Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

+2.

591

+2.591

+ 2.53

+ 2.53

0.00

0.00

-0.30

+2.591

+2.591

+ 2.53

+ 2.53

0.00

0.00

-0.30

-0.30

RIGHT SIDE ELEVATION


SC. 1/100
PLAN
SC. 1:100
4.00
1.00
1.20

6.00

BACK ELEVATION
SC. 1:100
+2.591

3.00
60
60

2.00

80
2.00

70
2.00

+ 2.53

Association
manager

70
2.00

70
2.00

shower

WC

VIEW A -0.30
SC. 1:100

2.00

Meeting
room

0.00

4.00

1.00
1.20

TV
1.00
1.20

FRONT ELEVATION
SC. 1:100

-0.30

LEFT SIDE ELEVATION


SC. 1:100

80
2.00

A
4.00

secretary

80

4.00
70
2.00

60
120

2.00

60
120

80
2.00

1.00
1.20

60
60

60
120

80
2.00

service
room

60
60

60
60

shower

WC

70
2.00

70
2.00

4.00

Association
deputy manager

2.00

80
2.00

1.00
1.20

HIDROCONSTRUCTIA - ZOZIK

2.00

Designed by:
70
2.00

12.00

1.00
1.20

60
60

1.00
1.20
4.00

1.00
1.20
6.00

Scale:

HIDROCONSTRUCTIA - ZOZIK
60
60
3.00

General Directorate of Dams and


Reservoirs Iraqi Kurdistan Region
CONSRUCTION OF
BAWANUR DAM IN GARMIAN

C308/2013

1:100
Drawing title:

SITE CONTRACTOR

1 JOINT VENTURE OFFICE MANAGERS

Approved by:

CREA Hydro & Energy


GDDR

Pr. No.

November 2013
420x297

Drawing No.

C308/2013

A6

You might also like