Orang / Jam ) x U2

L
M

10,714.29
5,714.29

b. Asuransi, dll =

0.002 x B'
W'

Biaya Pasti per Jam = ( E + F )


C.

4.
5.

BIAYA OPERASI PER JAM KERJA

= (0.01-0.02 Ltr/HP/Jam) x Pw x Mp

Biaya Operasi per Jam = (H+I+K+L+M) (Dibulatkan) P

170,179.00

D.

TOTAL BIAYA SEWA ALAT / JAM

206,573.00

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

(G+P)

i
U1
U2
Mb
Ms
Mp

18.00
10,714.29
5,714.29
9,500.00
30,000.00

Lampung Selatan 28 Juni 2012


PT. DIRGANTARA ALAM

NENENG NURCHAYATI
Direktur Utama

URAIAN ANALISA ALAT


No.

A.
1.
2.
3.
4.

5.

B.
1.

URAIAN

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
a.
b.
c.
Alat Yang Dipakai : a.
b.
c.

KODE

Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat (*)

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

KOEF.

WATER TANKER 3000-4500 L.


Pw
100.0
Cp
4,000.0
A
5.0
W
2,000.0
B
150,000,000
A'
5.0
W'
2,000.0
B'
150,000,000

15,000,000

i x (1 + i)^A'
(1 + i)^A' - 1

0.27741

( B' - C ) x D
W'

18,725.16

b. Asuransi, dll =

0.002 x B'
W'

150.00

(Dibulatkan)

18,875.00

1.

Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms

142,500.00

2.

Pelumas

45,000.00

3.

Perawatan dan
perbaikan

(12,5 % - 17,5 %) x B'


W'

1,125.00

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operato= ( 1 Orang / Jam ) x U2

L
M

10,714.29
5,714.29

Biaya Operasi per Jam = (H+I+K+L+M) (Dibulatkan) P

205,054.00

D.

TOTAL BIAYA SEWA ALAT / JAM

223,929.00

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

Biaya Pasti per Jam = ( E + F )


C.

4.
5.

BIAYA OPERASI PER JAM KERJA

= (0.01-0.02 Ltr/HP/Jam) x Pw x Mp

(G+P)

i
U1
U2
Mb
Ms
Mp

12.00
10,714.29
5,714.29
8,000.00
9,500.00
30,000.00

Lampung Selatan 28 Juni 2012

URAIAN ANALISA ALAT


No.

A.
1.
2.
3.

URAIAN

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas

KODE

Pw
Cp

KOEF.

TAMPER
6.5
0.170

4.

5.

B.
1.

Alat Baru

a.
b.
c.
Alat Yang Dipakai : a.
b.
c.

Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat (*)

1.5
2,666.7
7,500,000
1.5
2,666.7
7,500,000

750,000

i x (1 + i)^A'
(1 + i)^A' - 1

0.68336

( B' - C ) x D
W'

1,729.76

5.63

1,735.00

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

0.002 x B'
W'

Biaya Pasti per Jam = ( E + F )


C.

A
W
B
A'
W'
B'

(Dibulatkan)

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Mb

7,800.00

2.

Pelumas

2,925.00

3.

Perawatan dan
perbaikan

(12,5 % - 17,5 %) x B'


W'

42.19

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operato= ( 1 Orang / Jam ) x U2

L
M

7,142.00
3,928.57

Biaya Operasi per Jam = (H+I+K+L+M) (Dibulatkan) P

21,838.00

D.

TOTAL BIAYA SEWA ALAT / JAM

23,573.00

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

4.
5.

= (0.01-0.02 Ltr/HP/Jam) x Pw x Mp

(G+P)

i
U1
U2
Mb
Ms
Mp

2.00
7,142.00
3,928.57
8,000.00
9,500.00
30,000.00

Lampung Selatan 28 Juni 2012


PT. DIRGANTARA ALAM

NENENG NURCHAYATI
Direktur Utama

URAIAN ANALISA ALAT


No.

A.
1.
2.
3.
4.

5.

B.
1.

URAIAN

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
a.
b.
c.
Alat Yang Dipakai : a.
b.
c.

KODE

Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat (*)

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

C.

CONCRETE MIXER 0.3 - 0.6 M3


Pw
15.0
Cp
350.0
A
3.0
W
2,666.7
B
6,500,000
A'
3.0
W'
2,666.7
B'
6,500,000

650,000

i x (1 + i)^A'
(1 + i)^A' - 1

0.34675

( B' - C ) x D
W'

760.69

4.88

766.00

0.002 x B'
W'

Biaya Pasti per Jam = ( E + F )

KOEF.

(Dibulatkan)

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Mb

18,000.00

2.

Pelumas

6,750.00

3.

Perawatan dan
perbaikan

(12,5 % - 17,5 %) x B'


W'

36.56

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operato= ( 1 Orang / Jam ) x U2

L
M

10,714.29
5,714.29

Biaya Operasi per Jam = (H+I+K+L+M) (Dibulatkan) P

41,215.00

TOTAL BIAYA SEWA ALAT / JAM

41,981.00

4.
5.

D.

= (0.01-0.02 Ltr/HP/Jam) x Pw x Mp

(G+P)

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

i
U1
U2
Mb
Ms
Mp

2.00
10,714.29
5,714.29
8,000.00
9,500.00
30,000.00

Lampung Selatan 28 Juni 2012


PT. DIRGANTARA ALAM

NENENG NURCHAYATI
Direktur Utama

URAIAN ANALISA ALAT


No.

A.
1.
2.
3.
4.

5.

B.
1.

URAIAN

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
a.
b.
c.
Alat Yang Dipakai : a.
b.
c.

Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat (*)

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

Biaya Pasti per Jam = ( E + F )


C.

KODE

BIAYA OPERASI PER JAM KERJA

Pw
Cp
A
W
B
A'
W'
B'

KOEF.

GENERATOR SET
175.0
125.0
5.0
2,000.0
77,500,000
5.0
2,000.0
77,500,000

7,750,000

i x (1 + i)^A'
(1 + i)^A' - 1

0.27741

( B' - C ) x D
W'

9,674.66

77.50

9,752.00

0.002 x B'
W'
(Dibulatkan)

1.

Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms

249,375.00

2.

Pelumas

78,750.00

3.

Perawatan dan
perbaikan

(12,5 % - 17,5 %) x B'


W'

581.25

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operato= ( 1 Orang / Jam ) x U2

L
M

10,714.29
5,714.29

Biaya Operasi per Jam = (H+I+K+L+M) (Dibulatkan) P

345,135.00

D.

TOTAL BIAYA SEWA ALAT / JAM

354,887.00

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

4.
5.

= (0.01-0.02 Ltr/HP/Jam) x Pw x Mp

(G+P)

i
U1
U2
Mb
Ms
Mp

12.00
10,714.29
5,714.29
8,000.00
9,500.00
30,000.00

Lampung Selatan 28 Juni 2012


PT. DIRGANTARA ALAM

NENENG NURCHAYATI
Direktur Utama

URAIAN ANALISA ALAT


No.

A.
1.
2.
3.
4.

5.

URAIAN

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
a.
b.
c.
Alat Yang Dipakai : a.
b.
c.

Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat (*)

KODE

KOEF.

EXCAVATOR LONG ARM


Pw
80.0
Cp
0.50
A
5.0
W
1,250.0
B
375,000,000
A'
5.0
W'
1,250.0
B'
375,000,000

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

37,500,000

i x (1 + i)^A'
(1 + i)^A' - 1

0.27741

( B' - C ) x D
W'

74,900.63

600.00

(Dibulatkan)

75,501.00

1.

Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms

114,000.00

2.

Pelumas

36,000.00

3.

Perawatan dan
perbaikan

(12,5 % - 17,5 %) x B'


W'

4,500.00

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operato= ( 1 Orang / Jam ) x U2

L
M

10,714.29
5,714.29

Biaya Operasi per Jam = (H+I+K+L+M) (Dibulatkan) P

170,929.00

D.

TOTAL BIAYA SEWA ALAT / JAM

246,430.00

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

0.002 x B'
W'

Biaya Pasti per Jam = ( E + F )


C.

4.
5.

BIAYA OPERASI PER JAM KERJA

= (0.01-0.02 Ltr/HP/Jam) x Pw x Mp

(G+P)

i
U1
U2
Mb
Ms
Mp

12.00
10,714.29
5,714.29
5,000.00
9,500.00
30,000.00

Lampung Selatan 28 Juni 2012


PT. DIRGANTARA ALAM

NENENG NURCHAYATI
Direktur Utama

URAIAN ANALISA ALAT

No.

A.
1.
2.
3.
4.

5.

B.
1.

URAIAN

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
a.
b.
c.
Alat Yang Dipakai : a.
b.
c.

KODE

Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat (*)

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

BABY ROLLER 3 TON


Pw
0.6
Cp
0.6
A
3.0
W
2,000.0
B
75,000,000
A'
3.0
W'
2,000.0
B'
75,000,000

KOEF.

BIAYA PASTI PER JAM KERJA


7,500,000

i x (1 + i)^A'
(1 + i)^A' - 1

0.45992

( B' - C ) x D
W'

15,522.43

75.00

(Dibulatkan)

15,597.00

1.

Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms

855.00

2.

Pelumas

270.00

3.

Perawatan dan
perbaikan

(12,5 % - 17,5 %) x B'


W'

5,625.00

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operato= ( 1 Orang / Jam ) x U2

L
M

10,714.29
5,714.29

Biaya Operasi per Jam = (H+I+K+L+M) (Dibulatkan) P

23,179.00

D.

TOTAL BIAYA SEWA ALAT / JAM

38,776.00

E.
1.
2.
3.
4.
5.
6.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas

b. Asuransi, dll =

0.002 x B'
W'

Biaya Pasti per Jam = ( E + F )


C.

4.
5.

BIAYA OPERASI PER JAM KERJA

= (0.01-0.02 Ltr/HP/Jam) x Pw x Mp

(G+P)

i
U1
U2
Mb
Ms
Mp

18.00
10,714.29
5,714.29
8,000.00
9,500.00
30,000.00

7.

PPN diperhitungkan pada lembar Rekapitulasi


Biaya Pekerjaan
Lampung Selatan 28 Juni 2012
PT. DIRGANTARA ALAM

NENENG NURCHAYATI
Direktur Utama

URAIAN ANALISA ALAT


No.

A.
1.
2.
3.
4.

5.

B.
1.

URAIAN

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
a.
b.
c.
Alat Yang Dipakai : a.
b.
c.

Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat (*)

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

Pw
Cp
A
W
B
A'
W'
B'

KOEF.

VIBRATOR BETON
15.0
3.0
5.0
2,000.0
7,000,000
5.0
2,000.0
7,000,000

700,000

i x (1 + i)^A'
(1 + i)^A' - 1

0.27741

( B' - C ) x D
W'

873.84

7.00

881.00

0.002 x B'
W'

Biaya Pasti per Jam = ( E + F )


C.

KODE

(Dibulatkan)

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Mb

18,000.00

2.

Pelumas

6,750.00

3.

Perawatan dan
perbaikan

52.50

= (0.01-0.02 Ltr/HP/Jam) x Pw x Mp

(12,5 % - 17,5 %) x B'


W'

4.
5.

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operato= ( 1 Orang / Jam ) x U2

L
M

10,714.29
5,714.29

Biaya Operasi per Jam = (H+I+K+L+M) (Dibulatkan) P

41,231.00

D.

TOTAL BIAYA SEWA ALAT / JAM

42,112.00

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

(G+P)

i
U1
U2
Mb
Ms
Mp

12.00
10,714.29
5,714.29
8,000.00
9,500.00
30,000.00

Lampung Selatan 28 Juni 2012


PT. DIRGANTARA ALAM

NENENG NURCHAYATI
Direktur Utama

URAIAN ANALISA ALAT


No.

A.
1.
2.
3.
4.

5.

B.
1.
2.

URAIAN

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
a.
b.
c.
Alat Yang Dipakai : a.
b.
c.

KODE

Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat (*)

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B
Faktor Angsuran Modal

i x (1 + i)^A'

Pw
Cp
A
W
B
A'
W'
B'

KOEF.

POMPA AIR 4"


15.0
5.0
5.0
2,000.0
5,750,000
5.0
2,000.0
5,750,000

575,000

0.21216

(1 + i)^A' - 1
3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

( B' - C ) x D
W'
0.002 x B'
W'

Biaya Pasti per Jam = ( E + F )


C.

(Dibulatkan)

548.96

5.75

555.00

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Mb

18,000.00

2.

Pelumas

6,750.00

3.

Perawatan dan
perbaikan

(12,5 % - 17,5 %) x B'


W'

43.13

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operato= ( 1 Orang / Jam ) x U2

L
M

10,714.29
5,714.29

Biaya Operasi per Jam = (H+I+K+L+M) (Dibulatkan) P

41,222.00

D.

TOTAL BIAYA SEWA ALAT / JAM

41,777.00

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

4.
5.

= (0.01-0.02 Ltr/HP/Jam) x Pw x Mp

(G+P)

i
U1
U2
Mb
Ms
Mp

2.00
10,714.29
5,714.29
8,000.00
30,000.00

Lampung Selatan 28 Juni 2012


PT. DIRGANTARA ALAM

NENENG NURCHAYATI
Direktur Utama

SATUAN

ZER 100-150 HP
HP
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

Rupiah
-

Rupiah

Rupiah

Rupiah

Rupiah
Rupiah
Rupiah

Rupiah
Rupiah
Rupiah
Rupiah

% / Tahun
Rp./Jam
Rp./Jam
Liter

KET.

Usia 3 th
Usia 3 th
Usia 3 th

Liter
Liter

atan 28 Juni 2012


IRGANTARA ALAM

ENG NURCHAYATI

OK
SATUAN

TRUCK 3-5 M3
HP
Ton
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

Rupiah
-

Rupiah

Rupiah

Rupiah

Rupiah
Rupiah

KET.

Alat baru
Alat baru
Alat baru

Rupiah

Rupiah
Rupiah
Rupiah
Rupiah

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

atan 28 Juni 2012


IRGANTARA ALAM

ENG NURCHAYATI

SATUAN

TRUCK 10 M3
HP
Ton
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

Rupiah

KET.

Alat baru
Alat baru
Alat baru

Rupiah

Rupiah

Rupiah

Rupiah
Rupiah
Rupiah

Rupiah
Rupiah
Rupiah
Rupiah

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter

atan 28 Juni 2012


IRGANTARA ALAM

ENG NURCHAYATI

ok
SATUAN

KET.

ATOR 80-140 HP
HP
M3
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

Rupiah
-

Rupiah

Rupiah

Rupiah

Rupiah
Rupiah
Rupiah

Rupiah
Rupiah
Rupiah
Rupiah

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter

Usia 3 th
Usia 3 th
Usia 3 th

atan 28 Juni 2012


NTARA ALAM

NURCHAYATI.S.Sos

SATUAN

RY ROLLER 5-8 T.
HP
Ton
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

Rupiah
-

Rupiah

Rupiah

Rupiah

Rupiah
Rupiah
Rupiah

Rupiah
Rupiah

KET.

Alat baru
Alat baru
Alat baru

Rupiah
Rupiah

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter

atan 28 Juni 2012


IRGANTARA ALAM

ENG NURCHAYATI

SATUAN

NKER 3000-4500 L.
HP
Liter
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

Rupiah
-

Rupiah

KET.

Alat baru
Alat baru
Alat baru

Rupiah

Rupiah

Rupiah
Rupiah
Rupiah

Rupiah
Rupiah
Rupiah
Rupiah

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

atan 28 Juni 2012

ok
SATUAN

TAMPER
HP
Ton

KET.

Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

Rupiah
-

Rupiah

Rupiah

Rupiah

Rupiah
Rupiah
Rupiah

Rupiah
Rupiah
Rupiah
Rupiah

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

atan 28 Juni 2012


IRGANTARA ALAM

Usia 3 th
Usia 3 th
Usia 3 th

ENG NURCHAYATI

0k
SATUAN

KET.

MIXER 0.3 - 0.6 M3


HP
Liter
Tahun
Jam
Rupiah
Tahun Usia 3 th
Jam
Usia 3 th
Rupiah Usia 3 th

Rupiah
-

Rupiah

Rupiah

Rupiah

Rupiah
Rupiah
Rupiah

Rupiah
Rupiah
Rupiah
Rupiah

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

atan 28 Juni 2012


IRGANTARA ALAM

ENG NURCHAYATI

SATUAN

KET.

ERATOR SET
HP
KVA
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

Rupiah
-

Rupiah

Rupiah

Rupiah

Alat baru
Alat baru
Alat baru

Rupiah
Rupiah
Rupiah

Rupiah
Rupiah
Rupiah
Rupiah

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

atan 28 Juni 2012


IRGANTARA ALAM

ENG NURCHAYATI

SATUAN

TOR LONG ARM


HP
M3
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

KET.

