Professional Documents
Culture Documents
May 2015
May 2015
2015
Date
1-May
2-May
3-May
4-May
5-May
6-May
7-May
8-May
9-May
10-May
11-May
12-May
13-May
14-May
15-May
16-May
17-May
Length
BS
ft
450 mm
BW
DW
ft
ft
600 mm
BS
BW
CS
ft
ft
ft
40'
40'
20'
40'
20'
40'
20'
40'
20'
40'
20'
40'
20'
40'
20'
40'
20'
700 mm
BW CS
14
20'
40'
20'
40'
20'
40'
20'
40'
20'
40'
20'
40'
20'
40'
20'
40'
20'
BS
16
6.0
6.0
5.0
4.0
2.0
3.0
6.0
6
3
800 mm
BS
BW cw
ft
ft
ft
18-May
19-May
20-May
21-May
22-May
23-May
24-May
25-May
26-May
27-May
28-May
29-May
30-May
31-May
Total
Delivered
Remaining
40'
20'
40'
20'
40'
20'
40'
20'
40'
20'
40'
20'
40'
20'
40'
20'
40'
20'
40'
20'
40'
20'
40'
20'
40'
20'
40'
20'
40'
20'
40'
20'
40'
20'
0
0
0
0
0
0
0
0
0
0
2
0
53
0
36
0
0
3
0
0
0
16
0
0
0
0
0
0
0
0
0
0
0
0
0
2
0
17
0
0
0
3
0
0
0
16
0
0
0
oduction Status
250 mm
DS
CS
BW
ft
ft
ft
500 mm
BS
BW
CS
ft
ft
ft
BS
ft
300 mm
BW
CS
ft
ft
BS
ft
900 mm
BW
CS
ft
ft
5
1
6
6
32.8
CS
ft
400 mm
BW
DW
ft
ft
0
0
0
0
0
0
0
0
0
0
17
1
17
1
0
0
0
0
0
0
0
0
0
0
32.8
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
32.8
0
0
0
0
0
0
0
Total
35
1
0
0
0
0
12
0
12
0
5
0
4
0
5
0
38.8
0
0
0
6
0
6
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
123.8
1
53
1
70.8
0
Date: 22-02-06
DESCRIPTION
10/5/B
10/10/B
10/20/B
10/5/S
10/10/S
10/20/S
TOTAL
TOTAL
TARGET
PRODUCED
3
4
13
3
3
9
35
1
4
13
3
3
9
33
Actual CONSUMPTION
EXCESS USAGE
% AGE EXCESS USE
3.3
18.8
109.6
12.9
21.6
103.4
269.6
2.0
11.3
86.1
7.7
13.0
62.0
182.1
1138
306
183
87
36
8.32
13.49
0.48
REMARKS:
THE REMAINIG 8 PIPES OF THIS TUBWELL ARE MANUFACTURED BY USING HARDNER 2200.
KHURAM SHAHZAD
PRODUCTION ENGINEER
e: 22-02-06
WASTAGE
DECIDED
Date: 22-02-06
TOTAL
2
3
14
2
3
9
33
Actual CONSUMPTION
EXCESS USAGE
% AGE EXCESS USE
1
3
14
2
3
9
32
PIPE
MATERIAL CONSUMPTION +3% WASTAGE
THICKNESS
GLASS
EPOXY
HARDENER
0.20"
0.20"
0.20"
0.25"
0.25"
0.25"
12
53
490
32
80
385
1,052
3.0
12.6
118.1
7.7
19.3
92.6
253.4
1058
6
0.56
KHURAM SHAHZAD
PRODUCTION ENGINEER
2.3
9.9
92.8
6.0
15.2
72.8
199.1
265
193
12
(6)
4.60
-3.05
WASTAGE
DECIDED
Date: 22-02-06
TOTAL
2
3
14
2
3
9
33
Actual CONSUMPTION
EXCESS USAGE
% AGE EXCESS USE
1
3
14
2
3
9
32
PIPE
MATERIAL CONSUMPTION +3% WASTAGE
THICKNESS
GLASS
EPOXY
HARDENER
0.20"
0.20"
0.20"
0.25"
0.25"
0.25"
12
53
490
32
80
385
1,052
3.3
14.2
132.8
8.6
21.8
104.2
285.0
2.0
8.6
80.1
5.2
13.1
62.9
171.9
1100
265
179
48
(20)
4.55
-7.03
KHURAM SHAHZAD
PRODUCTION ENGINEER
4.12
WASTAGE
DECIDED
Date: 22-02-06
TOTAL
2
3
