OptiX RTN 600 Routine Maintenance
OptiX RTN 600 Routine Maintenance
Routine
Maintenance
www.huawei.com
Foreword
The OptiX RTN 600 radio transmission
system is a type of short-haul digital
microwave transmission system developed
by Huawei. The system supports a
maximum transmission capacity of 1xSTM1 over one microwave carrier. The OptiX
RTN 600 adopts a split-mount structure
and a PDH/SDH integrated microwave
transmission platform. It can be used to
provide backhaul in mobile communication
networks or private networks, or to
compose transmission networks together
with optical transmission equipment.
Page 2
Page 3
Reference
Page 4
Objective
After this course, you will be
able to:
Page 5
Contents
1.
Routine Maintenance
Suggestions
2.
Routine Maintenance
Operations
Page 6
Contents
Routine Maintenance
Suggestions
Page 7
Page 8
Contents
Page 9
Page 10
ON
ON
ON
OFF
SRV
Page 11
ON
OFF
BER
Page 12
ODU
ON
ON
Page 13
STAT
ON
ON
OFF
Page 14
Contents
Page 15
Check the SRV indicator to see if any service error has occurred.
Check the STAT indicator to see if any board hardware error has
occurred.
Page 16
Page 17
Cleaning the air filter is necessary only for the IDU 620
that is configured with fans.
Page 18
1. Temperature: 5 to 45.
2. Humidity: 5% to 95%.
3. Disaster protection.
Page 19
Contents
Routine Maintenance
Suggestions
Page 20
ODU Maintenance
It is recommend to perform
Antenna
ODU
coupler
IF cable
Page 21
Page 22
Connections between
hybrid coupler to ODU
and antenna.
Page 23
No water accumulation in
antenna.
Page 24
Page 25
Contents
Routine Maintenance
Suggestions
Page 26
Querying alarms
Querying performance
Page 27
Browsing Alarms
Page 28
Contents
Routine Maintenance
Suggestions
Page 29
Querying alarms
Querying performance
Page 30
Summary
Page 31
Contents
1.
Routine Maintenance
Suggestions
2.
Routine Maintenance
Operations
Page 32
Contents
Routine Maintenance
Operations
Replacing an ODU
Replacing a Board
Replacing an IF Board
Page 33
Replacing an ODU
Power off .
Disconnect cables.
Uninstall ODU.
Page 34
Step 1:
Loosen the screws on
the front panel.
Step 3:
Draw out the board along
the guiding rail.
Step 2:
Unlock the ejector levers of the board
so that the board is disconnected from
the backplane.
Page 35
Plugging In a Board
Step 1:
Slowly inserting the board along
the guiding rail.
Step 3:
Fasten the screws
on the front panel.
Step 2:
Lock the ejector levers of
the board.
Page 36
Replacing an IF Board
When the IF board to be replaced is the working board configured with the 1+1
protection, use the Web LCT or T2000 to perform forced switching for the board.
When the service of the board to be replaced is the working service configured
with the SNCP, use the Web LCT or T2000 to perform forced switching for the
service.
Turn off the ODU-PWR switch of the IF board to be replaced. Disconnect the IF
cable.
Make sure the version and type of the spare board are consistent with those of
the board to be replaced.
When the board is working, observe the indicators. The STAT indicator should be
lit green.
If the SNCP forced switching was performed for the service, use the Web LCT or
T2000 to cancel it. If the 1+1 protection forced switching of the board was
performed, use the Web LCT or T2000 to cancel it.
Page 37
Page 38
Summary
Replacing an ODU
Replacing an IF board
Page 39
Thank you