Usia 3 th
Usia 3 th
Usia 3 th

Rupiah
-

Rupiah

Rupiah

Rupiah

Rupiah
Rupiah
Rupiah

Rupiah
Rupiah
Rupiah
Rupiah

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

atan 28 Juni 2012


IRGANTARA ALAM

ENG NURCHAYATI

ok
SATUAN

ROLLER 3 TON
HP
Ton
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

Rupiah
-

Rupiah

Rupiah

Rupiah

Rupiah
Rupiah
Rupiah

Rupiah
Rupiah
Rupiah
Rupiah

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

KET.

Alat baru
Alat baru
Alat baru

atan 28 Juni 2012


IRGANTARA ALAM

ENG NURCHAYATI

ok
SATUAN

KET.

ATOR BETON
HP
HP
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

Rupiah
-

Rupiah

Rupiah

Rupiah

Rupiah
Rupiah
Rupiah

Usia 3 th
Usia 3 th
Usia 3 th

Rupiah
Rupiah
Rupiah
Rupiah

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

atan 28 Juni 2012


IRGANTARA ALAM

ENG NURCHAYATI

ok
SATUAN

KET.

MPA AIR 4"


HP
PK
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

Rupiah
-

Usia 3 th
Usia 3 th
Usia 3 th

Rupiah

Rupiah

Rupiah

Rupiah
Rupiah
Rupiah

Rupiah
Rupiah
Rupiah
Rupiah

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter

atan 28 Juni 2012


IRGANTARA ALAM

ENG NURCHAYATI

URAIAN ANALISA ALAT


Jenis Pekerjaan
Satuan / Unit

: Galian tanah (dengan alat)


: M3

No.

URAIAN

A ASUMSI
- Pekerjaan dilakukan secara mekanis
- Lokasi pekerjaan : daratan
- Jam kerja efektif per-hari
- Faktor pengembangan bahan
- Volume
- Waktu Pelaksanaan
- Volume perhari

INISIAL

Jk
Fk
V
T
V.1

B URUTAN KERJA
1 Tanah Saluran Dipasang Bowplang
2 Galian tanah saluran di gali dengan alat Excavator
Tanah galian di buang ke sisi dek dan tanggul
Tanaah dihamparkan dengan excavator
C PEMAKAIAN BAHAN, ALAT DAN TENAGA
C.1 BAHAN
Tidak ada bahan yang diperlukan
C.2 ALAT
1 EXCAVATOR
Kapasitas bucket
Kapasitas penggalian
Faktor bucket
Faktor efisiensi alat

V
V
Fb
Fa

Waktu Siklus
- Menggali/muat
- Lain-lain

Ts.1
T1
T2
Ts1

Kapasitas prod. /Jam

Koefisien alat / m3

V x Fb x Fa x 60
Ts1 x Fk

Q1

1 : Q1

2 ALAT BANTU
Diperlukan alat-alat bantu kecil
- Pahat / Tatah
= 2 buah
- Palu Besar
= 2 buah
C.3 TENAGA
Produksi menentukan : Excavator
Produksi Galian / hari = Jk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor

Q1
Qt
P
M

Koefisien tenaga / M3 :
- Pekerja
- Mandor

= (Jk x P) : Qt
= (Jk x M) : Qt

D ANALISA HARGA SATUAN PEKERJAAN


Didapat harga satuan pekerjaan
Rp.

10,801.00 /M3

E VOLUME PEKERJAAN YANG DIPERLUKAN :


Volume Pekerjaan
V:

#REF! M3

F WAKTU PELAKSANAAN
Volume Pekerjaan
Group Kerja

#REF! M3
1 Group

V:
n:
V

Waktu Pelaksanaan

=
( n x Qt x 7 )

#REF! Minggu

Koefisien

Satuan

8.00
1.20
#REF!
#REF!
#REF!

Jam
m3
hari
m3/hari

0.75
0.80
0.70
0.83

m3
m3
-

0.47
0.25
0.72

menit
menit
menit
menit

43.58

m3/Jam

0.0229

Jam

1.00 LS

43.58
348.60
2.00
1.00

M3/Jam
M3
orang
orang

KET.

0.046
0.023

Jam
Jam

Lampung Selatan, 28 Juni 2012


PT.DIRGANTARA ALAM

NENENG NURCHAYATRI
Direktur Utama

ANALISA HARGA SATUAN PEMBAYARAN UTAMA

Pekerjaan
Lokasi
Tahun Anggaran
Item Pekerjaan

NO.

:
:
:
:

Pembangunan Gedung kantor BRI Tanjung Karang


Kantor Wilayah BRI Tanjung karang
2015
Galian Tanah dengan Alat Berat

URAIAN

BAHAN
Solar

HARGA
SATUAN
(Rp.)

Hari
Hari

0.0353
0.0353

75,000.00
80,000.00

0.0353

316,000.00

Ltr

PERALATAN
1 Excavator Long Arm

D
E
F

PERKIRAAN
KUANTITAS

TENAGA
1 Operator
2 Mandor

SATUAN

Jam

JUMLAH (A+B+C)
BIAYA UMUM DAN KEUNTUNGAN ( 10% X D )
HARGA SATUAN ( D + E )

ANALISA HARGA SATUAN PEMBAYARAN UTAMA

Pekerjaan
Lokasi
Tahun Anggaran
Item Pekerjaan

NO.

TENAGA

BAHAN
Solar

SATUAN

PERKIRAAN
KUANTITAS

HARGA
SATUAN
(Rp.)

Ltr

PERALATAN
1 Dumb Truck

D
E
F

Pembangunan Gedung kantor BRI Tanjung Karang


Kantor Wilayah BRI Tanjung karang
2015
Pembuangan Tanah Diluar Lokasi 1-10 Km

URAIAN

:
:
:
:

Jam

JUMLAH (A+B+C)
BIAYA UMUM DAN KEUNTUNGAN ( 10% X D )
HARGA SATUAN ( D + E )

0.0800

182,000.00

TAMA

JUMLAH
HARGA
(Rp.)

2,645.50
2,821.87

5,467.37

11,146.38

11,146.38
16,613.76
1,661.38
18,275.13

TAMA

JUMLAH
HARGA
(Rp.)

14,566.91

14,566.91
14,566.91
1,456.69
16,023.60

URAIAN ANALISA PEMBAYARAN UTAMA


Jenis Pekerjaan
Satuan Pembataran

:
:

No.

URAIAN

I.
1
2
3
4
5
II.

Galian Tanah dengan Alat Berat


M3

ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : Borrow Area yg ditunjuk Direksi
Kondisi jalan : sedang/baik
Jam kerja efektif per-hari
Faktor pengembangan bahan

Tk
Fk

URUTAN KERJA
1 Lokasi yang akan digali sudah diadakan pembersihan
dan sudah distriping
2 Kualitas tanah pada borrow area sudah dinyatakan
memenuhi syarat dari labolatorium
3 Excavator menggali tanah diborrow area kemudian dinaikkan
keatas Dump Truck dan diangkut kelokasi tempat timbunan
tanggul

III.

PEMAKAIAN BAHAN, ALAT DAN TENAGA

BAHAN
Tidak ada bahan yang diperlukan

2
2.a.

KODE

ALAT
Excavator
Kapasitas bucket
Kapasitas penggalian
Faktor bucket
Faktor efisiensi alat

V
V
Fb
Fa

Waktu Siklus
- Menggali/muat
- Lain-lain

2.b.

Ts.1
T1
T2
Ts1

Kapasitas prod. /Jam

Koefisien alat / m3

Dump Truck
Kapasitas bak sekali muat
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecapatan rata-rata kosong

V x Fb x Fa x 60
Ts1 x Fk

Q1

1 : Q1

V
Fa
v1
v2

Waktu Siklus
- Waktu tempuh isi
- Waktu tempuh kosong
- Muat
- Lain-lain

=
=
=

Kapasitas prod. /jam

Koefisien alat / m3

Ts
T1
T2
T3
T4
Ts

( L : v1 ) x 60
( L : v2 ) x 60
( V : Q1 ) x 60

V x Fa x 60
Ts x Fk
1 : Q2

Q2

No.
2.c.

URAIAN

KODE

Alat bantu
Diperlukan alat-alat bantu kecil
- Sekop
- Keranjang
Pemakaian alat :
1. Excavator
2. Dump Truck
3. Alat bantu

TENAGA
Produksi menentukan : Excavator
Produksi / hari
=
Kebutuhan tenaga :
Koefisien tenaga/m3 :
-

Jam
Jam
Ls

Tk x Q1

Q1
Qt

Operator
Mandor
Pekerja

Op
M
S

Operator
Mandor
Pekerja

=
=
=

(Tk xOP) : Qt
(Tk x M) : Qt
(Tk x S) : Qt

Op
M
S

TAMA

KOEF.

7.00
1.20

SATUAN

Jam
-

Km

0.750
0.800
0.700
0.75

m3
m3
-

0.600
0.400
1.000

menit
menit
menit
menit

28.35

m3/Jam

0.0353

Jam

3.50
0.83
45.00
50.00

m3
Km/Jam
Km/Jam

KETERANGAN

1.59
2.00
3.59

menit
menit
menit
menit
menit

12.49

m3/Jam

0.0800

Jam
Bersambung

KOEF

SATUAN

KETERANGAN

Lump Sum

0.0353
0.0800
1.0000

Jam
Jam
Ls

28.35
198.45

m3/Jam
m3

1.000
1.000
1.000

orang
orang
orang

0.035
0.035
0.035

Hari
Hari
Hari

Lampung Selatan, 19 Januari 2012


PT.DIRGANTARA ALAM

NENENG NURCHAYATRI
Direktur Utama

DAFTAR KUANTITAS DAN HARGA


Nama Pekerjaan
Lokasi
Tahun Anggaran

: Pembangunan Gedung kantor BRI Tanjung Karang


: Kantor Wilayah BRI Tanjung karang
: 2015
Harga

No.

Uraian Pekerjaan

Satuan

Volume

Harga Satuan
( Rp )

Pekerjaan Persiapan
1 Mobilisasi / Demobilisasi

Ls

1.00

12,000,000.00
Sub Total I

II

Rehab Saluran Pembuangan Sekunder

1 Galian Tanah dengan Alat Berat


2 Pembuangan Tanah

M'

4,800.00

M3
M3

6,080.26
6,080.26

18,275.13
16,023.60

Sub Total II
TOTAL ( I + II )
Dibulatkan
Dua Ratus Dua Puluh Juta Lima Ratus Empat Puluh Lima Ribu Rupiah

Rupiah

Harga
Jumlah Harga
( Rp )

12,000,000.00
12,000,000.00

111,117,482.67
97,427,593.54
208,545,076.21
220,545,076.21
220,545,000.00

DAFTAR HARGA SATUAN UPAH


Pekerjaan
Lokasi
Tahun Anggaran

No.

: Pembangunan Gedung kantor BRI Tanjung Karang


: Kantor Wilayah BRI Tanjung karang
: 2015

Uraian

1 Kepala Tukang
2 Mandor
3 Tukang
4 Pekerja
5 Jaga Malam
6 Tukang Besi
7 Operator
8 Pembantu Operator
9 Supir
10 Pembantu Supir
11 Mekanik
12 Juru Ukur

Satuan

OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH

Harga Satuan

50,000.00
80,000.00
45,000.00
38,000.00
35,000.00
45,000.00
75,000.00
40,000.00
45,000.00
35,000.00
55,000.00
50,000.00

Keterangan

DAFTAR HARGA SATUAN BAHAN


Pekerjaan
Lokasi
Tahun Anggaran

No.

: Pembangunan Gedung kantor BRI Tanjung Karang


: Kantor Wilayah BRI Tanjung karang
: 2015

Uraian

1 Baja Profil
2 Balok Kayu Klas II
3 Balok Kayu Klas III
4 Balok Kayu Klas IV
5 Batu Belah Hitam
7 Batu Split 1-2
6 Batu Split 2-3
7 Bensin
8 Besi Baja IWF
9 Besi Baja Siku
10 Besi Beton Polos
11 Besi Beton Ulir
12 Geotextil Non Woven
13 Kawat Beton
14 Kawat Beronjong
15 Kawat Las
16 Kayu Begisting
17 Minyak Begisting
18 Minyak Pelumas
19 Minyak Hidroulik
20 Minyak Tranmisi
21 Gemuk
22 Minyak Bakar
23 Multiplek
24 Paku
25 Papan Kayu Klas I
26 Papan Kayu Klas III
27 Papan Kayu Klas IV
28 Pasir Cor
29 Pasir Pasang
30 Pasir Urug
31 Penyediaan Air Kerja
32 Pipa Besi
33 Semen ( PC ) 50 Kg
34 Solar
35 Tanah Timbunan
36 Kayu Gelam
38 Pintu Air Klep
39 Beton K 350 1 m
40 Karung Plastik
41 Besi Plat

Satuan

KG
M3
M3
M3
M3
M3
M3
LTR
KG
KG
KG
KG
M2
KG
UNIT
KG
M3
LTR
LTR
LTR
LTR
Kg
LTR
LBR
KG
M3
M3
M3
M3
M3
M3
LS
M
ZAK
LTR
M3
BTG
Unit
Bh
Bh
Kg

Harga Satuan

45,000.00
2,205,000.00
1,819,075.00
1,014,300.00
194,611.00
339,246.00
319,246.00
8,000.00
30,000.00
27,500.00
13,033.00
9,450.00
15,000.00
13,652.00
279,000.00
150,000.00
1,819,075.00
10,500.00
30,000.00
30,000.00
28,000.00
23,000.00
17,000.00
132,153.00
16,021.00
2,362,500.00
1,500,000.00
1,050,000.00
197,087.00
148,834.00
103,834.00
150,000.00
50,000.00
69,204.00
9,500.00
20,000.00
16,867.00
5,375,000.00
775,000.00
750.00
45,000.00

Keterangan

42 Baut
43 Fiber
44 Pipa PVC
45 Karet

Bh
Lbr
Btg
Kg

10,000.00
150,000.00
45,000.00
100,000.00

DAFTAR HARGA SATUAN ALAT


Pekerjaan
Lokasi
Tahun Anggaran

No.

: Pembangunan Gedung kantor BRI Tanjung Karang


: Kantor Wilayah BRI Tanjung karang
: 2015

Uraian

1 Buldozer 250 HP
2 Excavator Long Arm 0,05 M3
3 Excavator 0,75 M3
4 Vibrator Roller 8 - 10 Ton
5 Babby Roller 3 Ton
6 Dump Truk 8 - 10 M3
7 Dump Truk 3 - 5 M3
8 Stamper 6,5 HP
9 Concrete Mixer 0,3 M3
10 Generator
11 Pompa Air 4"
12 Concrete Vibrator
13 Mesin Las
14 Bar Bander
15 Tang Pemotong Kawat
16 Palu Pemecah Batu
17 Keranjang
18 Palu
19 Gergaji
20 Ember
21 Kotak Aduk
22 Theodolite T2
23 Waterpass, 2mm

Satuan

JAM
JAM
JAM
JAM
JAM
JAM
JAM
Jam
JAM
JAM
Jam
Jam
Hari
JAM
BH
BH
BH
BH
BH
BH
BH
hari
hari

Harga Satuan

350,000.00
316,000.00
62,000.00
207,000.00
182,000.00
22,000.00
37,000.00
35,000.00
35,000.00
75,000.00
9,000.00
50,000.00
1,000.00
42,112.00
25,000.00
15,000.00
25,002.00
1,550,000.00
1,500,000.00

Keterangan

ANALISA PERALATAN
I Data Peralatan
1 Merk
2 Model/Type
3 Tahun Pembuatan
Efesiensi Alat
Efesiensi Operator
4 Tenaga : N (Hp)
5 Kapasitas : q (M3)
6 Umur Ekonomis, Th
7 Jam keja per tahun, h (jam)
8 Produksi alat per tahun (M3/th)
9 Produksi efektif (M3/th)
10 Harga pokok alat
11 Harga bahan alat
12 Nilai sisa
13 Harga penyusutan

Hp
q
UE
h
PE
Hp

Hps

II Biaya Pemilikan
a Penyusutan
D=

Harga penyusutan
Umur alat x jam kerja

Biaya Bank,Pajak,Asuransi
0,60 x Hrg alat
Bm =
Umur alat x jam kerja

(Rp/Jam)

Bm

(Rp/Jam)

A Jumlah biaya Kepemilikan (a +b)

III Biaya Operasional Alat (per Jam)


a

Bahan Bakar & Pelumas


15 Lt Solar
0.28 Lt Oil Mesin
0.85 Lt Oil Hidroulik
0.009 Lt Tranmisi
0.07 Kg Gemuk

Rp
Rp
Rp
Rp
Rp

9,500.00
30,000.00
30,000.00
28,000.00
23,000.00
Bbp

Gaji Operator & Mekanik 1/8 x (upah Operator + Mekanik)