14
2
3
9
33
0
0
0
0
0
8
8
0.20"
0.20"
0.20"
0.25"
0.25"
0.25"
342
342
92.6
92.6
55.9
55.9
Actual CONSUMPTION
362
90
50
EXCESS USAGE
20
(3)
(6)
-2.85
-10.52
5.86
REMARKS: Some pipes are delivered back from site and remaining are manufactured
KHURAM SHAHZAD
PRODUCTION ENGINEER
% WASTAGE
ARDENER
DECIDED
Date: 22-02-06
TOTAL
2
3
14
2
3
9
33
Actual CONSUMPTION
EXCESS USAGE
% AGE EXCESS USE
0
1
9
0
0
9
19
PIPE
MATERIAL CONSUMPTION +3% WASTAGE
THICKNESS
GLASS
EPOXY
HARDENER
0.20"
0.20"
0.20"
0.25"
0.25"
0.25"
18
315
385
717
4.7
85.4
104.2
194.3
2.9
51.5
62.9
117.2
706
180
115
(11)
(14)
(2)
-1.59
-7.38
-1.90
REMARKS: Some pipes are delivered back from site and remaining are manufactured
KHURAM SHAHZAD
PRODUCTION ENGINEER
% WASTAGE
DECIDED
Date: 22-02-06
3
3
10
2
2
5
3
3
10
2
2
5
TOTAL
25
25
0.20"
0.20"
0.20"
0.22"
0.22"
0.22"
30
46
273
23
36
160
8
13
74
6
10
43
5
8
45
4
6
26
568
154
93
ACTUAL CONSUMPTION
588
160
101
EXCESS USAGE
20
3.48
3.94
KHURAM SHAHZAD
PRODUCTION ENGINEER
8.78
te: 22-02-06
Date: 22-02-06
TOTAL
0
2
21
0
2
8
33
Actual CONSUMPTION
EXCESS USAGE
% AGE EXCESS USE
0
2
21
0
2
8
33
PIPE
MATERIAL CONSUMPTION +3% WASTAGE
THICKNESS
GLASS
EPOXY
HARDENER
0.24"
0.24"
0.24"
0.24"
0.24"
0.24"
46
865
51
340
1,303
11.1
208.3
12.3
81.9
313.7
8.7
163.7
9.7
64.4
246.5
1373
290
222
70
(24)
(24)
5.38
-7.56
-9.94
KHURAM SHAHZAD
PRODUCTION ENGINEER
% WASTAGE
DECIDED
DATE: 23-02-06
SR. #
1
2
3
4
5
6
7
8
DESCRIPOTION
10-20-B 7/14
10-20-B 8/14
10-20-B 9/14
10-20-B 10/14
10-20-B 11/14
10-20-B 12/14
10-20-B 13/14
10-20-B 14/14
Total
8
Actual CONSUMPTION
EXCESS USAGE
% AGE EXCESS USE
PIPE
PIPE WT
THICKNESS
(kg)
0.25"
0.25"
0.25"
0.25"
0.25"
0.25"
0.25"
0.25"
GLASS
(kg)
MIX
(kg)
EPOXY
(kg)
HARDNER
(kg)
48.0
48.5
48.5
48.0
47.0
47.5
47.0
47.0
33.6
34.0
34.0
33.6
32.9
33.3
32.9
32.9
14.4
14.6
14.6
14.4
14.1
14.3
14.1
14.1
8.0
8.1
8.1
8.0
7.9
7.9
7.9
7.9
6.4
6.5
6.5
6.4
6.3
6.4
6.3
6.3
381.5
267.05
262
-5.05
-1.89
100.38
135
34.62
34.48
63.80
80
16.20
25.40
51.04
55
3.96
7.77
KHURAM SHAHZAD
PRODUCTION ENGINEER
DATE: 23-02-06
SR. #
DESCRIPOTION
1
10-20-S 1/9
2
10-20-S 2/9
3
10-20-S 3/9
4
10-20-S 4/9
5
10-20-S 5/9
6
10-20-S 6/9
7
10-20-S 7/9
8
10-20-S 8/9
9
10-20-S 9/9
10
10-10-S 1/3
11
10-10-S 2/3
12
10-10-S 3/3
13
10-05-S 1/2
14
10-05-S 2/2
15
10-05-B 1/2
16
10-05-B 2/2
17
10-10-B 1/3
18
10-10-B 2/3
19
10-10-B 3/3
20
10-20-B 1/14
21
10-20-B 2/14
22
10-20-B 3/14
23
10-20-B 4/14
24
10-20-B 5/14
25
10-20-B 6/14
26
10-20-B 7/14
27
10-20-B 8/14
28
10-20-B 9/14
