TERMITE PROOFING

TERMITE PROOFING (TRENCHES)


HEPTACHLORE
Lean Concrete (1:4:8) Ravi Sand & B.Ballast
Lean Concrete (1:4:8) Ravi Sand & B.Ballast

CEMENT OPC
SAND RAVI
BRICK BALLAST
Lean Concrete (1:2:4) Ravi Sand & B.Ballast

CEMENT OPC
SAND RAVI
BRICK BALLAST
Damp proof Course.
2" Horizontal D.P.C. (1:2:4)

CEMENT OPC
SAND RAVI
AGGREGATE

BITUMEN
KEROSENE OIL
Polythene Sheet
VERTICAL D.P.C

CEMENT OPC
SAND RAVI
BITUMEN
KEROSENE OIL

WASTE WOOD
BRICK WORK IN SUB STRUCTURE ( G.Floor )
13 1/2" thick (1:6)

CEMENT OPC
SAND RAVI
BRICKS IST CLASS
R.C.C (1:2:4) using chenab sand crush.
Footing

CEMENT OPC
SAND CHENAB
AGGREGATE
Steel

Masonary up to slab level ( G.Floor )


BRICK WORK IN SUPER STRUCTURE
9" & 13 1/2" thick (1:6) (G.F)

SFT
LTS

976.20
7.81

CFT
BAGS
CFT
CFT

100.00
9.48
47.38
94.77

CFT
BAGS
CFT
CFT

100.00
17.60
44.00
88.00

SFT
BAGS
CFT
CFT
KG
LTRS

100.00
2.94
7.35
14.70
20.42
15.00
1.13

SFT
BAGS
CFT
KG
LTRS
Kgs

100.00
1.56
5.86
20.42
15.00
20.42

CFT
BAGS
CFT
THOU

100.00
3.43
25.71
1.35

CFT
BAGS
CFT
CFT
Kg

100.00
17.60
44.00
88.00
272.23

15%
CFT

100.00

CEMENT OPC
SAND RAVI
BRICKS IST CLASS

BAGS
CFT
THOU

4.00
25.00
1.35