Pelengkapan (perangkat/Pakaian Kerja)

Biaya perbaikan =
Biaya Operasi Alat (a + b + c + d)

Jumlah Biaya Alat/Jam (A + B)


Dibulatkan

2,5% x Harga Alat


Jam kerja Alat/tahun

Gom
Pl

(Rp/Jam)

Bp

Boa

ANALISA PERALATAN
I Data Peralatan
1 Merk
2 Model/Type
3 Tahun Pembuatan
Efesiensi Alat
Efesiensi Operator
4 Tenaga : N (Hp)
5 Kapasitas : q (M3)
6 Umur Ekonomis, Th
7 Jam keja per tahun, h (jam)
8 Produksi alat per tahun (M3/th)
9 Produksi efektif (M3/th)
10 Harga pokok alat
11 Harga bahan alat
12 Nilai sisa
13 Harga penyusutan

Hp
q
UE
h
PE
Hp

Hps

II Biaya Pemilikan
a Penyusutan
D=

Harga penyusutan
Umur alat x jam kerja

Biaya Bank,Pajak,Asuransi
0,60 x Hrg alat
Bm =
Umur alat x jam kerja

(Rp/Jam)

Bm

(Rp/Jam)

A Jumlah biaya Kepemilikan (a +b)

III Biaya Operasional Alat (per Jam)


a

Bahan Bakar & Pelumas


21 Lt Solar
0.13 Lt Oil Mesin
0.03 Lt Oil Hidroulik
0.05 Lt Tranmisi
0.2 Kg Gemuk

Rp
Rp
Rp
Rp
Rp

9,500.00
30,000.00
30,000.00
28,000.00
23,000.00
Bbp

Gaji Operator & Mekanik 1/8 x (upah Operator + Mekanik)

Pelengkapan (perangkat/Pakaian Kerja)

Biaya perbaikan =
Biaya Operasi Alat (a + b + c + d)

Jumlah Biaya Alat/Jam (A + B)


Dibulatkan

Gom
Pl

11% x Harga Alat


Jam kerja Alat/tahun

(Rp/Jam)

Bp

Boa

ANALISA PERALATAN
I Data Peralatan
1 Merk
2 Model/Type
3 Tahun Pembuatan
Efesiensi Alat
Efesiensi Operator
4 Tenaga : N (Hp)
5 Kapasitas : q (M3)
6 Umur Ekonomis, Th
7 Jam keja per tahun, h (jam)
8 Produksi alat per tahun (M3/th)
9 Produksi efektif (M3/th)
10 Harga pokok alat
11 Harga bahan alat
12 Nilai sisa
13 Harga penyusutan

Hp
q
UE
h
PE
Hp

Hps

II Biaya Pemilikan
a Penyusutan
D=

Harga penyusutan
Umur alat x jam kerja

Biaya Bank,Pajak,Asuransi
0,60 x Hrg alat
Bm =
Umur alat x jam kerja

(Rp/Jam)

Bm

(Rp/Jam)

A Jumlah biaya Kepemilikan (a +b)

III Biaya Operasional Alat (per Jam)


a

Bahan Bakar & Pelumas


25 Lt Solar
0.29 Lt Oil Mesin
0.08 Lt Oil Hidroulik
0.04 Lt Tranmisi
0.04 Kg Gemuk

Rp
Rp
Rp
Rp
Rp

9,500.00
30,000.00
30,000.00
28,000.00
23,000.00
Bbp

Gaji Operator & Mekanik 1/8 x (upah Operator + Mekanik)

Pelengkapan (perangkat/Pakaian Kerja)

Biaya perbaikan =
Biaya Operasi Alat (a + b + c + d)

Jumlah Biaya Alat/Jam (A + B)


Dibulatkan

10% x Harga Alat


Jam kerja Alat/tahun

Gom
Pl

(Rp/Jam)

Bp

Boa

ANALISA PERALATAN
I Data Peralatan
1 Merk
2 Model/Type
3 Tahun Pembuatan
Efesiensi Alat
Efesiensi Operator
4 Tenaga : N (Hp)
5 Kapasitas : q (M3)
6 Umur Ekonomis, Th
7 Jam keja per tahun, h (jam)
8 Produksi alat per tahun (M3/th)
9 Produksi efektif (M3/th)
10 Harga pokok alat
11 Harga bahan alat
12 Nilai sisa
13 Harga penyusutan

Hp
q
UE
h
PE
Hp

Hps

II Biaya Pemilikan
a Penyusutan
D=

Harga penyusutan
Umur alat x jam kerja

Biaya Bank,Pajak,Asuransi
0,60 x Hrg alat
Bm =
Umur alat x jam kerja

(Rp/Jam)

Bm

(Rp/Jam)

A Jumlah biaya Kepemilikan (a +b)

III Biaya Operasional Alat (per Jam)


a

Bahan Bakar & Pelumas


13.5 Lt Solar
0.13 Lt Oil Mesin
0.07 Lt Oil Hidroulik
0.155 Lt Tranmisi
0.02 Kg Gemuk

Rp
Rp
Rp
Rp
Rp

9,500.00
30,000.00
30,000.00
28,000.00
23,000.00
Bbp

Gaji Operator & Mekanik 1/8 x (upah Operator + Mekanik)

Pelengkapan (perangkat/Pakaian Kerja)

Biaya perbaikan =
Biaya Operasi Alat (a + b + c + d)

Jumlah Biaya Alat/Jam (A + B)


Dibulatkan

Gom
Pl

12% x Harga Alat


Jam kerja Alat/tahun

(Rp/Jam)

Bp

Boa

ANALISA PERALATAN
I Data Peralatan
1 Merk
2 Model/Type
3 Tahun Pembuatan
Efesiensi Alat
Efesiensi Operator
4 Tenaga : N (Hp)
5 Umur Ekonomis, Th
6 Jam keja per tahun, h (jam)
7 Produksi efektif (M3/th)
8 Harga pokok alat
9 Harga bahan alat
10 Nilai sisa
11 Harga penyusutan

Hp
UE
h
PE
Hp

Hps

II Biaya Pemilikan
a Penyusutan
D=

Harga penyusutan
Umur alat x jam kerja

Biaya Bank,Pajak,Asuransi
0,60 x Hrg alat
Bm =
Umur alat x jam kerja

(Rp/Jam)

Bm

(Rp/Jam)

A Jumlah biaya Kepemilikan (a +b)

III Biaya Operasional Alat (per Jam)


a

Bahan Bakar & Pelumas


13.5 Lt Solar
0.13 Lt Oil Mesin
0.07 Lt Oil Hidroulik
0.155 Lt Tranmisi
0.01 Kg Gemuk

Rp
Rp
Rp
Rp
Rp

9,500.00
30,000.00
30,000.00
28,000.00
23,000.00
Bbp

Gaji Operator & Mekanik 1/8 x (upah Operator + Mekanik)

Pelengkapan (perangkat/Pakaian Kerja)

Biaya perbaikan =

Gom
Pl

6% x Harga Alat
Jam kerja Alat/tahun

(Rp/Jam)

Biaya Operasi Alat (a + b + c + d)

Bp

Boa

Jumlah Biaya Alat/Jam (A + B)


Dibulatkan

ANALISA PERALATAN

I Data Peralatan
1 Nama Alat
2 Merk
3 Model/Type
4 Buatan Negara
5 Tahun Pembuatan
Efesiensi Alat
Efesiensi Operator
6 Kapasitas
7 Umur Ekonomis, Th
8 Jam keja per tahun, h (jam)
9 Harga pokok alat
10 Harga bahan alat
11 Nilai sisa
12 Harga penyusutan

Ea
Jk
A
B
C
D

10%xA
C-A

II Biaya Pemilikan
a Penyusutan
D=

Harga penyusutan
Umur alat x jam kerja

Biaya Bank,Pajak,Asuransi
0,60 x Hrg alat
Bm =
Umur alat x jam kerja

(Rp/Jam)

Bm

(Rp/Jam)

A Jumlah biaya Kepemilikan (a +b)

III Biaya Operasional Alat (per Jam)


a

Bahan Bakar & Pelumas


1.5 Lt Bahan Bakar Bensin
0.015 Lt Oil Mesin
0.02 Kg Gemuk
1 Bahan pelengkap
0.225 Operator
0.125 Mekanik

Rp
Rp
Rp
Rp
Rp
Rp

8,000.00
30,000.00
5,000.00
10,714.29
Bbp

Pelengkapan (perangkat/Pakaian Kerja)

Biaya perbaikan =

Pl

6% x Harga Alat
Jam kerja Alat/tahun

(Rp/Jam)

Biaya Operasi Alat (a + b + c)

Bp

Boa

Jumlah Biaya Alat/Jam (A + B)


Dibulatkan

ANALISA PERALATAN

I Data Peralatan
1 Nama Alat
2 Merk
3 Model/Type
4 Buatan Negara
5 Tahun Pembuatan
Efesiensi Alat
Efesiensi Operator
6 Kapasitas
7 Umur Ekonomis, Th
8 Jam keja per tahun, h (jam)
9 Harga pokok alat
10 Harga bahan alat
11 Nilai sisa
12 Harga penyusutan

Ea
Jk
A
B
C
D

10%xA
C-A

II Biaya Pemilikan
a Penyusutan
D=

Harga penyusutan
Umur alat x jam kerja

Biaya Bank,Pajak,Asuransi
0,60 x Hrg alat
Bm =
Umur alat x jam kerja

(Rp/Jam)

Bm

(Rp/Jam)

A Jumlah biaya Kepemilikan (a +b)

III Biaya Operasional Alat (per Jam)


a

Bahan Bakar & Pelumas


1.8 Lt Solar
0.01 Lt Oil Mesin
0.01 Lt Oil Hidroulik
0.01 Kg Gemuk
1 Bahan Pelengkap
0.125 Operator
0.063 Mekanik

Rp
Rp
Rp
Rp
Rp
Rp
Rp

9,500.00
30,000.00
5,000.00
75,000.00
55,000.00
Bbp

Pelengkapan (perangkat/Pakaian Kerja)

Biaya perbaikan =

Pl

6% x Harga Alat
Jam kerja Alat/tahun

(Rp/Jam)

Biaya Operasi Alat (a + b + c + )

Bp

Boa

Jumlah Biaya Alat/Jam (A + B)


Dibulatkan

ANALISA PERALATAN

I Data Peralatan
1 Nama Alat
2 Merk
3 Model/Type
4 Buatan Negara
5 Tahun Pembuatan
Efesiensi Alat
Efesiensi Operator
6 Kapasitas
7 Umur Ekonomis, Th
8 Jam keja per tahun, h (jam)
9 Harga pokok alat
10 Harga bahan alat
11 Nilai sisa
12 Harga penyusutan

VIBRATOR BETON

Ea
Jk
A
B
C
D

10%xA
C-A

II Biaya Pemilikan
a Penyusutan
D=

Harga penyusutan
Umur alat x jam kerja

Biaya Bank,Pajak,Asuransi
0,60 x Hrg alat
Bm =
Umur alat x jam kerja

(Rp/Jam)

Bm

(Rp/Jam)

A Jumlah biaya Kepemilikan (a +b)

III Biaya Operasional Alat (per Jam)


a

Bahan Bakar & Pelumas


1.8 Bahan Bakar Bensin
0.015 Lt Oil Mesin
0.01 Lt Oil Hidroulik
0.01 Kg Gemuk
1 Bahan Pelengkap
0.125 Operator
0.038 Mekanik

Rp
Rp
Rp
Rp
Rp
Rp
Rp

8,000.00
137,000.00
5,000.00
75,000.00
55,000.00
Bbp

Pelengkapan (perangkat/Pakaian Kerja)

Biaya perbaikan =

Pl

6% x Harga Alat
Jam kerja Alat/tahun

(Rp/Jam)

Biaya Operasi Alat (a + b + c )

Bp

Boa

Jumlah Biaya Alat/Jam (A + B)


Dibulatkan

ANALISA PERALATAN

I Data Peralatan
1 Nama Alat
2 Merk
3 Model/Type
4 Buatan Negara
5 Tahun Pembuatan
Efesiensi Alat
Efesiensi Operator
6 Kapasitas
7 Umur Ekonomis, Th
8 Jam keja per tahun, h (jam)
9 Harga pokok alat
10 Harga bahan alat
11 Nilai sisa
12 Harga penyusutan

Ea
Jk
A
B
C
D

10%xA
C-A

II Biaya Pemilikan
a Penyusutan
D=

Harga penyusutan
Umur alat x jam kerja

Biaya Bank,Pajak,Asuransi
0,60 x Hrg alat
Bm =
Umur alat x jam kerja

(Rp/Jam)

Bm

(Rp/Jam)

A Jumlah biaya Kepemilikan (a +b)

III Biaya Operasional Alat (per Jam)


a

Bahan Bakar & Pelumas


0.8 Bahan Bakar Bensin
0.083 Lt Oil Mesin
0.01 Kg Gemuk
1 Bahan Pelengkap
0.125 Operator
0.05 Mekanik

Rp
Rp
Rp
Rp
Rp
Rp

8,000.00
137,000.00
5,000.00
75,000.00
55,000.00
Bbp

Pelengkapan (perangkat/Pakaian Kerja)

Biaya perbaikan =

Pl

6% x Harga Alat
Jam kerja Alat/tahun

(Rp/Jam)

Biaya Operasi Alat (a + b + c )

Bp

Boa

Jumlah Biaya Alat/Jam (A + B)


Dibulatkan

ANALISA PERALATAN

I Data Peralatan
1 Merk
2 Model/Type
3 Tahun Pembuatan
Efesiensi Alat
Efesiensi Operator
4 Tenaga : N (Hp)
5 Kapasitas : q (M3)
6 Umur Ekonomis, Th
7 Jam keja per tahun, h (jam)
8 Produksi alat per tahun (M3/th)
9 Produksi efektif (M3/th)
10 Harga pokok alat
11 Harga bahan alat
12 Nilai sisa
13 Harga penyusutan

Hp
q
UE
h
PE
Hp

Hps

II Biaya Pemilikan
a Penyusutan
D=

Harga penyusutan
Umur alat x jam kerja

Biaya Bank,Pajak,Asuransi
0,60 x Hrg alat
Bm =
Umur alat x jam kerja

(Rp/Jam)

Bm

(Rp/Jam)

A Jumlah biaya Kepemilikan (a +b)

III Biaya Operasional Alat (per Jam)


a

Bahan Bakar & Pelumas


13.5 Lt Solar
0.13 Lt Oil Mesin
0.07 Lt Oil Hidroulik
0.155 Lt Tranmisi
0.02 Kg Gemuk

Rp
Rp
Rp
Rp
Rp

9,500.00
30,000.00
30,000.00
28,000.00
23,000.00
Bbp

Gaji Operator & Mekanik 1/8 x (upah Operator + Mekanik)

Pelengkapan (perangkat/Pakaian Kerja)

Biaya perbaikan =

Gom
Pl

12% x Harga Alat


Jam kerja Alat/tahun

(Rp/Jam)

Biaya Operasi Alat (a + b + c + d)

Bp

Boa

Jumlah Biaya Alat/Jam (A + B)


Dibulatkan

ANALISA PERALATAN

I Data Peralatan
1 Merk
2 Model/Type
3 Tahun Pembuatan
Efesiensi Alat
Efesiensi Operator
4 Tenaga : N (Hp)
5 Kapasitas : q (M3)
6 Umur Ekonomis, Th
7 Jam keja per tahun, h (jam)
8 Produksi alat per tahun (M3/th)
9 Produksi efektif (M3/th)
10 Harga pokok alat
11 Harga bahan alat
12 Nilai sisa
13 Harga penyusutan

Hp
q
UE
h
PE
Hp

Hps

II Biaya Pemilikan
a Penyusutan
D=

Harga penyusutan
Umur alat x jam kerja

Biaya Bank,Pajak,Asuransi
0,60 x Hrg alat
Bm =
Umur alat x jam kerja

(Rp/Jam)

Bm

(Rp/Jam)

A Jumlah biaya Kepemilikan (a +b)

III Biaya Operasional Alat (per Jam)


a

Bahan Bakar & Pelumas


0.12 Lt Solar
0.8 Lt Oil Mesin
0.08 Lt Oil Hidroulik
0.04 Lt Tranmisi
0.04 Kg Gemuk

Rp
Rp
Rp
Rp
Rp

9,500.00
30,000.00
30,000.00
30,000.00
30,000.00
Bbp

Gaji Operator & Mekanik 1/8 x (upah Operator + Mekanik)

Pelengkapan (perangkat/Pakaian Kerja)

Biaya perbaikan =
Biaya Operasi Alat (a + b + c + d)

Jumlah Biaya Alat/Jam (A + B)