29
10-20-B 10/14
30
10-20-B 11/14
31
10-20-B 12/14
32
10-20-B 13/14
33
10-20-B 14/14
Total
33
Actual CONSUMPTION
EXCESS USAGE
% AGE EXCESS USE
PIPE
THICKNESS
0.25"
0.25"
0.25"
0.25"
0.25"
0.25"
0.25"
0.25"
0.25"
0.25"
0.25"
0.25"
0.25"
0.25"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
PIPE WT
(kg)
63.2
60.6
59.4
59.0
58.8
58.8
58.8
59.0
61.1
38.0
37.2
36.6
23.0
22.0
17.0
17.5
25.0
26.0
25.0
50.0
49.0
49.0
48.0
49.0
47.0
48.0
48.5
48.5
48.0
47.0
47.5
47.0
47.0
1479.5
GLASS
(kg)
44.2
42.4
41.6
41.3
41.2
41.2
41.2
41.3
42.8
26.6
26.0
25.6
16.1
15.4
11.9
12.3
17.5
18.2
17.5
35.0
34.3
34.3
33.6
34.3
32.9
33.6
34.0
34.0
33.6
32.9
33.3
32.9
32.9
1035.65
1058
22.35
2.16
MIX
(kg)
19.0
18.2
17.9
17.8
17.7
17.7
17.7
17.8
18.4
11.4
11.2
11.0
6.9
6.6
5.1
5.3
7.5
7.8
7.5
15.1
14.7
14.7
14.4
14.7
14.1
14.4
14.6
14.6
14.4
14.1
14.3
14.1
14.1
445.33
458
12.67
2.85
EPOXY
(kg)
11.5
11.1
10.8
10.8
10.7
10.7
10.7
10.8
10.2
6.4
6.2
6.1
3.8
3.7
2.8
2.9
4.2
4.3
4.2
8.4
8.2
8.2
8.0
8.2
7.9
8.0
8.1
8.1
8.0
7.9
7.9
7.9
7.9
254.67
265
10.33
4.06
KHURAM SHAHZAD
HARDNER
(kg)
7.5
7.2
7.0
7.0
7.0
7.0
7.0
7.0
8.2
5.1
5.0
4.9
3.1
2.9
2.3
2.3
3.3
3.5
3.3
6.7
6.6
6.6
6.4
6.6
6.3
6.4
6.5
6.5
6.4
6.3
6.4
6.3
6.3
190.66
193
2.34
1.23
PRODUCTION ENGINEER
Average Values
WT
Glass
59
41.5
37
26
22
15.5
17
12
25
17.5
48
34
DATE: 23-02-06
SR. #
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
DESCRIPOTION
10-20-S 1/9
10-20-S 2/9
10-20-S 3/9
10-20-S 4/9
10-20-S 5/9
10-20-S 6/9
10-20-S 7/9
10-20-S 8/9
10-20-S 9/9
10-10-S 1/3
10-10-S 2/3
10-10-S 3/3
10-05-S 1/2
10-05-S 2/2
10-05-B 1/2
10-05-B 2/2
10-10-B 1/2
10-10-B 2/2
10-10-BP 1/1
10-20-B 1/14
10-20-B 2/14
10-20-B 3/14
10-20-B 4/14
10-20-B 5/14
10-20-B 6/14
10-20-B 7/14
10-20-B 8/14
10-20-B 9/14
10-20-B 10/14
10-20-B 11/14
10-20-B 12/14
10-20-B 13/14
10-20-B 14/14
Total
33
Actual CONSUMPTION
EXCESS USAGE
% AGE EXCESS USE
PIPE
PIPE WT
THICKNESS
(kg)
0.25"
0.25"
0.25"
0.25"
0.25"
0.25"
0.25"
0.25"
0.25"
0.25"
0.25"
0.25"
0.25"
0.25"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
GLASS
(kg)
MIX
(kg)
EPOXY
(kg)
HARDNER
(kg)
61.5
59.5
60.0
62.0
62.0
63.0
62.0
62.0
61.0
35.0
35.0
35.5
21.0
22.0
18.5
18.5
29.0
28.8
24.0
48.5
49.5
49.0
48.0
48.5
48.0
47.0
47.0
47.5
48.2
48.0
48.5
49.0
47.0
43.1
41.7
42.0
43.4
43.4
44.1
43.4
43.4
42.7
24.5
24.5
24.9
14.7
15.4
13.0
13.0
20.3
20.2
16.8
34.0
34.7
34.3
33.6
34.0
33.6
32.9
32.9
33.3
33.7
33.6
34.0
34.3
32.9
18.5
17.9
18.1
18.7
18.7
19.0
18.7
18.7
18.4
10.5
10.5
