JINDAL THERMAL POWER CO. LTD.

ISLANDING NORMALISATION CHECK LIST

UNIT:
Reason for islanding:

DATE:

Rec. No:

OP/ F/ 14/ 01

Date:

16/12/2004

Page:

1 of 1

Check List No:

..

SHIFT:
Islanding time:
Synchronization time:

SNO
1
2
3
4
5
6
7
8
9
10

DESCRIPTION

CHECK

TIME/
REMARK

Reset Islanding relay at MSDS and check that Island detected alarm at ECP is reset.
Caution: Do not bypass islanding without resetting the relay at MSDS
Reset Group A & B trip relay at Bus coupler relay panel.
Match speed reference D/L setpoint with that of NRTD (PV of speed reference D/L
block) of the machine.
Synchronize the machine with buscoupler by using speed reference D/L block from
SPECP.
Check actual load on the machine after synchronization
If the load is less than 45 MW, increase the load with speed reference D/L block to
more than 45MW, else go to next step.
Set the load reference using load reference D/L block such that the sum of load ref
values matches the actual load.
Reset the ISOLATED GRID at EHTC-2 graphic and check it has resetted in the
faceplate.
Change over turbine control from SPEED to LOAD at EHTC-2 graphic
Check turbine control has changed over to LOAD control in EHTC-1 graphic

11 Put back HPBP setpoint selector in AUTO and ensure AUTO mode of HPLP bypass
12 Load the machine to 130MW
13 Ensure Islanding bypass switch is ON (if made OFF, make it ON as per requirement.)
Control room shift operator

1 Signature .
2 Signature .

For major / critical activities, starting & ending times may be mentioned.
The Shift - in - charge engineer shall verify atleast 05 important / critical steps, at random.

Approved by:

CONTROL STATUS

Issued & Controlled by:

**R R Pillai

**Anoop Vaish

HOD - OPERATION

OPERATION SUPPORT
ENGINEER

**This document is computer generated hence dose not require signature.