Dibulatkan

10% x Harga Alat


Jam kerja Alat/tahun

Gom
Pl

(Rp/Jam)

Bp

Boa

EXCAVATOR
CAT.B32
Pc 200
1994
80%
80%
128.0
0.7
5.0
2,000.0
52,500.0
46.0
750,000,000.00
300,000.0
75,000,000.0
675,000,000.0

67,500.00

45,000.00

112,500.00

142,500.00
8,400.00
25,500.00
252.00
1,610.00
178,262.00
16,250.00
500.00

9,375.00

204,387.00

316,887.00
316,000.00

BULDOZER
KOMATSHU
Cat D -60E
1994
81%
81%
165
1.2
5.0
2,000.0
126,000.0
65.0
350,000,000.00
300,000.0
70,000,000.0
280,000,000.0

28,000.00

21,000.00

49,000.00

199,500.00
3,900.00
900.00
1,400.00
4,600.00
210,300.00
16,250.00
500.00

19,250.00

246,300.00

295,300.00
295,000.00

VIBRO ROLLER
SAKAI
SV-95D
1994
81%
81%
110
55
5.0
2,000.0
54.0
225,000,000.00
45,000,000.0
180,000,000.0

18,000.00

13,500.00

31,500.00

237,500.00
8,700.00
2,400.00
1,120.00
920.00
250,640.00
16,250.00
500.00

11,250.00

278,640.00

310,140.00
310,000.00

DUMP TRUK
135 PS
Izusu
1995
81%
81%
125.0
5.7
5.0
2,000.0
22.0
155,000,000.00
1,000,000.0
31,000,000.0
124,000,000.0

12,400.00

9,300.00

21,700.00

128,250.00
3,900.00
2,100.00
4,340.00
460.00
139,050.00
12,000.00
500.00

9,300.00

160,850.00

182,550.00
182,000.00

WATER TANK
120 PS
TLD-50
1995
81%
81%
125.0
5.0
2,000.0
4,000.0
135,000,000.00
1,000,000.0
27,000,000.0
108,000,000.0

10,800.00

8,100.00

18,900.00

128,250.00
3,900.00
2,100.00
4,340.00
230.00
138,820.00
12,500.00
500.00

4,050.00

155,870.00

174,770.00
174,000.00

STEMPER
Robyn
MTR 80
Jepang
2005
81%
81%
6,5 HP
5.0
2,000.0
17,500,000.00
1,750,000.0
15,750,000.0

1,575.00

76.50

1,651.50

12,000.00
450.00
5,000.00
2,410.71
19,860.71

500.00

525.00

20,885.71

22,537.21
22,000.00

BETON MOLEN
GOLD STAR
MTR 80
Jepang
2003
81 %
81 %
0,3 m3
5.0
2,000.0
17,750,000.00
1,775,000.0
15,975,000.0

1,597.50

76.50

1,674.00

17,100.00
300.00
5,000.00
9,375.00
3,465.00
35,240.00

500.00

532.50

36,272.50

37,946.50
37,000.00

VIBRATOR BETON
GOLDEN STAR
SM 450
Jepang
2003
81 %
81 %
6,5 HP
5.0
2,000.0
12,750,000.00
1,275,000.0
11,475,000.0

1,147.50

76.50

1,224.00

14,400.00
2,055.00
5,000.00
9,375.00
2,090.00
32,920.00

500.00

382.50

33,802.50

35,026.50
35,000.00

WATER PUMP
HONDA
M 14
Jepang
2003
81 %
81 %
6,5 HP
5.0
2,000.0
5,000,000.00
1,275,000.0
3,725,000.0

372.50

76.50

449.00

6,400.00
11,371.00
5,000.00
9,375.00
2,750.00
34,896.00

500.00

150.00

35,546.00

35,995.00
35,000.00

DUMP TRUK 10 M3
HD-40
Hino
2005
81%
81%
190 PS
5.7
5.0
2,000.0
22.0
275,000,000.00
1,000,000.0
55,000,000.0
220,000,000.0

22,000.00

16,500.00

38,500.00

128,250.00
3,900.00
2,100.00
4,340.00
460.00
139,050.00
12,500.00
500.00

16,500.00

168,550.00

207,050.00
207,000.00

BABY ROLLER 3 TON


SAKAI
SV-95D
1994
81%
81%
95
55
5.0
2,000.0
54.0
85,000,000.00
17,000,000.0
68,000,000.0

6,800.00

5,100.00

11,900.00

1,140.00
24,000.00
2,400.00
1,200.00
1,200.00
29,940.00
16,250.00
500.00

4,250.00

50,940.00

62,840.00
62,000.00

DAFTAR HARGA DAN JARAK RATA -RATA


DARI SUMBER BAHAN ( QUARRY )
Pekerjaan
Satuan Kerja
Kegiatan
Lokasi
Tahun Anggaran

No.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

:
:
:
:
:

Pembangunan Gedung kantor BRI Tanjung Karang


Err:509
Kantor Wilayah BRI Tanjung karang
2015
2012

Uraian Pekerjaan

Baja Profil
Balok Kayu Klas II
Balok Kayu Klas III
Balok Kayu Klas IV
Batu Belah Hitam
Batu Split
Bensin
Besi Baja IWF
Besi Baja Siku
Besi Beton Polos
Besi Beton Ulir
Geotextil Non Woven
Kawat Beton
Kawat Beronjong
Kawat Las
Kayu Begisting
Minyak Pelumas
Minyak Bakar
Multiplek
Paku
Papan Kayu Klas II

Satuan

KG
M3
M3
M3
M3
M3
LTR
KG
KG
KG
KG
M2
KG
UNIT
KG
M3
LTR
LTR
LBR
KG
M3

Harga Satuan
Dasar
Rp

Lokasi Sumber
Matrial / Bahan

Lokasi Tujuan

Jarak Lokasi
Ketujuan
Km

Kecapatan
Isi
Km / Jam

Kecepatan
Kosong
Km / Jam

Waktu
Putar
Jam

22
23
24
25
26
27
28
29
30
31
32

Papan Kayu Klas III


Papan Kayu Klas IV
Pasir Cor
Pasir Pasang
Pasir Urug
Penyediaan Air Kerja
Pipa Besi
Semen ( PC ) 50 Kg
Solar
Tanah Timbunan
Kayu Gelam

M3
M3
M3
M3
M3
LS
M
ZAK
LTR
M3
BTG

Biaya Angkut +
Bongkar
Rp.

Harga Bahan
Di Lokasi
Rp.

ANALISA HARGA LUM SUM UNTUK MOBILISASI


Pekerjaan
Lokasi
Tahun Anggaran
Err:509
Tahun Anggaran

: Pembangunan Gedung kantor BRI Tanjung Karang


: Kantor Wilayah BRI Tanjung karang
: 2015
ErErr:509
: 2012

NO.

URAIAN

SATUAN

PERKIRAAN
KUANTITAS

A.

SEWA LAHAN UNTUK BASE CAMP

m2

B.

PERALATAN
Sesuai lampiran 4b

Ls

1.00

C.
1
2
3
4
5

FASILITAS KONTRAKTOR
Base Camp ( Sewa )
Kantor Lapangan
Barak Kerja
Bengkel
Gudang, dan lain-lain/Sewa

Ls
Ls
Ls
Ls
Ls

1.00
1.00
1.00
1.00
1.00

D.
1
2
3
4

FASILITAS DIREKSI
Sewa Kantor
Perabot dan Layanan
Sewa Kendaraan Roda Empat
Sewa Kendaraan Roda Dua

Ls
Ls
Unit
Unit

1.00

E.
1
2
3
4

MATA PEKERJAAN MOBILISASI LAINNYA


Papan Nama Proyek
Pengukuran
Dokumentasi Foto
Tes Laboratorium/Pengendalian Mutu

Buah
Ls
Ls
Ls

1.00
1.00
1.00
1.00

F.
G.
H.
I.

DEMOBILISASI
JUMLAH ( A+B+C+D+E )
BIAYA UMUM DAN KEUNTUNGAN ( 10% X F )
TOTAL HARGA LUMP SUM UNTUK MOBILISASI

Ls

1.00

BILISASI

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)
-

41,584,000.00

41,584,000.00

1,500,000.00
1,000,000.00
650,000.00
-

1,500,000.00
1,000,000.00
650,000.00
-

1,500,000.00

1,500,000.00

650,000.00
1,500,000.00
1,750,000.00
4,000,000.00

650,000.00
1,500,000.00
1,750,000.00
4,000,000.00

7,500,000.00

7,500,000.00
61,634,000.00
6,163,400.00
67,797,400.00

Lampung Selatan 28 Juni 2012


PT.DIRGANTARA ALAM

NENENG NURCHAYATI.S.Sos
Direktur Utama

ANALISA HARGA LUM SUM UNTUK MOBILISASI


Pekerjaan
Lokasi
Tahun Anggaran
Err:509
Tahun Anggaran

NO.

B.

:
:
:
:
:

Pembangunan Gedung kantor BRI Tanjung Karang


Kantor Wilayah BRI Tanjung karang
2015
Err:509
2012

URAIAN

SATUAN

KUANTITAS

HARGA
SATUAN
(Rp.)

PERALATAN

1 Buldozer 250 HP
2 Excavator Long Arm 0,05 M3
3 Excavator 0,75 M3
4 Vibrator Roller 8 - 10 Ton
5 Babby Roller 3 Ton
6 Dump Truk 8 - 10 M3
7 Dump Truk 3 - 5 M3
8 Stamper 6,5 HP
9 Concrete Mixer 0,3 M3
10 Generator
11 Pompa Air 4"
12 Concrete Vibrator
13 Mesin Las
14 Bar Bander
15 Tang Pemotong Kawat
16 Palu Pemecah Batu
17 Keranjang
18 Palu
19 Gergaji
20 Ember
21 Kotak Aduk
22 Theodolite T2
23 Waterpass, 2mm
Jumlah
Keuntungan dan lain -lain 13%
Total

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

5.00

4,500,000.00

1.00

4,500,000.00

4.00
4.00

400,000.00
400,000.00

4.00
4.00
1.00

400,000.00
400,000.00
400,000.00

1.00
1.00

1,500,000.00
1,500,000.00

Lampung Selatan 28 Juni 2012


PT.DIRGANTARA ALAM

NENENG NURCHAYATRI
Direktur Utama

JUMLAH
HARGA
(Rp.)

22,500,000.00
4,500,000.00
1,600,000.00
1,600,000.00
1,600,000.00
1,600,000.00
400,000.00
1,500,000.00
1,500,000.00
36,800,000.00
4,784,000.00
41,584,000.00

ampung Selatan 28 Juni 2012


PT.DIRGANTARA ALAM

NENENG NURCHAYATRI
Direktur Utama

ANALISA HARGA SATUAN DASAR BAHAN/ASAL


Pekerjaan
Lokasi
Tahun Anggaran
Tahun Anggaran
Jenis Material

:
:
:
:
:

Pembangunan Gedung kantor BRI Tanjung Karang


Kantor Wilayah BRI Tanjung karang
2015
2013
Pasir Cor ( Lokasi Pekerjaan)

URAIAN

No.

HARGA
Harga satuan bahan di quarry diatas Dump Truck
( Gunung Sugih )
Jarak Angkut
Jarak lokasi material ke Base Camp

S5-7

1.00

m3

(a)

7.00

Km

Kecepatan
Kecepatan Isi

(b)

40.00

Km/Jam

Kecepatan Kosong

(c)

50.00

Km/Jam

10.50
8.40
60.00
78.90
1.3150

menit
menit
menit
menit
Jam

Waktu Putar
- Berangkat isi
- Berangkat Kosong
- Muat / bongkar dll
Waktu yang diperlukan

=
=

( a / b ) x 60 mnt
( a / c ) x 60 mnt
(d)

Produksi Alat Dump Truck


Kapasitas bak

(e)

4.00

m3

Faktor efisiensi alat

(f)

0.83

(g)

2.525

m3/Jam

(h)
(i)
(j)

182,000.00
72,087.35
-

Rp./Jam
Rupiah
Rupiah

Kap. Prod. / jam

KODE

Biaya Angkut
Biaya alat / Jam (Dump Truck)
Biaya Angkut / satuan ( h / g)
Biaya Bongkar
Total Harga
Harga Satuan Dasar Bahan dilokasi
Dibulatkan

e x f x 60 mnt
d

ANALISA HARGA SATUAN DASAR


Pekerjaan
Lokasi
Tahun Anggaran
Tahun Anggaran
Jenis Material

:
:
:
:
:

Pembangunan Gedung kantor BRI Tanjung Karang


Kantor Wilayah BRI Tanjung karang
2015
2013
Pasir Pasang ( Lokasi Pekerjaan )

URAIAN

No.

HARGA
Harga satuan bahan di quarry diatas Dump Truck

S5-7

1.00

m3

Jarak Angkut
Jarak lokasi material ke Base Camp

(a)

7.00

Km

Kecepatan
Kecepatan Isi

(b)

40.00

Km/Jam

Kecepatan Kosong

(c)

50.00

Km/Jam

10.50
8.40
60.00
78.90
1.3150

menit
menit
menit
menit
Jam

Waktu Putar
- Berangkat isi
- Berangkat Kosong
- Muat / bongkar dll
Waktu yang diperlukan

=
=

( a / b ) x 60 mnt
( a / c ) x 60 mnt
(d)

Produksi Alat Dump Truck


Kapasitas bak

(e)

10.00

m3

Faktor efisiensi alat

(f)

0.83

(g)

6.312

m3/Jam

(h)
(i)
(j)

182,000.00
28,834.94
-

Rp./Jam
Rupiah
Rupiah

Kap. Prod. / jam

KODE

Biaya Angkut
Biaya alat / Jam (Dump Truck)
Biaya Angkut / satuan ( h / g)
Biaya Bongkar
Total Harga
Harga Satuan Dasar Bahan dilokasi
Dibulatkan

e x f x 60 mnt
d

ANALISA HARGA SATUAN DASAR


Pekerjaan
Lokasi
Tahun Anggaran
Tahun Anggaran
Jenis Material

:
:
:
:
:

Pembangunan Gedung kantor BRI Tanjung Karang


Kantor Wilayah BRI Tanjung karang
2015
2013
Pasir Urug ( Mesuji )

URAIAN

No.

HARGA
Harga satuan bahan di quarry diatas Dump Truck

S5-7

1.00

m3

Jarak Angkut
Jarak lokasi material ke Base Camp

(a)

7.00

Km

Kecepatan
Kecepatan Isi

(b)

40.00

Km/Jam

Kecepatan Kosong

(c)

50.00

Km/Jam

10.50
8.40
60.00
78.90
1.3150

menit
menit
menit
menit
Jam

Waktu Putar
- Berangkat isi
- Berangkat Kosong
- Muat / bongkar dll
Waktu yang diperlukan

=
=

( a / b ) x 60 mnt
( a / c ) x 60 mnt
(d)

Produksi Alat Dump Truck


Kapasitas bak

(e)

10.00

m3

Faktor efisiensi alat

(f)

0.83

(g)

6.312

m3/Jam

(h)
(i)
(j)

182,000.00
28,834.94
-

Rp./Jam
Rupiah
Rupiah

Kap. Prod. / jam

KODE

Biaya Angkut
Biaya alat / Jam (Dump Truck)
Biaya Angkut / satuan ( h / g)
Biaya Bongkar
Total Harga
Harga Satuan Dasar Bahan dilokasi
Dibulatkan

e x f x 60 mnt
d

ANALISA HARGA SATUAN DASAR


Pekerjaan
Lokasi
Tahun Anggaran
Tahun Anggaran
Jenis Material

:
:
:
:
:

Pembangunan Gedung kantor BRI Tanjung Karang


Kantor Wilayah BRI Tanjung karang
2015
2013
Batu Split 1 -2 ( Bandar Lampung )

URAIAN

No.

HARGA
Harga satuan bahan di quarry diatas Dump Truck

S5-7

1.00

m3

Jarak Angkut
Jarak lokasi material ke Base Camp

(a)

200.00

Km

Kecepatan
Kecepatan Isi

(b)

70.00

Km/Jam

Kecepatan Kosong

(c)

80.00

Km/Jam

171.43
150.00
60.00
381.43
6.3571

menit
menit
menit
menit
Jam

Waktu Putar
- Berangkat isi
- Berangkat Kosong
- Muat / bongkar dll
Waktu yang diperlukan

=
=

( a / b ) x 60 mnt
( a / c ) x 60 mnt
(d)

Produksi Alat Dump Truck


Kapasitas bak

(e)

8.00

m3

Faktor efisiensi alat

(f)

0.83

(g)

1.044

m3/Jam

(h)
(i)
(j)

182,000.00
174,246.99
-

Rp./Jam
Rupiah
Rupiah

Kap. Prod. / jam

KODE

Biaya Angkut
Biaya alat / Jam (Dump Truck)
Biaya Angkut / satuan ( h / g)
Biaya Bongkar
Total Harga
Harga Satuan Dasar Bahan dilokasi
Dibulatkan

e x f x 60 mnt
d

ANALISA HARGA SATUAN DASAR


Pekerjaan
Lokasi
Tahun Anggaran
Tahun Anggaran
Jenis Material

:
:
:
:
:

Pembangunan Gedung kantor BRI Tanjung Karang


Kantor Wilayah BRI Tanjung karang
2015
2013
Batu Split 2 - 3 ( Bandar Lampung )

URAIAN

No.