10.7
6.3
6.6
5.6
5.6
8.7
8.7
7.2
14.6
14.9
14.7
14.4
14.6
14.4
14.1
14.1
14.3
14.5
14.4
14.6
14.7
14.1
10.3
9.9
10.0
10.4
11.7
11.9
11.7
11.7
11.5
6.6
6.6
6.7
4.0
4.1
3.5
3.5
5.5
5.4
4.5
9.1
9.3
9.2
9.0
9.1
9.0
8.8
8.8
8.9
9.1
9.0
9.1
9.2
8.8
8.2
8.0
8.0
8.3
7.0
7.1
7.0
7.0
6.9
4.0
4.0
4.0
2.4
2.5
2.1
2.1
3.3
3.3
2.7
5.5
5.6
5.5
5.4
5.5
5.4
5.3
5.3
5.4
5.4
5.4
5.5
5.5
5.3
1494.00
1045.80
1100
54.20
5.18
449.69
444
-5.69
-1.27
275.98
265
-10.98
-3.98
173.71
179
5.29
3.04
KHURAM SHAHZAD
PRODUCTION ENGINEER
Average Values
WT
Glass
61.4
43.0
35
24.6
21
14.5
18.5
13
28.5
20
48
DATE: 23-02-06
SR. #
DESCRIPOTION
1
2
3
4
5
6
7
8
10-20-S 1/9
10-20-S 2/9
10-20-S 3/9
10-20-S 4/9
10-20-S 5/9
10-20-S 6/9
10-20-S 7/9
10-20-S 8/9
PIPE
PIPE WT
THICKNESS
(kg)
0.25"
0.25"
0.25"
0.25"
0.25"
0.25"
0.25"
0.25"
61.0
60.0
64.0
63.0
62.5
61.5
61.0
61.0
GLASS
(kg)
42.7
42.0
44.8
44.1
43.8
43.1
42.7
42.7
MIX
(kg)
18.4
18.1
19.3
19.0
18.8
18.5
18.4
18.4
EPOXY
(kg)
HARDNER
(kg)
10.2
10.0
10.7
10.5
11.8
11.6
11.5
11.5
8.2
8.0
8.6
8.4
7.1
6.9
6.9
6.9
Total
8
494.0
345.80
148.69
87.75
Actual CONSUMPTION
362
140
90
EXCESS USAGE
16.20
-8.69
2.25
% AGE EXCESS USE
4.68
-5.85
2.56
REMARKS: Some pipes are delivered back from site and remaining are manufactured.
60.94
50
-10.94
-17.96
KHURAM SHAHZAD
PRODUCTION ENGINEER
DATE: 23-02-06
SR. #
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
DESCRIPOTION
10-20-S 1/9
10-20-S 2/9
10-20-S 3/9
10-20-S 4/9
10-20-S 5/9
10-20-S 6/9
10-20-S 7/9
10-20-S 8/9
10-20-S 9/9
10-10-BP 1/1
10-20-B 6/14
10-20-B 7/14
10-20-B 8/14
10-20-B 9/14
10-20-B 10/14
10-20-B 11/14
10-20-B 12/14
10-20-B 13/14
10-20-B 14/14
PIPE
PIPE WT
THICKNESS
(kg)
0.25"
0.25"
0.25"
0.25"
0.25"
0.25"
0.25"
0.25"
0.25"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
62.0
61.0
60.0
60.0
60.0
61.0
61.0
62.0
59.0
24.0
47.0
47.0
47.5
47.5
48.2
48.0
48.5
49.0
47.0
GLASS
(kg)
43.4
42.7
42.0
42.0
42.0
42.7
42.7
43.4
41.3
16.8
32.9
32.9
33.3
33.3
33.7
33.6
34.0
34.3
32.9
MIX
(kg)
18.7
18.4
18.1
18.1
18.1
18.4
18.4
18.7
17.8
7.2
14.1
14.1
14.3
14.3
14.5
14.4
14.6
14.7
14.1
EPOXY
(kg)
HARDNER
(kg)
10.4
10.2
10.0
10.0
11.3
11.5
11.5
11.7
11.1
4.5
8.8
8.8
8.9
8.9
9.1
9.0
9.1
9.2
8.8
8.3
8.2
8.0
8.0
6.8
6.9
6.9
7.0
6.7
2.7
5.3
5.3
5.4
5.4
5.4
5.4
5.5
5.5
5.3
Total
19
999.70
699.79
300.91
182.99
Actual CONSUMPTION
706
295
180
EXCESS USAGE
6.21
-5.91
-2.99
% AGE EXCESS USE
0.89
-1.96
-1.63
REMARKS: Some pipes are delivered back from site and remaining are manufactured.
