Re-Furbished / New DTs PreEnergization Check form

Form - 3

02

Document No.

Version

July 9, 2013
Date of
Version

Page 1 of 2

TPRE
Issuing
Department

Page

Checks for Electrical Connection IBC


NGB Flats S/S, 500KVA

S.
N
o
1
2
3
4

Checked
Particulars

Yes

Connection of LT breaker to
DB
Earth testing of PMT (should
be tested within one week
after replacement & less
than 1) Post Energization
Provision of HRC fuses on all
three phases
Last loading recorded on all
three
phases

Pre
Energization

Pre energization checks (IBC):


S.
N
Task
o
Ensure LT breaker is in OFF
1
position
Ensure LT fuses from LT
2 DBs / LT Panels are taken
out from base
Ensure neutral leads from
3 PMT to LT O/H connect
directly/ LT Panels
If PMT switched ON at no
4 load then keep it ON for at
least 01 hour
Switch ON LT breaker &
5 check supply at load side
terminal on all three phases
Switched OFF PMT after
one hour, in case every
6 thing is normal, switched it
OFF replace the HT fuses
with rated capacity
7

Insert LT fuses
normalize supply

one

to

Fresh loading of trafo on


load after 01 hour

No

Remarks

Status
Satisfactor Unsatisfactor
y
y

245-248-287
on 15/08/2014

Checked

Status
Satisfac Unsatisfac
tory
tory

Remarks

Yes

No

246-304-331
on 26/08/2014

Note: Removal of over loading / load balancing is mandatory within one week after
replacement of PMT / Local Transformer
Checked and Reviewed by:
Designation
AM (LT N/W)
MGR / DGM (LT N/W)

Name

Signature

Date

Re-Furbished / New DTs PreEnergization Check form

Note:

Form - 3

02

Document No.

Version

July 9, 2013
Date of
Version

Page 2 of 2
Page

TPRE
Issuing
Department

Dully filled Performa are to be handed over to RI & User Department with
damaged transformer & copy is to be kept with user for reference & record