HARGA
Harga satuan bahan di quarry diatas Dump Truck

S5-7

1.00

m3

Jarak Angkut
Jarak lokasi material ke Base Camp

(a)

200.00

Km

Kecepatan
Kecepatan Isi

(b)

70.00

Km/Jam

Kecepatan Kosong

(c)

80.00

Km/Jam

171.43
150.00
60.00
381.43
6.3571

menit
menit
menit
menit
Jam

Waktu Putar
- Berangkat isi
- Berangkat Kosong
- Muat / bongkar dll
Waktu yang diperlukan

=
=

( a / b ) x 60 mnt
( a / c ) x 60 mnt
(d)

Produksi Alat Dump Truck


Kapasitas bak

(e)

8.00

m3

Faktor efisiensi alat

(f)

0.83

(g)

1.044

m3/Jam

(h)
(i)
(j)

182,000.00
174,246.99
-

Rp./Jam
Rupiah
Rupiah

Kap. Prod. / jam

KODE

Biaya Angkut
Biaya alat / Jam (Dump Truck)
Biaya Angkut / satuan ( h / g)
Biaya Bongkar
Total Harga

e x f x 60 mnt
d

Harga Satuan Dasar Bahan dilokasi


Dibulatkan

ANALISA HARGA SATUAN DASAR


Pekerjaan
Lokasi
Tahun Anggaran
Tahun Anggaran
Jenis Material

:
:
:
:
:

Pembangunan Gedung kantor BRI Tanjung Karang


Kantor Wilayah BRI Tanjung karang
2015
2013
Semen (Mesuji )

URAIAN

No.

HARGA
Harga satuan bahan di quarry diatas Dump Truck

S5-7

1.00

Sak

Jarak Angkut
Jarak lokasi material ke Base Camp

(a)

7.00

Km

Kecepatan
Kecepatan Isi

(b)

50.00

Km/Jam

Kecepatan Kosong

(c)

75.00

Km/Jam

8.40
5.60
60.00
74.00
1.2333

menit
menit
menit
menit
Jam

Zak

Waktu Putar
- Berangkat isi
- Berangkat Kosong
- Muat / bongkar dll
Waktu yang diperlukan

=
=

( a / b ) x 60 mnt
( a / c ) x 60 mnt
(d)

Produksi Alat Dump Truck


Kapasitas bak

(e)

100.00

Faktor efisiensi alat

(f)

0.83

(g)

67.297

m3/Jam

(h)

182,000.00

Rp./Jam

Kap. Prod. / jam

KODE

Biaya Angkut
Biaya alat / Jam (Dump Truck)

e x f x 60 mnt
d

Biaya Angkut / satuan ( h / g)


Biaya Bongkar
G

(i)
(j)

2,704.42
-

Rupiah
Rupiah

Total Harga
Harga Satuan Dasar Bahan dilokasi
Dibulatkan

ANALISA HARGA SATUAN DASAR


Pekerjaan
Lokasi
Tahun Anggaran
Tahun Anggaran
Jenis Material

:
:
:
:
:

Pembangunan Gedung kantor BRI Tanjung Karang


Kantor Wilayah BRI Tanjung karang
2015
2013
Besi Beton ( Tulang Bawang)

URAIAN

No.

KODE

HARGA
Harga satuan bahan di quarry diatas Dump Truck

S5-7

1.00

Kg

Jarak Angkut
Jarak lokasi material ke Base Camp

(a)

7.00

Km

Kecepatan
Kecepatan Isi

(b)

50.00

Km/Jam

Kecepatan Kosong

(c)

70.00

Km/Jam

8.40
6.00
60.00
74.40
1.2400

menit
menit
menit
menit
Jam

Waktu Putar
- Berangkat isi
- Berangkat Kosong
- Muat / bongkar dll
Waktu yang diperlukan

=
=

( a / b ) x 60 mnt
( a / c ) x 60 mnt
(d)

Produksi Alat Dump Truck


Kapasitas bak

(e)

8,000.00

Faktor efisiensi alat

(f)

0.83

(g)

5,354.839

Kap. Prod. / jam

e x f x 60 mnt

Kg
m3/Jam

d
F

Biaya Angkut
Biaya alat / Jam (Dump Truck)
Biaya Angkut / satuan ( h / g)
Biaya Bongkar

(h)
(i)
(j)

182,000.00
33.99
1,000.00

Rp./Jam
Rupiah
Rupiah

Total Harga
Harga Satuan Dasar Bahan dilokasi
Dibulatkan

ANALISA HARGA SATUAN DASAR


Pekerjaan
Lokasi
Tahun Anggaran
Tahun Anggaran
Jenis Material

:
:
:
:
:

Pembangunan Gedung kantor BRI Tanjung Karang


Kantor Wilayah BRI Tanjung karang
2015
2013
Kayu Begisting ( Mesuji )

URAIAN

No.

KODE

HARGA
Harga satuan bahan di quarry diatas Dump Truck

S5-7

1.00

M3

Jarak Angkut
Jarak lokasi material ke Base Camp

(a)

7.00

Km

Kecepatan
Kecepatan Isi

(b)

50.00

Km/Jam

Kecepatan Kosong

(c)

70.00

Km/Jam

8.40
6.00
60.00
74.40
1.2400

menit
menit
menit
menit
Jam

Waktu Putar
- Berangkat isi
- Berangkat Kosong
- Muat / bongkar dll
Waktu yang diperlukan

Produksi Alat Dump Truck


Kapasitas bak

=
=

( a / b ) x 60 mnt
( a / c ) x 60 mnt
(d)

(e)

4.00

M3

Faktor efisiensi alat


Kap. Prod. / jam

e x f x 60 mnt
d

Biaya Angkut
Biaya alat / Jam (Dump Truck)
Biaya Angkut / satuan ( h / g)
Biaya Bongkar

(f)

0.83

(g)

2.677

m3/Jam

(h)
(i)
(j)

182,000.00
67,975.90
1,100.00

Rp./Jam
Rupiah
Rupiah

Total Harga
Harga Satuan Dasar Bahan dilokasi
Dibulatkan

ANALISA HARGA SATUAN DASAR


Pekerjaan
Lokasi
Tahun Anggaran
Tahun Anggaran
Jenis Material

:
:
:
:
:

Pembangunan Gedung kantor BRI Tanjung Karang


Kantor Wilayah BRI Tanjung karang
2015
2013
Batu Belah (Kotabumi )

URAIAN

No.

KODE

HARGA
Harga satuan bahan di quarry diatas Dump Truck

S5-7

1.00

m3

Jarak Angkut
Jarak lokasi material ke Base Camp

(a)

80.00

Km

Kecepatan
Kecepatan Isi

(b)

50.00

Km/Jam

Kecepatan Kosong

(c)

70.00

Km/Jam

(d)

96.00
68.57
60.00
224.57

menit
menit
menit
menit

Waktu Putar
- Berangkat isi
- Berangkat Kosong
- Muat / bongkar dll
Waktu yang diperlukan

=
=

( a / b ) x 60 mnt
( a / c ) x 60 mnt

Jam

Produksi Alat Dump Truck


Kapasitas bak

(e)

8.00

M3

Faktor efisiensi alat

(f)

0.90

(g)

1.924

m3/Jam

(h)
(i)
(j)

182,000.00
94,611.11
-

Rp./Jam
Rupiah
Rupiah

Kap. Prod. / jam

3.7429

e x f x 60 mnt
d

Biaya Angkut
Biaya alat / Jam (Dump Truck)
Biaya Angkut / satuan ( h / g)
Biaya Bongkar
Total Harga
Harga Satuan Dasar Bahan dilokasi
Dibulatkan

ANALISA HARGA SATUAN DASAR


Pekerjaan
Lokasi
Tahun Anggaran
Tahun Anggaran
Jenis Material

:
:
:
:
:

Pembangunan Gedung kantor BRI Tanjung Karang


Kantor Wilayah BRI Tanjung karang
2015
2013
Multiplek (Mesuji)

URAIAN

No.

KODE

HARGA
Harga satuan bahan di quarry diatas Dump Truck

S5-7

1.00

Lbr

Jarak Angkut
Jarak lokasi material ke Base Camp

(a)

5.00

Km

Kecepatan
Kecepatan Isi

(b)

40.00

Km/Jam

Kecepatan Kosong

(c)

50.00

Km/Jam

7.50

menit

Waktu Putar
- Berangkat isi

( a / b ) x 60 mnt

- Berangkat Kosong
- Muat / bongkar dll
Waktu yang diperlukan

( a / c ) x 60 mnt
(d)

6.00
60.00
73.50
1.2250

menit
menit
menit
Jam

Produksi Alat Dump Truck


Kapasitas bak

(e)

4.00

M3

Faktor efisiensi alat

(f)

0.83

(g)

2.710

m3/Jam

(h)
(i)
(j)

182,000.00
67,153.61
-

Rp./Jam
Rupiah
Rupiah

Kap. Prod. / jam

e x f x 60 mnt
d

Biaya Angkut
Biaya alat / Jam (Dump Truck)
Biaya Angkut / satuan ( h / g)
Biaya Bongkar
Total Harga
Harga Satuan Dasar Bahan dilokasi
Dibulatkan

Natar,17 Desemb

ANALISA HARGA SATUAN DASAR


Pekerjaan
Lokasi
Tahun Anggaran
Tahun Anggaran
Jenis Material

:
:
:
:
:

Pembangunan Gedung kantor BRI Tanjung Karang


Kantor Wilayah BRI Tanjung karang
2015
2013
Kayu Gelam ( Menggala )

URAIAN

No.

KODE

HARGA
Harga satuan bahan di quarry diatas Dump Truck

S5-7

1.00

Btg

Jarak Angkut
Jarak lokasi material ke Base Camp

(a)

20.00

Km

Kecepatan
Kecepatan Isi

(b)

50.00

Km/Jam

Kecepatan Kosong
D

Waktu Putar
- Berangkat isi
- Berangkat Kosong
- Muat / bongkar dll
Waktu yang diperlukan

=
=

( a / b ) x 60 mnt
( a / c ) x 60 mnt
(d)

55.00

Km/Jam

24.00
21.82
60.00
105.82
1.7636

menit
menit
menit
menit
Jam

Btg

Produksi Alat Dump Truck


Kapasitas bak

(e)

100.00

Faktor efisiensi alat

(f)

0.83

(g)

47.062

m3/Jam

(h)
(i)
(j)

182,000.00
3,867.25
1,000.00

Rp./Jam
Rupiah
Rupiah

Kap. Prod. / jam

(c)

e x f x 60 mnt
d

Biaya Angkut
Biaya alat / Jam (Dump Truck)
Biaya Angkut / satuan ( h / g)
Biaya Bongkar

Total Harga
Harga Satuan Dasar Bahan dilokasi
Dibulatkan

ANALISA HARGA SATUAN DASAR


Pekerjaan
Lokasi
Tahun Anggaran
Tahun Anggaran
Jenis Material

:
:
:
:
:

Pembangunan Gedung kantor BRI Tanjung Karang


Kantor Wilayah BRI Tanjung karang
2015
2013
Paku ( Mesuji)

URAIAN

No.

HARGA
Harga satuan bahan di quarry diatas Dump Truck
Jarak Angkut

KODE

S5-7

1.00

Kg

Jarak lokasi material ke Base Camp

(a)

5.00

Km

Kecepatan
Kecepatan Isi

(b)

60.00

Km/Jam

Kecepatan Kosong

(c)

75.00

Km/Jam

5.00
4.00
60.00
69.00
1.1500

menit
menit
menit
menit
Jam

Btg

Waktu Putar
- Berangkat isi
- Berangkat Kosong
- Muat / bongkar dll
Waktu yang diperlukan

( a / b ) x 60 mnt
( a / c ) x 60 mnt
(d)

Produksi Alat Dump Truck


Kapasitas bak

(e)

100.00

Faktor efisiensi alat

(f)

0.83

(g)

72.174

m3/Jam

(h)
(i)
(j)

182,000.00
2,521.69
-

Rp./Jam
Rupiah
Rupiah

Kap. Prod. / jam

=
=

Biaya Angkut
Biaya alat / Jam (Dump Truck)
Biaya Angkut / satuan ( h / g)
Biaya Bongkar

e x f x 60 mnt
d

Total Harga
Harga Satuan Dasar Bahan dilokasi
Dibulatkan

ANALISA HARGA SATUAN DASAR


Pekerjaan
Lokasi
Tahun Anggaran
Tahun Anggaran
Jenis Material

No.

:
:
:
:
:

Pembangunan Gedung kantor BRI Tanjung Karang


Kantor Wilayah BRI Tanjung karang
2015
2013
Kawat Beton ( Mesuji )

URAIAN

KODE

No.

HARGA
Harga satuan bahan di quarry diatas Dump Truck

S5-7

1.00

Kg

Jarak Angkut
Jarak lokasi material ke Base Camp

(a)

15.00

Km

Kecepatan
Kecepatan Isi

(b)

60.00

Km/Jam

Kecepatan Kosong

(c)

80.00

Km/Jam

15.00
11.25
60.00
86.25
1.4375

menit
menit
menit
menit
Jam

Kg

Waktu Putar
- Berangkat isi
- Berangkat Kosong
- Muat / bongkar dll
Waktu yang diperlukan

( a / b ) x 60 mnt
( a / c ) x 60 mnt
(d)

Produksi Alat Dump Truck


Kapasitas bak

(e)

100.00

Faktor efisiensi alat

(f)

0.83

(g)

57.739

m3/Jam

(h)
(i)
(j)

182,000.00
3,152.11
-

Rp./Jam
Rupiah
Rupiah

Kap. Prod. / jam

=
=

Biaya Angkut
Biaya alat / Jam (Dump Truck)
Biaya Angkut / satuan ( h / g)
Biaya Bongkar
Total Harga
Harga Satuan Dasar Bahan dilokasi
Dibulatkan

e x f x 60 mnt
d

N/ASAL

Harga /
Satuan
(Rp.)

Total
Harga
(Rp.)

125,000.00

125,000.00

72,087.35
-

72,087.35
-

197,087.35
197,087.00

Lampung Selatan,28 Juni 2012


PT.DIRGANTARA ALAM

ok

NENENG NURCHAYATI.S.sos
Direktur Utama

Harga /
Satuan
(Rp.)

Total
Harga
(Rp.)

120,000.00

120,000.00

28,834.94
-

28,834.94
-

148,834.94
148,834.00

Lampung Selatan,28 Juni 2012


PT.DIRGANTARA ALAM

ok

NENENG NURCHAYATI .S.sos


Direktur Utama

Harga /
Satuan
(Rp.)

Total
Harga
(Rp.)

75,000.00

75,000.00

28,834.94
-

28,834.94
-

103,834.94
103,834.00

Lampung Selatan,28 Juni 2012


PT.DIRGANTARA ALAM

ok

NENENG NURCHAYATI .S.sos


Direktur Utama

Harga /
Satuan
(Rp.)

Total
Harga
(Rp.)

165,000.00

165,000.00

174,246.99
-

174,246.99
-

339,246.99
339,246.00

ok

Lampung Selatan,28 Juni 2012


PT.DIRGANTARA ALAM

NENENG NURCHAYATI .S.sos


Direktur Utama

Harga /
Satuan
(Rp.)

Total
Harga
(Rp.)

145,000.00

145,000.00

174,246.99
-

174,246.99
-

ok

319,246.99
319,246.00

Lampung Selatan 28 Juni 2012


PT.DIRGANTARA ALAM

NENENG NURCHAYATI.S.sos
Direktur Utama

Harga /
Satuan
(Rp.)

66,500.00

Total
Harga
(Rp.)

66,500.00

ok

2,704.42
-

2,704.42
-

69,204.42
69,204.00

Lampung Selatan,28 Juni 2012


PT.DIRGANTARA ALAM

NENENG NURCHAYATI .S.sos


Direktur Utama

Harga /
Satuan
(Rp.)

12,000.00

Total
Harga
(Rp.)

12,000.00

ok

33.99
1,000.00

33.99
1,000.00

13,033.99
13,033.00

Lampung Selatan,28 Juni 2012


PT.DIRGANTARA ALAM

NENENG NURCHAYATI .S.sos


Direktur Utama

Harga /
Satuan
(Rp.)

1,750,000.00

Total
Harga
(Rp.)