117.92
115
-2.92
-2.48
KHURAM SHAHZAD
PRODUCTION ENGINEER
DATE: 23-02-06
DESCRIPOTION
8-20-S 1/5
8-20-S 2/5
8-20-S 3/5
8-20-S 4/5
8-20-S 5/5
8-10-S 1/2
8-10-S 2/2
8-05-S 1/2
8-05-S 2/2
8-20-B 1/10
8-20-B 2/10
8-20-B 3/10
8-20-B 4/10
8-20-B 5/10
8-20-B 6/10
8-20-B 7/10
8-20-B 8/10
8-20-B 9/10
8-20-B 10/10
8-10-B 1/3
8-10-B 2/3
8-10-B 3/3
8-10-BP 1/1
8-05-B 1/4
8-05-B 2/4
8-05-B 3/4
8-05-B 4/4
Total
27
Actual CONSUMPTION
EXCESS USAGE
% AGE EXCESS USE
PIPE
PIPE WT
THICKNESS
(kg)
0.22"
0.22"
0.22"
0.22"
0.22"
0.22"
0.22"
0.22"
0.22"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
GLASS
(kg)
MIX
(kg)
EPOXY
(kg)
HARDNER
(kg)
44.0
45.0
44.0
44.5
44.0
26.0
25.5
16.0
16.5
36.5
37.0
37.0
38.0
37.0
37.5
38.0
38.5
39.0
39.0
22.5
23.3
23.5
20.5
14.5
14.0
13.5
14.0
30.8
31.5
30.8
31.2
30.8
18.2
17.9
11.2
11.6
25.6
25.9
25.9
26.6
25.9
26.3
26.6
27.0
27.3
27.3
15.8
16.3
16.5
14.4
10.2
9.8
9.5
9.8
13.2
13.5
13.2
13.4
13.2
7.8
7.7
4.8
5.0
11.0
11.1
11.1
11.4
11.1
11.3
11.4
11.6
11.7
11.7
6.8
7.0
7.1
6.2
4.4
4.2
4.1
4.2
8.3
8.5
8.3
8.4
8.3
4.9
4.8
3.0
3.1
6.9
7.0
7.0
7.1
7.0
7.1
7.1
7.2
7.3
7.3
4.2
4.4
4.4
3.9
2.7
2.6
2.5
2.6
5.0
5.1
5.0
5.0
5.0
2.9
2.9
1.8
1.9
4.1
4.2
4.2
4.3
4.2
4.2
4.3
4.3
4.4
4.4
2.5
2.6
2.7
2.3
1.6
1.6
1.5
1.6
828.80
580.16
588
7.84
1.35
249.47
261
11.53
4.62
155.92
160
4.08
2.62
93.55
101
7.45
7.96
KHURAM SHAHZAD
PRODUCTION ENGINEER
Average Values
WT
Glass
13.3
8.3
7.8
4.8
4.9
3.1
11.4
7.1
7.0
4.3
4.2
2.6
DATE: 23-02-06
DESCRIPOTION
8-20-S 1/5
8-20-S 2/5
8-20-S 3/5
8-20-S 4/5
8-20-S 5/5
8-10-S 1/2
8-10-S 2/2
8-05-S 1/2
8-05-S 2/2
8-20-B 1/10
8-20-B 2/10
8-20-B 3/10
8-20-B 4/10
8-20-B 5/10
8-20-B 6/10
8-20-B 7/10
8-20-B 8/10
8-20-B 9/10
8-20-B 10/10
8-10-B 1/3
8-10-B 2/3
8-10-B 3/3
8-10-BP 1/1
8-05-B 1/4
8-05-B 2/4
8-05-B 3/4
8-05-B 4/4
Total
27
Actual CONSUMPTION
EXCESS USAGE
% AGE EXCESS USE
PIPE
PIPE WT
THICKNESS
(kg)
0.22"
0.22"
0.22"
0.22"
0.22"
0.22"
0.22"
0.22"
0.22"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
0.20"
26.0
26.0
20.0
72.00
GLASS
(kg)
MIX
(kg)
EPOXY
(kg)
HARDNER
(kg)
0.0
0.0
0.0
0.0
0.0
18.2
18.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
14.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
7.8
7.8
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
6.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
4.9
4.9
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
3.8
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
2.9
2.9
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
2.3
0.0
0.0
0.0
0.0
50.40
0
-50.40
-100.00
21.67
0
-21.67
-100.00
13.55
0
-13.55
