DOC. NO. :
TANK
Page
: Cover
TITEL :
PROJECT NO.
: 130008
PROJECT NAME
: SUNNY Project
CLIENT
LOCATION
: Gunsan, Korea
Y.S.YANG
H.K.BYUN
K.M.LEEM
REV. NO.
Date
Description
PREP'N
REVIEW
APPROVAL
PREPARATIO
REV. NO.
DEP'T
Project
Management
PREPARATION
REVIEW
G.W.Lee
J.B.Lee
APPROVAL
This DOCUMENT is property of Posco Engineering Co., Ltd.. Therefore, it shall not be released to any third party without permission of
an authorized personnel of the Posco Engineering Co., Ltd..
DOC. NO.
Project No.
Rev. No.
Page
TABLE OF CONTENTS
1. GENERAL CRITERIA
1.1 GENERAL
1.2 CODE, STANDARD AND REFERENCE DOCUMENT
1.3 MATERIAL SPECIFICATION
1.4 DESIGN CONSTANT
1.5 DESIGN LOAD
1.6 TYPICAL LOAD COMBINATION
2. DESIGN DATA
2.1 DESIGN DIMENSION
2.2 PILE INFORMATION
3. DESIGN LOAD
3.1 VENDOR LOAD DATA
3.2 DEAD LOAD
3.3 EMPTY LOAD
3.4 OPERATING LOAD
3.5 TEST LOAD
3.6 WIND LOAD
3.7 SEISMIC LOAD
3.8 DESIGN LOAD SUMMARY
4. LOAD COMBINATION
4.1 LEGEND
4.2 LOAD COMBINATION FOR STABILITY & SERVICEABILITY CHECK
4.3 LOAD COMBINATION FOR REINFORCE CONCRETE DESIGN
5. STABILITY CHECK
5.1 CALCULATION OF TOTAL WORKING LOAD FOR STABILITY CHECK
5.2 PILE STABILITY CHECK
6. MEMBER DESIGN OF RING WALL
6.1 CALCULATION OF MEMBER FORCE
6.2 MEMBER CHECK OF RING WALL
7. MEMBER DESIGN OF FOOTING
7.1 CALCULATION OF TOTAL WORKING LOAD FOR MEMBER DESIGN
7.2 CALCULATION OF MEMBER FORCE
7.3 MEMBER CHECK OF FOOTING
8. REBAR SKETCH
: 0
: 130008
: 0
:
DOC. NO.
Project No.
Rev. No.
Page
: 0
: 130008
: 0
:
1. GENERAL CRITERIA
1.1 GENERAL
- Project Name : SUNNY Project
- Location
: Gunsan, Korea
- Unit System : SI-Unit System
1.2 CODE, STANDARD AND REFERENCE DOCUMENT
- KBC 2009
General concrete design and Specification
- ASCE 7-10
Minimum Design Loads for Buildings and Other Structures (American Society of Civil Engineers)
- ACI 318-08
Building Code Requirements for Reinforced Concrete (American Concrete Institute)
- UBC 97
Uniform Building Code, Structural Engineering Design Provision
1.3 MATERIAL SPECIFICATION
1) Concrete
( Refer to 11C060-GG-001)
- Unit Weight
For Reinforced Concrete
: c = 24.0 kN/m
420 MPa
: fy =
: Es = 200000 MPa
3) Soil
- Unit Weight
For Soil above Ground Water
For Soil below Ground Water
: s = 19.0 kN/m
: s = 9.0 kN/m
Steel to Steel
Steel to Concrete
Steel to Roller
Concrete to Soil
Teflon to Teflon
:
:
:
:
:
( Refer to 11C060-Gs-002)
=
=
=
=
=
0.30
0.40
0.00
0.40
0.10
: SF = 1.5
: SF = 2.0
: SF = 1.2
3) Earthquake Load
-
DOC. NO.
Project No.
Rev. No.
Page
: 0
: 130008
: 0
:
DOC. NO.
Project No.
Rev. No.