1,750,000.00

ok

67,975.90
1,100.00

67,975.90
1,100.00

1,819,075.90
1,819,075.00

Lampung Selatan,28 Juni 2012


PT.DIRGANTARA ALAM

NENENG NURCHAYATI .S.sos


Direktur Utama

Harga /
Satuan
(Rp.)

100,000.00

Total
Harga
(Rp.)

100,000.00

ok

94,611.11
-

94,611.11
-

194,611.11
194,611.00

Lampung Selatan,28 Juni 2012


PT.DIRGANTARA ALAM

NENENG NURCHAYATI .S.sos


Direktur Utama

Harga /
Satuan
(Rp.)

65,000.00

Total
Harga
(Rp.)

65,000.00

67,153.61
-

67,153.61
-

132,153.61
132,153.00

Natar,17 Desember 2012


PT.DIRGANTARA ALAM

NENENG NURCHAYATI .S.sos


Direktur Utama

Harga /
Satuan
(Rp.)

12,000.00

Total
Harga
(Rp.)

12,000.00

ok

3,867.25
1,000.00

3,867.25
1,000.00

16,867.25
16,867.00

Lampung Selatan,28 Juni 2012


PT.DIRGANTARA ALAM

NENENG NURCHAYATI .S.sos


Direktur Utama

Harga /
Satuan
(Rp.)

13,500.00

Total
Harga
(Rp.)

13,500.00

ok

2,521.69
-

2,521.69
-

16,021.69
16,021.00

Lampung Selatan,28 Juni 2012


PT.DIRGANTARA ALAM

NENENG NURCHAYATI .S.sos


Direktur Utama

Harga /
Satuan

Total
Harga

ok

(Rp.)

(Rp.)

10,500.00

10,500.00

3,152.11
-

3,152.11
-

13,652.11
13,652.00

Lampung Selatan,28 Juni 2012


PT.DIRGANTARA ALAM

NENENG NURCHAYATI .S.sos


Direktur Utama

REKAPITULASI KUANTITAS DAN HARGA


Nama Pekerjaan
Lokasi
Nama Kegiatan
Tahun Anggaran

: Rehabilitasi Jaringan Rawa Mesuji Tulang Bawang Unit II Barat ( TL-Bawang )


: Kabupaten Tulang Bawang
:
: 2013

No.

URAIAN

Pekerjaan Persiapan

II

Rehab Saluran Pembuang Sekunder

III

Rehab Saluran Pembuang Sub Sekunder

IV

Rehab Bangunan Pembuang Sekunder

Err:509

(A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan )


(B) Pajak Pertambahan Nilai ( PPn ) = 10% x (A)
(C) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B)
(D) JUMLAH TOTAL DI BULATKAN
Terbilang :
Tiga Milyar Dua Ratus Sembilan Puluh Sembilan Juta Lima Ratus Empat Puluh Enam Ribu Rupiah + (PPN)
10 %

Natar,17 Desember 2012


PT. DIRGANTARA ALAM

NENENG NURCHAYATI.S.Sos
Direktur Utama

Jumlah Harga
Pekerjaan
(Rupiah)

12,000,000
208,545,076
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509

us Empat Puluh Enam Ribu Rupiah + (PPN)

6,720,725,000
Err:509
Err:509

100
Err:509

JADWAL WA
Nama Pekerjaan

: Pembangunan Gedung kantor BRI Tanjung Karang

Lokasi

: Kantor Wilayah BRI Tanjung karang

Nama Kegiatan

: Irigasi dan Rawa III

Nama Satuan Kerja

Tahun Anggaran

: 2013

No.

NVT.Pelaksanaan Jaringan Pemanfaatan Air Mesuji Sekampung

URAIAN

SAT

KUANTITAS

BOBOT
%

BULAN I
2

I
Pekerjaan Persiapan
1 ###
Mobilisasi / Demobilisasi

Ls

1.00

Err:509

II
1
2
3

M'
0
M3
M2

4,800.00
6,080.26
6,080.26

Err:509
Err:509
Err:509

Err:509

Err:509
Err:509
Err:509

Err:509

Rehab Saluran Pembuangan Sekunder


0
Galian Tanah dengan Alat Berat
Pembuangan Tanah

Err:509 Err:509
1 Err:509
2 Err:509
3 Err:509

Err:509
Err:509
Err:509
M2

Err:509
Err:509
Err:509
Err:509

Err:509

Err:509 Err:509
1 Err:509
2 Err:509
3 Err:509
4 Err:509
5 Err:509
6 Err:509
7 Err:509
8 Err:509
9 Err:509
10 Err:509
11 Err:509

Unit
Unit
Unit
M3
Btg
M3
M3
Err:509
Err:509
M'
Unit
M3

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509 Err:509
1 Err:509
2 Err:509
3 Err:509
4 Err:509
5 Err:509
6 Err:509
7 Err:509
8 Err:509
9 Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509

10

Err:509
JUMLAH
RENCANA PROGRES
KOMULATIF RENCANA PROGRES

Err:509

Err:509

Err:509
Err:509
Err:509 Err:509
Err:509 Err:509

ADWAL WAKTU PELAKSANAAN

B U L A N
BULAN I
3

Err:509

Err:509
Err:509

Err:509

Err:509

BULAN II
2

Err:509 Err:509
Err:509

Err:509
Err:509

Err:509

Err:509 Err:509
Err:509

Err:509

Err:509

BULAN III
2

Err:509 Err:509 Err:509


Err:509 Err:509 Err:509 Err:509

BULAN IV
2

Err:509
Err:509

Err:509
Err:509
Err:509 Err:509 Err:509
Err:509
Err:509 Err:509

Err:509

Err:509
Err:509
Err:509

Err:509
Err:509 Err:509
Err:509
Err:509 Err:509

Err:509 Err:509

Err:509

Err:509
Err:509
Err:509

Err:509
Err:509

Err:509 Err:509
Err:509 Err:509

Err:509
Err:509

Err:509
Err:509

Err:509 Err:509 Err:509 Err:509 Err:509


Err:509 Err:509 Err:509 Err:509 Err:509

Err:509
Err:509

0.00
Err:509

Nata
PT.

NENEN

BULAN IV

KET
4
Err:509

Err:509

Err:509
Err:509
Natar,17 Desember 2012
PT. DIRGANTARA ALAM

NENENG NURCHAYATI.S.Sos
Direktur Utama

Nomor
Lampiran

: 018/SPH/JLN/PDP/II/2011
: 1 (Satu) Berkas

Natar, 4 Januari 201

Kepada Yth,
Pokja ULP Balai Besar Pelaksana Jalan Nasional III
Satker Pelaksana Jalan Nasional Wilayah II Provinsi Lampung
Tahun Anggaran 2012
Di,
Bandar Lampung
Perihal

: Penawaran Pekerjaan
Penanganan Longsoran (Bengkunat - Sanggi)

Sehubungan dengan pengumuman pendaftaran dan pengambilan Dokumen Pengadaan nomor : 01/PENG-FBJ/POKJA
WIL.2-SKPD/APBN/XII/2011 tanggal 12 Desember 2011, dan setelah kami pelajari dengan seksama Dokumen Pengadaa
(serta Adendum Dokumen Pengadaan), dengan ini kami mengajukan
penawaran untuk pekerjaan
Penanganan Longsoran (Bengkunat - Sanggi)
Err:509
sebesar
:
Tiga Milyar Dua Ratus Sembilan Puluh Sembilan Juta Lima Ratus Empat Puluh Enam Ribu
Rupiah + (PPN) 10 %

Penawaran ini sudah memperhatikan ketentuan dan persyaratan yang tercantum dalam Dokumen Pengadaan untu
melasanakan pekerjaan tersebut di atas.

Kami akan melaksanakan pelaksanaan pekerjaan tersebut dengan jangka waktu pelaksanaan pekerjaan selama 270 (Du
Ratus Tujuh Puluh) hari kalender.
Penawaran ini berlaku selama 90 (sembilan puluh) hari kalender sejak tanggal surat penawaran ini.
Sesuai dengan persyaratan, bersama Surat Penawaran ini kami lampirkan, hasil penindaian/scan
1. Hasil pemindaian (scan) Jaminan Penawaran (atau asli);
2. Daftar Kuantitas dan Harga, apabila dipersyaratkan;
3. Surat Kuasa ( apabila diperlukan )
4. Surat Perjanjian Kemitraan / Kerja Sama Operasi, apabila ada;
5. Dokumen penawaran teknis, terdiri dari :
a
Metode Pelaksanaan;
b
Jadwal Waktu Pelaksanaan;
c
Daftar Personil Inti;
d
Jenis, Kapasitas, Komposisi, dan jumlah peralatan utama yang minimal dibutuhkan;

e
Spesifikasi teknis;(apabila mengajukan spesifikasi yang berbeda dari yang ditetapkan)
f
Bagian Pekerjaan yang akan disubkontrakkan
6. Formulir rekapitulasi perhitungan Tingkat Komponen Dalam Negeri (TKDN);
7. Dokumen isian kualifikasi
8. Formulir RK3K

Dengan disampaikan Surat Penawaran ini, maka kami menyatakan sanggup dan akan tunduk pada semua ketentuan yan
tercantum dalam Dokumen Pengadaan.

0
0

Natar, 4 Januari 2012

adaan nomor : 01/PENG-FBJ/POKJAri dengan seksama Dokumen Pengadaan

Ratus Empat Puluh Enam Ribu

m dalam Dokumen Pengadaan untuk

elaksanaan pekerjaan selama 270 (Dua

t penawaran ini.

indaian/scan

mal dibutuhkan;

ri yang ditetapkan)

kan tunduk pada semua ketentuan yang

0
0

Formulir Rekapitulasi Perhitungan TKDN1


Nama Pekerjaan
Lokasi Pekerjaan
Nama Kegiatan
Tahun Anggaran

:
:
:
:

Rehabilitasi Jaringan Rawa Mesuji Tulang Bawang Unit II Barat ( TL-Bawang )


Kabupaten Tulang Bawang
2013
Nilai Kontrak2 (Rp)

Uraian Pekerjaan
Barang
I.
Material Langsung (Bahan Baku)
II. Peralatan (Barang Jadi)
A. Sub - Total Barang
Jasa
III. Manajemen Proyek dan Perekayasaan
IV. Alat Kerja / Fasilitas Kerja
V. Konstruksi dan Fabrikasi
VI. Jasa Umum
B. Sub - Total Jasa
C. TOTAL Biaya (A+B)
Capaian nilai TKDN diatas dinyatakan sendiri oleh :

LN

DN

Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

TOTAL

% TKDN

Rp.

%KDN

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509

Barang
Err:509
Err:509
Err:509
Jasa
Err:509

Err:509
Err:509

TKDN Gabungan
Rp

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509
Err:509
Natar,17 Desember 2012
PT. DIRGANTARA ALAM

NENENG NURCHAYATI.S.Sos
Direktur Utama

ANALISA TEKNIK SATUAN PEKERJAAN


Jenis Pekerjaan
Satuan / Unit
Nomor Pembayaran
No
I

:
:
:

Pembersihan lapangan
M2
II.1, & III.1

Uraian

Satuan

Kuantitas/Koefisien

UPAH
Pekerja
Mandor

II

BAHAN

III

PERALATAN
Alat bantu

(UA1)
(UA10)
(UA8)

org/hri
org/hri

0.002
0.016

(AB25)

Ls

1.000

Catatan :
Isian kolom (1),(2),dan (4) disamakan dengan harga satuan Pekerjaan
Lampung Selatan,28 Juni 2012
PP.DIRGANTARA ALAM

NENENG NURCHAYATI . S.Sos


Direktur utama

ANALISA TEKNIK SATUAN PEKERJAAN

Jenis Pekerjaan
Satuan / Unit
Nomor Pembayaran
No
I

:
:
:

Bongkaran
Unit
IV.2,V.2

Uraian

Satuan

Kuantitas/Koefisien

UPAH
Pekerja
Mandor

II.

BAHAN

III

ALAT
Alat bantu
Mesi Las

(UA1)
(UA10)

org/hr
org/hr

1.667
0.333

(AB2)

Ls
Unit

1.000
1.000

Catatan :
Isian kolom (1),(2),dan (4) disamakan dengan harga satuan Pekerjaan
Lampung Selatan,28 Juni 2012
PP.DIRGANTARA ALAM

NENENG NURCHAYATI . S.Sos


Direktur utama

ANALISA TEKNIK SATUAN PEKERJAAN UTAMA


Jenis Pekerjaan
Satuan / Unit
Nomor Pembayaran

No

: Galian Saluran
: M3
: II.2,III.2

Uraian

Satuan

Kuantitas/Koefisien

UPAH
Pekerja
Mandor

II

BAHAN

III

ALAT
Excavator

Catatan

(UA1)
(UA10)

org/hr
org/hr

0.046
0.023

(AB27)

jam

0.023

:
Isian kolom (1),(2),dan (4) disamakan dengan harga satuan Pekerjaan
Lampung Selatan,28 Juni 2012
PP.DIRGANTARA ALAM

NENENG NURCHAYATI . S.Sos


Direktur utama

ANALISA TEKNIK SATUAN PEKERJAAN


Jenis Pekerjaan
Satuan Kerja
Nomor Pembayaran
No
I

Uraian

Satuan

Kuantitas/Koefisien

UPAH
Pekerja
Mandor

: Galian tanah
: M3
: IV.3,V.3

BAHAN

org/hr
org/hr

0.600
0.040

III

ALAT
Alat bantu
(Cangkul, belincong, keranjang)

Catatan

(AB1)

Ls

1.000

:
Isian kolom (1),(2),dan (4) disamakan dengan harga satuan Pekerjaan
Lampung Selatan,28 Juni 2012
PP.DIRGANTARA ALAM

NENENG NURCHAYATI . S.Sos


Direktur utama

ANALISA TEKNIK SATUAN PEKERJAAN


Jenis Pekerjaan
Satuan Kerja
Nomor Pembayaran
No
II

: Perapihan ( Baby Roller)


: M2
: II.3,III.3
Uraian

Kuantitas/Koefisien

TENAGA
Pekerja
Mandor

Satuan

(UA1)
(UA10)

org/hr
org/hr

0.001
0.000

(AB4)

Jam
Jam

0.003
0.012

BAHAN
Tanah Timbunan

III

ALAT
Excavtor
Baby Roller

Catatan

:
Isian kolom (1),(2),dan (4) disamakan dengan harga satuan Pekerjaan
Lampung Selatan,28 Juni 2012
PP.DIRGANTARA ALAM

NENENG NURCHAYATI . S.Sos


Direktur utama

ANALISA TEKNIK SATUAN PEKERJAAN


Jenis Pekerjaan
Satuan Kerja
Mata Pembayaran
No
I

Uraian

Satuan

Kuantitas/Koefisien

UPAH
Pekerja
Mandor

II

: Timbunan Tanah dipadatkan (Stemper)


: M3
: IV.9,V.8

###

org/hr
org/hr

0.187
0.094

(AB5)

Ls
Jam

1.000
0.750

BAHAN
Tanah Timbunan

III

ALAT
Alat bantu
Stemper

Catatan :
Isian kolom (1),(2),dan (4) disamakan dengan harga satuan Pekerjaan
Lampung Selatan,28 Juni 2012
PP.DIRGANTARA ALAM

NENENG NURCHAYATI . S.Sos


Direktur utama

ANALISA TEKNIK SATUAN PEKERJAAN UTAMA


Jenis Pekerjaan
Satuan /Unit
Nomer Pembayaran
No
I

: Beton Bertulang K 175


: M3
: IV.6,V.6
Uraian

(UA1)
(UA10)
(UA2)
(UA2)
(UA9)

org/hr
org/hr
org/hr
org/hr
org/hr
org/hr

4.800
0.200
0.400
0.105
0.105
0.040

(A9)
(A4)
(A8)

m2
Kg
zak
m3
m3

2.400
112.000
6.277
0.512
0.563

(AB8)
(AB4)

jam
jam

0.221
0.221

BAHAN
Begisting
Besi tulangan
Semen
Pasir Beton
Kerikil /Split Uk.1/2 Cm

III

Kuantitas/Koefisien

UPAH
Pekerja
Mandor
Tukang
Tukang Kayu
Tukang Besi
Kepala tukang

II

Satuan

ALAT
Mixer
Vibrator

Catatan :
Isian kolom (1),(2),dan (4) disamakan dengan harga satuan Pekerjaan
Lampung Selatan,28 Juni 2012
PP.DIRGANTARA ALAM

NENENG NURCHAYATI . S.Sos

Direktur utama

ANALISA TEKNIK SATUAN PEKERJAAN UTAMA


Jenis Pekerjaan
Satuan /Unit
Nomer Pembayaran
No
I

: Gorong-gorong Persegi ( Box Cluvert )