-100.00
8.13
0
-8.13
-100.00
KHURAM SHAHZAD
PRODUCTION ENGINEER
Average Values
WT
Glass
0.0
0.0
7.8
4.9
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
DATE: 23-02-06
SR. #
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
DESCRIPOTION
10-20-S 1/8
10-20-S 2/8
10-20-S 3/8
10-20-S 4/8
10-20-S 5/8
10-20-S 6/8
10-20-S 7/8
10-20-S 8/8
10-10-S 1/2
10-10-S 2/2
10-20-B 1/21
10-20-B 2/21
10-20-B 3/21
10-20-B 4/21
10-20-B 5/21
10-20-B 6/21
10-20-B 7/21
10-20-B 8/21
10-20-B 9/21
10-20-B 10/21
10-20-B 11/21
10-20-B 12/21
10-20-B 13/21
10-20-B 14/21
10-20-B 15/21
10-20-B 16/21
10-20-B 17/21
10-20-B 18/21
10-20-B 19/21
10-20-B 20/21
10-20-B 21/21
10-10-B 1/2
10-10-B 2/2
TOTAL
33
Actual CONSUMPTION
EXCESS USAGE
% AGE EXCESS USE
PIPE
PIPE WT
THICKNESS
(kg)
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
63.5
62.5
63.5
63.0
61.0
60.0
60.5
63.0
36.0
35.0
58.0
57.0
58.0
58.0
57.0
57.0
57.0
59.0
57.5
58.5
58.5
58.5
59.0
58.0
58.0
57.0
58.0
57.0
56.0
55.5
57.0
33.0
34.0
GLASS
(kg)
MIX
(kg)
EPOXY
(kg)
HARDNER
(kg)
44.5
43.8
44.5
44.1
42.7
42.0
42.4
44.1
25.2
24.5
40.6
39.9
40.6
40.6
39.9
39.9
39.9
41.3
40.3
41.0
41.0
41.0
41.3
40.6
40.6
39.9
40.6
39.9
39.2
38.9
39.9
23.1
23.8
19.1
18.8
19.1
19.0
18.4
18.1
18.2
19.0
10.8
10.5
17.5
17.2
17.5
17.5
17.2
17.2
17.2
17.8
17.3
17.6
17.6
17.6
17.8
17.5
17.5
17.2
17.5
17.2
16.9
16.7
17.2
9.9
10.2
10.6
10.5
10.6
10.5
10.2
10.0
10.1
10.5
6.0
5.9
9.7
9.5
9.7
9.7
9.5
9.5
9.5
9.9
9.6
9.8
9.8
9.8
9.9
9.7
9.7
9.5
9.7
9.5
9.4
9.3
9.5
5.5
5.7
8.5
8.4
8.5
8.4
8.2
8.0
8.1
8.4
4.8
4.7
7.8
7.6
7.8
7.8
7.6
7.6
7.6
7.9
7.7
7.8
7.8
7.8
7.9
7.8
7.8
7.6
7.8
7.6
7.5
7.4
7.6
4.4
4.5
1291.15
1373
81.85
6.34
555.19
512
-43.19
-7.78
308.44
290
-18.44
-5.98
246.75
222
-24.75
-10.03
403
257
1405
KHURAM SHAHZAD
PRODUCTION ENGINEER
Average values
WT
Glass
62
43.5
35.5
25
57.6
40
33
23.5
DATE: 23-02-06
SR. #
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
DESCRIPOTION
10-20-S 1/8
10-20-S 2/8
10-20-S 3/8
10-20-S 4/8
10-20-S 5/8
10-20-S 6/8
10-20-S 7/8
10-20-S 8/8
10-10-S 1/2
10-10-S 2/2
10-20-B 1/21
10-20-B 2/21
10-20-B 3/21
10-20-B 4/21
10-20-B 5/21
10-20-B 6/21
10-20-B 7/21
10-20-B 8/21
10-20-B 9/21
10-20-B 10/21
10-20-B 11/21
10-20-B 12/21
10-20-B 13/21
10-20-B 14/21
10-20-B 15/21
10-20-B 16/21
10-20-B 17/21
10-20-B 18/21
10-20-B 19/21
10-20-B 20/21
10-20-B 21/21
10-10-B 1/2
10-10-B 2/2
TOTAL
33
Actual CONSUMPTION
EXCESS USAGE
% AGE EXCESS USE
PIPE
PIPE WT
THICKNESS
(kg)
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
0.236"
62.5
59.5
59.0
60.0
61.5
62.0
62.0
61.5
35.5
35.2
55.0
57.0
58.5
