Procedure - F-1003 Burner Light-Up
Procedure - F-1003 Burner Light-Up
AMMONIA PLANT
Rev.
01
Reviewed by: IA
Page:
1 of 1
Date: 25-07-2003
If wind direction is from South West to North East. Open air dampers of
burners B 2 to 3 steps and burners A/C 3 to 4 steps. After purge is complete
close stack damper from CCR to 40% open.
-
If out put is yet not stable reduce opening of stack damper further by 2%.
-
Get out put of scanner 15~18 mV by increasing / decreasing opening of main burner I/V.
When burners out put is stable and ~15~18 mv, start 2nd burner and maintain pressure at
PV-1026.2~1.5 Kg/cm2. Stabilize the burner flame in the same way as did in case of 1st
burner. Dont forget to shift scanner out put meter to 2nd burner scanner.
When both burners are stable, flow to FG header should be about 75~85 NMC/hrs (This
will give an idea of I/V pinching).
Shift FG pressure control in CCR by opening U/S I/V of PV-1021 fully and closing
by-pass slowly in steps.
Shift pressure control of PV-1026 in CCR in same way, its both I/Vs are already open.
When control has shifted in CCR remove pinching of main burners I/Vs one at time
very slowly. Flow of FG should not increase more than 10~15 M3/hrs in one step. When
pinching is being removed. Reduce pressure at PV.1026 say by 0.2 Kg.cm2 in a step.