: M'
: IV.7
Uraian

(UA1)
(UA10)
(UA2)
(UA9)

org/hr
org/hr
org/hr
org/hr

(A9)
(A4)
(A8)

Bh
m3
m3

(AB8)
(AB4)

jam
Ls

1.981
0.295
0.438
Err:509

BAHAN
Beto Pabrikasi K 350 1 m
Pasir Urug
Err:509

III

Kuantitas/Koefisien

UPAH
Pekerja
Mandor
Tukang
Kepala tukang

II

Satuan

1.000
9.600
Err:509

ALAT
Stemper
Alat bantu

Catatan :
Isian kolom (1),(2),dan (4) disamakan dengan harga satuan Pekerjaan
Lampung Selatan,28 Juni 2012
PP.DIRGANTARA ALAM

NENENG NURCHAYATI . S.Sos


Direktur utama

ANALISA TEKNIK SATUAN PEKERJAAN

0.5333
1.0000

Jenis Pekerjaan
Satuan /Unit
Nomer Pembayaran
No
I

Uraian

Kuantitas/Koefisien

(UA1)
(UA10)
(UA2)
(UA9)

org/hr
org/hr
org/hr
org/hr

1.617
0.108
0.539
0.216

(A9)
(A4)
(A8)
(A8)

zak
m3
m3
m3

2.707
0.232
0.832
0.460

(AB8)
(AB4)

jam

0.2263

BAHAN
Semen
Pasir Beton
Split Uk.1/2 Cm
Split Uk.2/3 Cm

III

Satuan

UPAH
Pekerja
Mandor
Tukang
Kepala tukang

II

: Beton Lantai Kerja adk 1 : 3 : 6


: M3
: IV.5,V.5

ALAT
Mixer

Catatan :
Isian kolom (1),(2),dan (4) disamakan dengan harga satuan Pekerjaan
Lampung Selatan,28 Juni 2012
PP.DIRGANTARA ALAM

NENENG NURCHAYATI . S.Sos


Direktur utama

ANALISA TEKNIK SATUAN PEKERJAAN


Jenis Pekerjaan
Satuan /Unit

: Pembesian
: Kg

Nomer Pembayaran

No
I

Uraian

(UA1)
(UA10)
(UA2)

org/hr
org/hr
org/hr
org/hr

0.015
0.005

(Da1)
(Da3)

kg
kg

110.000
2.000

(AB13)

Ls

1.000

Err:509
0.010

BAHAN
Besi beton polos
Kawat Beton

III

Kuantitas/koefisien

UPAH
Pekerja
Mandor
Kepala tukang
Tukang besi

II

Satuan

ALAT
Alat bantu

Catatan :
Isian kolom (1),(2),dan (4) disamakan dengan harga satuan Pekerjaan
Lampung Selatan,28 Juni 2012
PP.DIRGANTARA ALAM

NENENG NURCHAYATI . S.Sos


Direktur utama

ANALISA TEKNIK SATUAN PEKERJAAN


Jenis Pekerjaan
Satuan / Unit
Mata Pembayaran
No

: Mobilisasi/Demobilisasi
: LS
: I.1
Uraian

Satuan

Kuantitas/Koefisien

No

Uraian

UPAH

II

BAHAN

III

ALAT
Exavator
Baby roller
Stemper
Concrete Mixer
Concrete vibrator
Pompa Air

Satuan

(AB26)
(AB2
(AB4
(AB8

Kuantitas/Koefisien

Unit
Unit
Unit
Unit
Unit
Unit

5.00
1.00
4.00
4.00
4.00
4.00

Catatan :
Isian kolom (1),(2),dan (4) disamakan dengan harga satuan Pekerjaan
Lampung Selatan,28 Juni 2012
PP.DIRGANTARA ALAM

NENENG NURCHAYATI . S.Sos


Direktur utama

ANALISA TEKNIK SATUAN PEKERJAAN


Jenis Pekerjaan
Satuan / Unit
Mata Pembayaran
No
I.

: Begisting
: m2
: IV.6
Uraian

Satuan

Kuantitas/Koefisien

UPAH
Pekerja

(UA1)

org/hr

0.714

Mandor
Tukang
Kepala tukang

II

org/hr
org/hr
org/hr

0.071
0.143
0.071

(A9)

m3
Kg
Ltr
m3

0.240
0.400
1.600
0.160

BAHAN
Kayu Kls III
Paku 5 cm-12 cm
Minyak Begisting
Kayu Kaso 5/7

III

(UA10)
(UA2)
(UA9)

(A4)
(A8)

ALAT
0(AB8)
(AB4)

Catatan :
Isian kolom (1),(2),dan (4) disamakan dengan harga satuan Pekerjaan
Lampung Selatan,28 Juni 2012
PP.DIRGANTARA ALAM

NENENG NURCHAYATI . S.Sos


Direktur utama

ANALISA TEKNIK SATUAN PEKERJAAN


Jenis Pekerjaan
Satuan / Unit
Mata Pembayaran
No
I.

: Pas Kayu Pancang Gelam


: Btg
: IV.4,V.4
Uraian

Satuan

Kuantitas/Koefisien

UPAH
Pekerja
Mandor

(UA1)
(UA10)
(UA2)

org/hr
org/hr

0.120
0.040

II

BAHAN
Kayu Gelam

III

ALAT
Ala bantu

(A9)
(A4)
(A8)

Btg

1.00

(AB4)

Ls

1.00

Catatan :
Isian kolom (1),(2),dan (4) disamakan dengan harga satuan Pekerjaan
Lampung Selatan,28 Juni 2012
PP.DIRGANTARA ALAM

NENENG NURCHAYATI . S.Sos


Direktur utama

ANALISA TEKNIK SATUAN MATA PEMBAYARAN UTAMA


Jenis Pekerjaan
Satuan / Unit
Mata Pembayaran
No
I

: Pemasangan Pintu Sorong


: Unit
: IV.8
Uraian

Kuantitas/Koefisien

UPAH
Pekerja
Mandor

II

Satuan

BAHAN
- Plat daun pintu
- Bingkai pintu
- Besi siku L.70.70.7
- Batang ulir

Org/Hr
Org/Hr

Kg
Kg
Kg
Kg

4.00
0.50

34.03
5.45
109.52
37.68

- Batang pemutar

III

Kg

1.87

ALAT
Alat Bantu

Ls

Catatan :
Isian kolom (1),(2),dan (4) disamakan dengan harga satuan Pekerjaan
Lampung Selatan,28 Juni 2012
PP.DIRGANTARA ALAM

NENENG NURCHAYATI . S.Sos


Direktur utama

ANALISA TEKNIK SATUAN PEKERJAAN


Jenis Pekerjaan
Satuan / Unit
Mata Pembayaran
No
I.

Uraian

Kuantitas/Koefisien

(UA1)
(UA10)
(UA2)

org/hr
org/hr

0.125
0.250

(A9)
(A4)
(A8)

Bh
m3

163.0
3.3

Ls

1.0000

BAHAN
Karung
Tanah Urug

III

Satuan

UPAH
Pekerja
Mandor

II

: Pengeringan / Kistdam
: Unit
: IV.1.V1

ALAT
Pompa Air

Ala bantu

(AB4)

Ls

1.00

Catatan :
Isian kolom (1),(2),dan (4) disamakan dengan harga satuan Pekerjaan
Lampung Selatan,28 Juni 2012
PP.DIRGANTARA ALAM

NENENG NURCHAYATI . S.Sos


Direktur utama

ANALISA SATUAN TEKNIK MATA PEMBAYARAN UTAMA


Jenis Pekerjaan
Satuan / Unit
Mata Pembayaran
No
I

: Pemasangan Pintu Klep


: Unit
: V.7
Uraian

Org/Hr
Org/Hr

3.00
0.50

Ls

1.00

Ls

1.00

BAHAN
Harga Bahan Pintu
Termasuk Acsesories

III

Kuantitas

UPAH
Pekerja
Mandor

II

Satuan

ALAT
Alat Bantu

Catatan :
Isian kolom (1),(2),dan (4) disamakan dengan harga satuan Pekerjaan
Lampung Selatan,28 Juni 2012
PP.DIRGANTARA ALAM

NENENG NURCHAYATI . S.Sos


Direktur utama

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan
Satuan / Unit
Nomor Pembayaran
No
I

:
:
:
Uraian

Satuan

Kuantitas

UPAH
Pekerja
Mandor

II

BAHAN

III

PERALATAN
Alat bantu

IV

Pembersihan lapangan
M2
II.1, & III.1

(UA1)
(UA10)
(UA8)

org/hri
org/hri

0.002
0.016

(AB25)

Ls

1.000

LAIN-LAIN
Biaya Umum
Keuntungan

0.75 %
10.00 %

x
x

Harga satuan pekerjaan dibulatkan

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan

Bongkaran

Satuan / Unit
Nomor Pembayaran
No
I

:
:
Uraian

Satuan

Kuantitas

UPAH
Pekerja
Mandor

II.

BAHAN

III

ALAT
Alat bantu
Mesin Las

IV

Unit
IV.2,V.2

LAIN-LAIN
Biaya Umum
Keuntungan

(UA1)
(UA10)

org/hr
org/hr

1.667
0.333

(AB2)

Ls
Unit

1.000
1.000

0.75 %
10.00 %

x
x

Harga satuan pekerjaan dibulatkan

ANALISA HARAGA SATUAN PEKERJAAN UTAMA


Jenis Pekerjaan
Satuan / Unit
Nomor Pembayaran
No

: Galian Tanah Dengan Alat Berat


: M3
: II.2,III.2
Uraian

Satuan

Kuantitas

UPAH
Pekerja
Mandor

II

BAHAN

III

ALAT
Excavator

IV

BIAYA LAIN-LAIN
Biaya Umum
Keuntungan

(UA1)
(UA10)

org/hr
org/hr

0.046
0.023

(AB27)

jam

0.023

0.75 %
10.00 %

x
x

Harga Satuan Pekerjaan dibulatkan

ANALISA HARGA SATUAN


Jenis Pekerjaan
Satuan Kerja
Nomor Pembayaran
No
I

: Galian tanah
: M3
: IV.3,V.3
Uraian

Satuan

Kuantitas

UPAH
Pekerja
Mandor

org/hr
org/hr

0.600
0.040

BAHAN

III

ALAT
Alat bantu
(Cangkul, belincong, keranjang)

IV

(AB1)

Ls

BIAYA LAIN-LAIN
Biaya Umum
Keuntungan

1.000

0.75 %
10.00 %

x
x

Harga Satuan Pekerjaan dibulatkan

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan
Satuan Kerja
Nomor Pembayaran
No
II

Uraian

Satuan

Kuantitas

TENAGA
Pekerja
Mandor

: Perapihan ( Baby Roller)


: M2
: II.3,III.3

BAHAN
Tanah Timbunan

(UA1)
(UA10)

org/hr
org/hr

0.001
0.000

III

ALAT
Excavtor
Baby Roller

IV

(AB4)

BIAYA LAIN-LAIN
Biaya Umum
Keuntungan

Jam
Jam

0.75 %
10.00 %

0.003
0.012

x
x

Harga Satuan Pekerjaan dibulatkan

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan
Satuan Kerja
Mata Pembayaran
No
I

Uraian

Satuan

Kuantitas

UPAH
Pekerja
Mandor

II

: Timbunan Tanah dipadatkan (Stemper)


: M3
: IV.9,V.8

#REF!

org/hr
org/hr

0.187
0.094

(AB5)

Ls
Jam

1.000
0.750

BAHAN
Tanah Timbunan

III

ALAT
Alat bantu
Stemper

IV

BIAYA LAIN-LAIN
Biaya Umum
Keuntungan

0.75 %
10.00 %

x
x

Harga Satuan Pekerjaan dibulatkan

ANALISA HARGA SATUAN PEKERJAAN UTAMA


Jenis Pekerjaan
Satuan /Unit
Nomer Pembayaran
No
I

: Beton Bertulang K 175


: M3
: IV.6,V.6
Uraian

III

Kuantitas

UPAH
Pekerja
Mandor
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala tukang

II

Satuan

BAHAN
Begisting
Besi tulangan
Semen
Pasir Beton
Kerikil /Split Uk.1/2 Cm

(UA1)
(UA10)
(UA2)
(UA2)
(UA9)

(A9)
(A4)
(A8)
(A8)

org/hr
org/hr
org/hr
org/hr
org/hr
org/hr

1.052
0.105
0.210
0.105
0.105
0.105

m2
Kg
zak
m3
m3

2.40
112.000
6.277
0.512
0.563

jam
jam

0.221
0.221

ALAT
Mixer
Vibrator

(AB8)
(AB4)

IV

BIAYA LAIN-LAIN
Biaya Umum
Keuntungan

0.75 %
10.00 %

x
x

Harga Satuan Pekerjaan dibulatkan

ANALISA HARGA SATUAN PEKERJAAN UTAMA


Jenis Pekerjaan
Satuan /Unit
Nomer Pembayaran
No
I

: Gorong-gorong Persegi ( Box Cluvert )


: M'
: IV.7
Uraian

org/hr
org/hr
org/hr

1.981
0.295
0.438

(A9)
(A4)
(A8)

Bh
m3

1.000
9.600

(AB8)
(AB4)

jam
Ls

0.533
1.000

ALAT
Stemper
Alat Bantu

IV

(UA1)
(UA10)
(UA2)
(UA9)

BAHAN
Beto Pabrikasi K 350 1 m
Pasir Urug

III

Kuantitas

UPAH
Pekerja
Mandor
Tukang

II

Satuan

BIAYA LAIN-LAIN

Biaya Umum
Keuntungan

0.75 %
10.00 %

x
x

Harga Satuan Pekerjaan dibulatkan

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan
Satuan /Unit
Nomer Pembayaran
No
I

Uraian

(UA1)
(UA10)
(UA2)
(UA9)

org/hr
org/hr
org/hr
org/hr

1.617
0.108
0.539
0.216

(A9)
(A4)
(A8)
(A8)

zak
m3
m3
m3

2.707
0.232
0.832
0.460

(AB8)
(AB4)

jam

0.2263

ALAT
Mixer

IV

Kuantitas

BAHAN
Semen
Pasir Beton
Split Uk.1/2 Cm
Split Uk.2/3 Cm

III

Satuan

UPAH
Pekerja
Mandor
Tukang
Kepala tukang

II

: Beton Lantai Kerja adk 1 : 3 : 6


: M3
: IV.5,V.5

BIAYA LAIN-LAIN
Biaya Umum
Keuntungan

0.75 %
10.00 %

x
x

Harga Satuan Pekerjaan dibulatkan

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan
Satuan /Unit
Nomer Pembayaran
No
I

Uraian

(UA1)
(UA10)
(UA2)

org/hr
org/hr
org/hr

0.015
0.005
0.010

(Da1)
(Da3)

kg
kg

110.00
2.000

(AB13)

Ls

1.000

ALAT
Alat bantu

IV

Kuantitas

BAHAN
Besi beton polos
Kawat Beton

III

Satuan

UPAH
Pekerja
Mandor
Tukang besi

II

: Pembesian
: Kg
:

BIAYA LAIN-LAIN
Biaya Umum
Keuntungan

0.75 %
10.00 %

x
x

Harga satuan/kg dibulatkan

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan
Satuan / Unit
Mata Pembayaran
No

Uraian

UPAH

II

BAHAN

III

ALAT
Exavator
Baby roller
Stemper
Concrete Mixer
Concrete vibrator
Teodolite
WaterPass
mesin Las
Pompa Air

IV

: Mobilisasi/Demobilisasi
: LS
: I.1

BIAYA LAIN-LAIN
Biaya Umum
Keuntungan

Harga satuan dibulatkan

Satuan

(AB27)
(AB4)
(AB8)

Kuantitas

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

0.75 %
10.00 %

5.00
1.00
4.00
4.00
4.00
2.00
3.00
1.00
4.00

x
x

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan
Satuan / Unit
Mata Pembayaran
No
I.

: Begisting
: m2
: IV.6
Uraian

(UA1)
(UA10)
(UA2)
(UA9)

org/hr
org/hr
org/hr
org/hr

0.714
0.071
0.143
0.071

(A9)

m3
Kg
Ltr
m3

0.240
0.400
1.600
0.160

BAHAN
Kayu Kls III
Paku 5 cm-12 cm
Minyak Begisting
Kayu Kaso 5/7

III

Kuantitas

UPAH
Pekerja
Mandor
Tukang
Kepala tukang

II

Satuan

(A4)
(A8)

ALAT
(AB8)
(AB4)

IV

BIAYA LAIN-LAIN
Biaya Umum
Keuntungan

Harga satuan dibulatkan


Harga satuan/m2 dibulatkan

0.75 %
10.00 %

x
x

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan
Satuan / Unit
Mata Pembayaran
No
I.