58.0
60.0
57.5
57.5
57.5
58.0
57.0
57.5
57.5
58.5
56.5
56.0
55.5
56.0
57.0
56.0
55.5
57.0
33.5
31.5
GLASS
(kg)
MIX
(kg)
EPOXY
(kg)
HARDNER
(kg)
43.8
41.7
41.3
42.0
43.1
43.4
43.4
43.1
24.9
24.6
38.5
39.9
41.0
40.6
42.0
40.3
40.3
40.3
40.6
39.9
40.3
40.3
41.0
39.6
39.2
38.9
39.2
39.9
39.2
38.9
39.9
23.5
22.1
18.8
17.9
17.8
18.1
18.5
18.7
18.7
18.5
10.7
10.6
16.6
17.2
17.6
17.5
18.1
17.3
17.3
17.3
17.5
17.2
17.3
17.3
17.6
17.0
16.9
16.7
16.9
17.2
16.9
16.7
17.2
10.1
9.5
10.5
9.9
9.9
10.0
10.3
10.4
10.4
10.3
5.9
5.9
9.2
9.5
9.8
9.7
10.0
9.6
9.6
9.6
9.7
9.5
9.6
9.6
9.8
9.4
9.4
9.3
9.4
9.5
9.4
9.3
9.5
5.6
5.3
8.4
8.0
7.9
8.0
8.2
8.3
8.3
8.2
4.7
4.7
7.4
7.6
7.8
7.8
8.0
7.7
7.7
7.7
7.8
7.6
7.7
7.7
7.8
7.6
7.5
7.4
7.5
7.6
7.5
7.4
7.6
4.5
4.2
1275.89
0
-1275.89
-100.00
548.63
0
-548.63
-100.00
304.80
0
-304.80
-100.00
243.84
0
-243.84
-100.00
KHURAM SHAHZAD
PRODUCTION ENGINEER
Average values
WT
Glass
61
42.7
35.5
25
57.1
40
33
22.8
OYSTER
OUR STRENGTHS ARE LEGENDARY
Registered Office
85-Y, St # 18, Phase III, D.H.A.
Lahore- 54792, Pakistan.
Corporate Office
66-L, Gulberg III, Lahore.
Date: 23-02-06
MTERIAL CONSUMPTION REPORT
NO. OF TUBEWELLS = 7 FROM 25-01-06 TO 17-02-06
DESCRIPTION TOTAL PRODUCED PIPE MATERIAL CONSUMPTION +3% WASTAGE
TARGET
THICKNESS
GLASS
EPOXY
HARDENER
8/5/B
8/10/B
8/20/B
8/5/S
8/10/S
8/20/S
10/5/B
10/10/B
10/20/B
10/5/S
10/10/S
10/20/S
10/10/B
10/20/B
10/10/S
10/20/S
4
4
10
2
2
5
4
7
45
4
6
35
2
21
2
8
4
4
10
2
2
5
4
7
45
4
6
35
2
21
2
8
0.20"
0.20"
0.20"
0.22"
0.22"
0.22"
0.20"
0.20"
0.20"
0.25"
0.25"
0.25"
0.24"
0.24"
0.24"
0.24"
40
62
273
23
36
160
25
123
1,751
64
161
1,496
35
735
54
342
11
17
74
6
10
43
6
32
446
16
41
394
8
177
13
82
TOTAL
161
161
5,379
1,377
Actual CONSUMPTION
5024
1332
EXCESS USAGE
-354.56
-44.58
% AGE EXCESS USE
-6.59%
-3.24%
REMARKS:
TWO WASA (10") TUBEWELLS AND ONE GEO RESEARCH (10") TUBEWELL ARE
MANUFACTURED WITH 100:80 RATIO OF EPOXY RESIN AND HARDNER & THE
REMANINIG PRODUCTION HAS BEEN DONE WITH THE RATIO OF 100:60
KHURAM SHAHZAD
PRODUCTION ENGINEER
7
10
45
4
6
26
4
21
311
11
28
254
7
139
10
65
948
915
-32.83
-3.46%
.) LTD
DATE:03-04-06
THICKNESSNO. OF
DESC INCHES PIPES
8/5/B
8/10/B
8/20/B
8/5/S
8/10/S
8/20/S
10/5/B
10/10/B
10/20/B
10/5/S
10/10/S
10/20/S
10/10/B
10/20/B
10/10/S
10/20/S
TOTAL
0.20
0.20
0.20
0.22
0.22
0.22
0.20
0.20
0.20
0.25
0.25
0.25
0.24
0.24
0.24
0.24
PER
PIPE
GLASS
KG
PER
PIPE
MIX
KG
PER
PER
PER
PIPE
PIPE
PIPE
EPOXY HRDNER WEIGHT
KG
KG
KG
0.43
0.63
0.38
0
0
0
0
0
0
7
11
46
8
10
1
0
0
0
0
0.0
0.0
0.0
0.0
0.0
0.0
84.0
187.0
1564.0
124.0
260.0
41.5
