Professional Documents
Culture Documents
Deisel Genertor Operation.
Deisel Genertor Operation.
Deisel Genertor Operation.
Note:
1. Do not operate any breaker with out prior information to control room
2. Ensure all relays are in reset condition
3. Ensure circuit breaker switch selected to remote.
Open 1N/2N (if not open /1N can be opened from C.Room)
Close 1E/2E (if not closed / 1E can be closed from C.Room)
Start DG in run mode for manual operation (DG-1 can be started from C.Room.)
Close1D/2D. (1D will close in AUTO if DG-1 is started from C.Room)