: Pas Kayu Pancang Gelam


: Btg
: IV.4,V.4
Uraian

IV

(UA1)
(UA10)
(UA2)

org/hr
org/hr

0.120
0.040

(A9)
(A4)
(A8)

Btg

1.000

(AB4)

Ls

1.00

BAHAN
Kayu Gelam

III

Kuantitas

UPAH
Pekerja
Mandor

II

Satuan

ALAT
Ala bantu

BIAYA LAIN-LAIN
Biaya Umum
Keuntungan

Harga satuan dibulatkan

0.75 %
10.00 %

x
x

ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA


Jenis Pekerjaan
Satuan / Unit
Mata Pembayaran
No
I

: Pembuatan/Pemasangan Pintu Sorong


: Unit
: IV.8
Uraian

III

BAHAN
- Plat daun pintu
- Bingkai pintu
- Besi siku L.70.70.7
- Batang ulir
- Batang pemutar

Org/Hr
Org/Hr

4.00
0.50

Kg
Kg
Kg
Kg
Kg

34.03
5.45
109.52
37.68
1.87

ls

1.00

ALAT
Alat bantu

IV

Kuantitas

UPAH
Pekerja
Mandor

II

Satuan

BIAYA LAIN-LAIN
Biaya Umum
Keuntungan

0.75 %
10.00 %

x
x

Harga satuan dibulatkan

ANALISA HARGA SATUAN PEKERJAAN


Jenis Pekerjaan

: Pengeringan / Kistdam

Satuan / Unit
Mata Pembayaran
No
I.

: Unit
: IV.1.V1
Uraian

IV

(UA1)
(UA10)
(UA2)

org/hr
org/hr

0.125
0.250

(A9)
(A4)
(A8)

Bh
m3

163.0
3.3

Ls
Ls

1.000
1.000

BAHAN
Karung
Tanah Urug

III

Kuantitas

UPAH
Pekerja
Mandor

II

Satuan

ALAT
Pompa Air
Ala bantu

BIAYA LAIN-LAIN
Biaya Umum
Keuntungan

(AB4)

0.75 %
10.00 %

x
x

Harga satuan dibulatkan

ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA


Jenis Pekerjaan
Satuan / Unit
Mata Pembayaran

: Pembuatan/Pemasangan Pintu Klep


: Unit
: V.7

No
I

Uraian

3.00
0.50

Ls

1.00

Ls

1.00

ALAT
Alat Bantu

IV

Org/Hr
Org/Hr

BAHAN
Harga Bahan Pintu

III

Kuantitas

UPAH
Pekerja
Mandor

II

Satuan

BIAYA LAIN-LAIN
Biaya Umum
Keuntungan

Harga satuan dibulatkan

0.75 %
10.00 %

x
x

TUAN PEKERJAAN

Harga Satuan (Rp)

Jumlah Harga (Rp)

38,000.00
80,000.00

Sub Jumlah 1

84.44
1,244.44

1,328.89

Sub Jumlah II

150.00

150.00

Sub Jumlah III


Sub Jumlah ( I+II +III )

150.00
1,478.89

Sub Jumlah ( I+II+III)


Sub Jumlah (I+II+III)
Sub Jumlah (IV)
Sub Jumlah (I+II+III+IV)

11.09
147.89
158.98
1,637.87
1,637.00

Natar , 18 desember 2012


PT.DIRGANTARA ALAM

NENENG NURCHAYATI,S.Sos
Direktur Utama

TUAN PEKERJAAN

Harga Satuan (Rp)

Jumlah Harga (Rp)

38,000.00
80,000.00

63,333.33
26,666.67
90,000.00

5,000.00
75,000.00

5,000.00
75,000.00

Sub Jumlah 1

Sub Jumlah II

Sub Jumlah III


Sub Jumlah ( I+II +III )

80,000.00
170,000.00

Sub Jumlah ( I+II+III)


Sub Jumlah (I+II+III)
Sub Jumlah (IV)
Sub Jumlah (I+II+III+IV)

1,275.00
17,000.00
18,275.00
188,275.00
188,275.00

Natar , 18 desember 2012


PT.DIRGANTARA ALAM

NENENG NURCHAYATI,S.Sos
Direktur Utama

AN PEKERJAAN UTAMA

n Alat Berat

Harga Satuan (Rp)

Jumlah Harga (Rp)

30,750.00
47,500.00
SUB JUMLAH I

1,411.36
1,090.07
2,501.43

SUB JUMLAH II

316,000.00

7,251.86

SUB JUMLAH III


SUB JUMLAH (I+II+III)

7,251.86
9,753.30

Sub Jumlah ( I+II+III)


Sub Jumlah (I+II+III)
Sub Jumlah (IV)
Sub Jumlah (I+II+III+IV)

73.15
975.33
1,048.48
10,801.78
10,801.00

Natar , 18 desember 2012


PT.DIRGANTARA ALAM

NENENG NURCHAYATI,S.Sos
Direktur Utama

GA SATUAN

Harga Satuan (Rp)

38,000.00
80,000.00
SUB JUMLAH I

Jumlah Harga (Rp)

22,800.00
3,200.00
26,000.00

SUB JUMLAH II

7,500.00

7,500.00

SUB JUMLAH III


SUB JUMLAH (I+II+III)

7,500.00
33,500.00

Sub Jumlah ( I+II+III)


Sub Jumlah (I+II+III)
Sub Jumlah (IV)
Sub Jumlah (I+II+III+IV)

251.25
3,350.00
3,601.25
37,101.25
37,101.00

Natar , 18 desember 2012


PT.DIRGANTARA ALAM

NENENG NURCHAYATI,S.Sos
Direktur Utama

TUAN PEKERJAAN

Harga Satuan (Rp)

38,000.00
80,000.00

Jumlah Harga (Rp)

SUB JUMLAH I

41.41
29.06
70.47

SUB JUMLAH II

316,000.00
62,000.00

918.25
746.99

SUB JUMLAH III


SUB JUMLAH (I+II+III)

1,665.24
1,735.70

Sub Jumlah ( I+II+III)


Sub Jumlah (I+II+III)
Sub Jumlah (IV)
Sub Jumlah (I+II+III+IV)

13.02
173.57
186.59
1,922.29
1,922.00

Natar , 18 desember 2012


PT.DIRGANTARA ALAM

NENENG NURCHAYATI,S.Sos
Direktur Utama

TUAN PEKERJAAN

adatkan (Stemper)

Harga Satuan (Rp)

38,000.00
80,000.00

Jumlah Harga (Rp)

SUB JUMLAH I

7,121.82
7,496.65
14,618.47

SUB JUMLAH II

5,000.00
22,000.00
SUB JUMLAH III

5,000.00
16,492.64
21,492.64

SUB JUMLAH (I+II+III)

36,111.11

Sub Jumlah ( I+II+III)


Sub Jumlah (I+II+III)
Sub Jumlah (IV)
Sub Jumlah (I+II+III+IV)

270.83
3,611.11
3,881.94
39,993.06
39,993.00

Natar , 18 desember 2012


PT.DIRGANTARA ALAM

NENENG NURCHAYATI,S.Sos
Direktur Utama

AN PEKERJAAN UTAMA

Harga Satuan (Rp)

Jumlah Harga (Rp)

38,000.00
80,000.00
45,000.00
45,000.00
45,000.00
50,000.00

39,969.40
8,414.61
9,466.44
4,733.22
4,733.22
5,259.13
72,576.02

119,130.00
13,033.00
69,204.00
197,087.00
339,246.00

285,912
1,459,696.00
434,388.18
100,908.54
190,913.61

SUB JUMLAH I

SUB JUMLAH II

2,185,906.34

37,000.00
35,000.00

8,172.69
7,730.92

SUB JUMLAH III


SUB JUMLAH (I+II+III)

15,903.61
2,274,385.97

Sub Jumlah ( I+II+III)


Sub Jumlah (I+II+III)
Sub Jumlah (IV)
Sub Jumlah (I+II+III+IV)

17,057.89
227,438.60
244,496.49
2,518,882.46
2,518,882.00

Natar , 18 desember 2012


PT.DIRGANTARA ALAM

NENENG NURCHAYATI,S.Sos
Direktur Utama

AN PEKERJAAN UTAMA

segi ( Box Cluvert )

Harga Satuan (Rp)

38,000.00
80,000.00
45,000.00
SUB JUMLAH I

75,276.19
23,619.05
19,714.29
118,609.52

775,000.00
103,834.00
SUB JUMLAH II

775,000.00
996,806.40
1,771,806.40

22,000.00
20,000.00
SUB JUMLAH III
SUB JUMLAH (I+II+III)

Jumlah Harga (Rp)

11,733.33
20,000.00
31,733.33
1,922,149.26

Sub Jumlah ( I+II+III)


Sub Jumlah (I+II+III)
Sub Jumlah (IV)
Sub Jumlah (I+II+III+IV)

14,416.12
192,214.93
206,631.05
2,128,780.30
2,128,780.00

Natar , 18 desember 2012


PT.DIRGANTARA ALAM

NENENG NURCHAYATI,S.Sos
Direktur Utama

TUAN PEKERJAAN

Harga Satuan (Rp)

38,000.00
80,000.00
45,000.00
50,000.00

61,434.45
8,622.38
24,250.44
10,777.97
105,085.24

69,204.00
197,087.00
339,246.00
319,246.00

187,319.10
45,725.88
282,263.13
146,853.16
662,161.26

37,000.00

8,374.49

SUB JUMLAH I

SUB JUMLAH II

SUB JUMLAH III


SUB JUMLAH (I+II+III)
Sub Jumlah ( I+II+III)
Sub Jumlah (I+II+III)

Jumlah Harga (Rp)

8,374.49
775,620.99
5,817.16
77,562.10

Sub Jumlah (IV)


Sub Jumlah (I+II+III+IV)

83,379.26
859,000.25
859,000.00

Natar , 18 desember 2012


PT.DIRGANTARA ALAM

NENENG NURCHAYATI,S.Sos
Direktur Utama

TUAN PEKERJAAN

Harga Satuan (Rp)

38,000.00
80,000.00
45,000.00

570.00
400.00
450.00
1,420.00

13,033.00
13,652.00

1,433,630.00
27,304.00

SUB JUMLAH I

SUB JUMLAH II

1,460,934.00

5,000.00
SUB JUMLAH III
SUB JUMLAH (I+II+III)
Sub Jumlah ( I+II+III)
Sub Jumlah (I+II+III)
Sub Jumlah (IV)

Jumlah Harga (Rp)

5,000.00
5,000.00
1,467,354.00
11,005.16
146,735.40
157,740.56

Sub Jumlah (I+II+III+IV)

1,625,094.56
16,250.95

Natar , 18 desember 2012


PT.DIRGANTARA ALAM

NENENG NURCHAYATI,S.Sos
Direktur Utama

TUAN PEKERJAAN

Harga Satuan (Rp)

Jumlah Harga (Rp)

SUB JUMLAH I

SUB JUMLAH II

4,500,000.00
4,500,000.00
400,000.00
400,000.00
400,000.00
400,000.00
400,000.00
400,000.00
400,000.00
SUB JUMLAH III
SUB JUMLAH (I+II+III)
Sub Jumlah ( I+II+III)
Sub Jumlah (I+II+III)
Sub Jumlah (IV)
Sub Jumlah (I+II+III+IV)
Natar , 18 desember 2012
PT.DIRGANTARA ALAM

22,500,000.00
4,500,000.00
1,600,000.00
1,600,000.00
1,600,000.00
800,000.00
1,200,000.00
400,000.00
1,600,000.00
35,800,000.00
35,800,000.00
268,500.00
3,580,000.00
3,848,500.00
39,648,500.00
39,648,500.00

NENENG NURCHAYATI,S.Sos
Direktur Utama

TUAN PEKERJAAN

Harga Satuan (Rp)

Jumlah Harga (Rp)

38,000.00
80,000.00
45,000.00
50,000.00

27,142.86
5,714.29
6,428.57
3,571.43
42,857.14

1,500,000.00
16,021.00
10,500.00
1,819,075.00

360,000.00
6,408.40
16,800.00
291,052.00

SUB JUMLAH I

SUB JUMLAH II

674,260.40

SUB JUMLAH III


SUB JUMLAH (I+II+III)

717,117.54

Sub Jumlah ( I+II+III)


Sub Jumlah (I+II+III)
Sub Jumlah (IV)
Sub Jumlah (I+II+III+IV)

5,378.38
71,711.75
77,090.14
794,207.68
794,200.00
119,130.00

Natar , 18 desember 2012


PT.DIRGANTARA ALAM

NENENG NURCHAYATI,S.Sos
Direktur Utama

TUAN PEKERJAAN

Harga Satuan (Rp)

38,000.00
80,000.00
SUB JUMLAH I

Jumlah Harga (Rp)

4,560.00
3,200.00
7,760.00

16,867.00

SUB JUMLAH II

16,867.00

16,867.00

5,000.00
SUB JUMLAH III
SUB JUMLAH (I+II+III)
Sub Jumlah ( I+II+III)
Sub Jumlah (I+II+III)
Sub Jumlah (IV)
Sub Jumlah (I+II+III+IV)
Natar , 18 desember 2012
PT.DIRGANTARA ALAM

NENENG NURCHAYATI,S.Sos

5,000.00
5,000.00
29,627.00
222.20
2,962.70
3,184.90
32,811.90
32,810.00

Direktur Utama

ATA PEMBAYARAN UTAMA

ngan Pintu Sorong

Harga Satuan (Rp)

Jumlah Harga (Rp)

30,750.00
80,000.00

123,000.00
40,000.00
163,000.00

45,000.00
30,000.00
27,500.00
9,450.00
9,450.00

1,531,338.75
163,545.23
3,011,778.00
356,046.30
17,667.61

SUB JUMLAH I

SUB JUMLAH II

5,080,375.89

25,000.00

25,000.00

SUB JUMLAH III


SUB JUMLAH (I+II+III)

25,000.00
5,268,375.89

Sub Jumlah ( I+II+III)


Sub Jumlah (I+II+III)
Sub Jumlah (IV)
Sub Jumlah (I+II+III+IV)

39,512.82
526,837.59
566,350.41
5,834,726.29
5,834,720.00

Natar , 18 desember 2012


PT.DIRGANTARA ALAM

NENENG NURCHAYATI.S.Sos
Direktur Utama

TUAN PEKERJAAN

Harga Satuan (Rp)

38,000.00
80,000.00
SUB JUMLAH I

SUB JUMLAH II

122,250.00
65,200.00
187,450.00

35,000.00
10,000.00
SUB JUMLAH III
SUB JUMLAH (I+II+III)
Sub Jumlah ( I+II+III)
Sub Jumlah (I+II+III)
Sub Jumlah (IV)
Sub Jumlah (I+II+III+IV)
Natar , 18 desember 2012
PT.DIRGANTARA ALAM

NENENG NURCHAYATI,S.Sos
Direktur Utama

ngan Pintu Klep

4,750.00
20,000.00
24,750.00

750.00
20,000.00

ATA PEMBAYARAN UTAMA

Jumlah Harga (Rp)

35,000.00
10,000.00
45,000.00
257,200.00
1,929.00
25,720.00
27,649.00
284,849.00
284,840.00

Harga Satuan (Rp)

38,000.00
80,000.00
SUB JUMLAH I

Jumlah Harga (Rp)

114,000.00
40,000.00
154,000.00

5,375,000.00
SUB JUMLAH II

5,375,000.00
5,375,000.00

65,000.00

65,000.00

SUB JUMLAH III


SUB JUMLAH (I+II+III)

65,000.00
5,594,000.00

Sub Jumlah ( I+II+III)


Sub Jumlah (I+II+III)
Sub Jumlah (IV)
Sub Jumlah (I+II+III+IV)

41,955.00
559,400.00
601,355.00
6,195,355.00
6,195,350.00

Natar , 18 desember 2012


PT.DIRGANTARA ALAM

NENENG NURCHAYATI.S.Sos
Direktur Utama

BAGIAN PEKERJAAN YANG AKAN DISUBKONTRAKAN


Nama Pekerjaan
Lokasi
Nama kegiatan
Nama Satuan Kerja
Tahun Anggaran
PENAWAR
NO

:
:
:
:
:
:

Rehabilitasi Jaringan Rawa Mesuji Tulang Bawang Unit II Barat ( TL-Bawang )


Kabupaten Tulang Bawang
NVT.Pelaksanaan Jaringan Pemanfaatan Air Mesuji Sekampung
2013
PT. DIRGANTARA ALAM
Satuan

Nama/Uraian Pekerjaan

Volume

Harga
Satuan ( RP )

Jumlah Harga
( Rp)

Tidak ada

Jumlah

Catatan :
Levaransir Pemasok Bahan tidak termasuk sebagai Sub-Kontraktor

Natar, 17 Dese3mber 2012


PT.DIRGANTARA ALAM

NENENG NURCHAYATI.S.Sos
Direktur Utama

Bobot
%