Shah Rasool Colony DPMT LHS 250KVA
Shah Rasool Colony DPMT LHS 250KVA
Shah Rasool Colony DPMT LHS 250KVA
Form - 3
02
Document No.
Version
July 9, 2013
Date of
Version
Page 1 of 2
TPRE
Issuing
Department
Page
Shah
S.
N
o
1
2
3
4
Checked
Particulars
Yes
Connection of LT breaker to
DB
Earth testing of PMT (should
be tested within one week
after replacement & less
than 1) Post Energization
Provision of HRC fuses on all
three phases
Last loading recorded on all
three
phases
Pre
Energization
Insert LT fuses
normalize supply
one
to
No
Remarks
Status
Satisfactor Unsatisfactor
y
y
Checked
279-260-248
Status
Satisfac Unsatisfac
tory
tory
Remarks
Yes
No
260-245-236
Note: Removal of over loading / load balancing is mandatory within one week after
replacement of PMT / Local Transformer
Checked and Reviewed by:
Designation
AM (LT N/W)
MGR / DGM (LT N/W)
Name
Signature
Date
Note:
Form - 3
02
Document No.
Version
July 9, 2013
Date of
Version
Page 2 of 2
Page
TPRE
Issuing
Department
Dully filled Performa are to be handed over to RI & User Department with
damaged transformer & copy is to be kept with user for reference & record