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
36
80
672.5
53.3
111.8
17.8
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
22.8
50.7
423.7
33.6
70.4
11.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
13.73
30.56
255.56
20.3
42.5
6.8
0.0
0.0
0.0
0.0
83
2261
972
612
369
0.0
0.0
0.0
0.0
0.0
0.0
120.1
267.4
2236.5
177.3
371.8
59.3
0.0
0.0
0.0
0.0
3233
FLOOR
STORE
TOTAL
BALANCE
SHAHZAD BHATTI
PRODUCTION MANAGER
GLASS EPOXY HARDNER
1139
215
255
2922
440
660
4061
655
915
1801
43
546
DATE:23-05-07
DESC
8/5/B
8/10/B
8/20/B
8/5/S
8/10/S
8/20/S
10/5/B
10/10/B
10/20/B
10/5/S
10/10/S
10/20/S
10/10/B
10/20/B
10/10/S
10/20/S
THICKNESS
INCHES
0.20
0.20
0.20
0.22
0.22
0.22
0.20
0.20
0.20
0.25
0.25
0.25
0.24
0.24
0.24
0.24
TOTAL
NO. OF
PIPES
PER
PIPE
GLASS
KG
PER
PIPE
MIX
KG
PER
PIPE
EPOXY
KG
PER
PIPE
HRDNER
KG
0.43
0.63
0.38
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
9.7
15.0
26.5
11.3
17.5
31.0
12.0
17.0
34.0
15.5
26.0
41.5
22.4
40.0
24.9
41.3
4.2
6.5
11.4
4.9
7.5
13.3
5
7
14.6
6.7
11.2
17.8
9.6
17.2
10.7
17.8
2.6
4.1
7.2
3.1
4.7
8.4
3.3
4.6
9.2
4.2
7.0
11.2
6.1
10.8
6.7
11.2
1.6
2.5
4.3
1.8
2.9
5.1
1.96
2.78
5.56
2.5
4.2
6.8
3.7
6.5
4.1
6.7
16
386
166
104
63
PER
PIPE
WEIGHT
KG
13.9
21.5
37.9
16.2
25.0
44.3
17.2
24.3
48.6
22.2
37.2
59.3
32.0
57.2
35.5
59.1
551
FLOOR
STORE
TOTAL
BALANCE
21/03/06
ACTUAL BAL.
%WASTAGE
SHAHZAD BHATTI
PRODUCTION MANAGER
GLASS EPOXY HARDNER
1093
265
295
7394
1540
1320
8487
1805
1615
8101
1701
1552
5056
1108
1063
37.591 34.8448 31.50778
6.593888889
DATE:23-02-06
DESC
THICKNESS
INCHES
8/5/B
8/10/B
8/20/B
8/5/S
8/10/S
8/20/S
10/5/B
10/10/B
10/20/B
10/5/S
10/10/S
10/20/S
10/10/B
10/20/B
10/10/S
10/20/S
0.20
0.20
0.20
0.22
0.22
0.22
0.20
0.20
0.20
0.25
0.25
0.25
0.24
0.24
0.24
0.24
TOTAL
NO. OF
PIPES
PER
PIPE
GLASS
KG
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
9.7
15.0
26.5
11.3
17.5
31.0
12.0
17.0
34.0
15.5
26.0
41.5
22.4
40.0
24.9
41.3
16
386
PER
PIPE
MIX
KG
PER
PIPE
EPOXY
KG
PER
PIPE
HRDNER
KG
0.43
0.56
0.44
4.2
6.5
11.4
4.9
7.5
13.3
5
7
14.6
6.7
11.2
17.8
9.6
17.2
10.7
17.8
2.3
3.6
6.4
2.7
4.2
7.5
2.9
4.1
8.2
3.7
6.3
10.0
5.4
9.6
6.0
9.9
1.8
2.8
5.0
2.1
3.3
5.9
2.3
3.2
6.4
2.9
4.9
7.9
4.2
7.6
4.7
7.8
166
93
PER
PIPE
WEIGHT
KG
73
KHURAM SHAHZAD
PRODUCTION ENGINEER
13.9
21.5
37.9
16.2
25.0
44.3
17.2
24.3
48.6
22.2
37.2
59.3
32.0
57.2
35.5
59.1
PER
PIPE
EPOXY
RATIO
0.56
0.6
PER
PIPE
HRDNER
RATIO
0.44
0.4
PER
PER
PIPE
PIPE
MIX/GLASS GLASS/T.WT
RATIO
RATIO
0.43
0.43
0.43
0.43
0.43
0.43
0.43
0.43
0.43
0.43
0.43
0.43
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70