Re-Furbished New DT's Pre-Energiztion Check Form
Re-Furbished New DT's Pre-Energiztion Check Form
Form - 3
02
Document No.
Version
July 9, 2013
Date of
Version
Page 1 of 2
TPRE
Issuing
Department
Page
S.
N
o
1
2
3
4
Checked
Particulars
Connection of LT breaker to
DB
Earth testing of PMT (should
be tested within one week
after replacement & less
than 1) Post Energization
Provision of HRC fuses on all
three phases
Last loading recorded on all
three
phases
Post
Energization
Yes
No
Remarks
Status
Satisfactor Unsatisfactor
y
y
246-304-331
on 26/08/2014
Checked
Status
Satisfac Unsatisfac
tory
tory
Remarks
Yes
No
Note: Removal of over loading / load balancing is mandatory within one week after
replacement of PMT / Local Transformer
Checked and Reviewed by:
Designation
AM (LT N/W)
Name
Signature
Date
02
Document No.
Version
July 9, 2013
Date of
Version
Page 2 of 2
Page
TPRE
Issuing
Department
Dully filled Performa are to be handed over to RI & User Department with
damaged transformer & copy is to be kept with user for reference & record