Page
: 0
: 130008
: 0
:
Dead Load
Erection(Empty) Load of Equipment
Operating Load of Equipment
Test Load of Equipment
Live Load
Water Pressure
W
E
TF
H
B
Wind Load
Earthquake Load
Thermal Load
Earth Pressure
Bundle Pull Load
2) Allowable Stress Design Method (for Foundation Stability and Serviceability Check)
Condition
Erection
Operating
Test
Maintenance
Load combinations
1.0 D + 1.0 DE
1.0 D + 1.0 DE + 0.5 W
1.0 D + 1.0 DE + 0.7 E
1.0 D + 1.0 DO + 1.0 TF
1.0 D + 1.0 DO + 1.0 L
1.0 D + 1.0 DO + 1.0 W
1.0 D + 1.0 DO + 0.75 L + 0.75 W
1.0 D + 1.0 DO + 0.7 E
1.0 D + 1.0 DO + 0.75 L + 0.525 E
1.0 D + 1.0 DT
1.0 D + 1.0 DT + 0.25 W
1.0 D + 1.0 DE + 1.0 B
Condition
Erection
Operating
Test
Maintenance
Load combinations
1.4 D + 1.4 DE
0.9 D + 0.9 DE + 0.8 W
0.9 D + 0.9 DE + 1.0 E
1.4 D + 1.4 DO + 1.4 TF
1.2 D + 1.2 DO + 1.6 L + 1.2 TF
1.2 D + 1.2 DO + 1.2 L + 1.6 W + 1.2 TF
1.2 D + 1.2 DO + 1.0 L + 1.0 E + 1.2 TF
0.9 D + 0.9 DO + 1.6 W + 0.9 TF
0.9 D + 0.9 DO + 1.0 E + 0.9 TF
1.4 D + 1.4 DT
1.2 D + 1.2 DT + 0.4 W
1.2 D + 1.2 DE + 1.6 B
f
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
DOC. NO.
Project No.
Rev. No.
Page
: 0
: 130008
: 0
:
2. DESIGN DATA
2.1 DESIGN DIMENSION
[unit : m]
0.40
11.60
12.40
10.80
0.40
0.40
0.40
PLAN
Tank I.D = 11.00
10.00
0.50
0.50
Compacted Sand Fill
1.30
(ht)
0.20
0.80
0.60
SECTION
0.70
DOC. NO.
Project No.
Rev. No.
Page
TANK
: 0
: 130008
: 0
:
( Total Piles
P.H.C Pile
500 - 24 ea )
[unit : m]
d2i
0.75
d1i
12.40
Di D2 D1
0.75
PILE ARRANGEMENT PLAN
2) Allowable Pile Capacity
- For Vertical Direction
- For Lateral Direction
- For Uplift Direction
:
:
:
Pva =
Pha =
Pupa =
1000.00 kN/ea
100.00 kN/ea
100.00 kN/ea
Ii = Ni x Di / 8
Circle Array
Dia., Di
m
D1 : 10.90
D2 :
6.90
D3 :
2.90
TOTAL
Q'ty
Ni
Space of
Circles, d1i
Space of Piles
in Each Circle, d2i
ea
12
8
4
Di~Di-1 , m
2.00
2.00
m
2.82
2.64
2.05
m
178.22
47.61
4.21
m
42.21
66.68
158.64
24
230.03
Zmin. =
42.21 m
=
=
2.00 m
0.75 m
3.00D =
1.50D =
1.50 m
0.75 m
O.K
O.K
DOC. NO.
Project No.
Rev. No.
Page
: 0
: 130008
: 0
:
3. DESIGN LOAD
3.1 VENDOR LOAD DATA
Load Case
Empty Weight
Operating Weight
Test Weight
Vertical
Horizontal
Moment
kg
27,752
829,246
852,585
kg
kg.m
Remark
Wind
Wind Load
Seismic
Empty Case
Operating Case
3.2 DEAD LOAD
1) Footing Weight
: 0.8284 x 12.40 x
0.60
2) Ringwall Weight
x ( 11.60 - 10.80 ) /
x 10.80 /
4 x
x 24.00 = 1834.20 kN
0.70
4 x
0.70
1834.20 +
236.45
27752.0 kg =
272.25 kN
829246.0 kg =
8134.90 kN
852585.0 kg =
8363.86 kN
236.45 kN
x 18.00 = 1154.27 kN
x 24.00 =
+ 1154.27 +
4 )
78.09
= 3303.01 kN
DOC. NO.
Project No.
Rev. No.
Page
: 0
: 130008
: 0
:
:
:
Hw
Mw
=
=
0.00
0.00
kg =
kg =
0.00
0.00
kN
kN.m
(Refer to 'Appendix-1')
:
:
Hw
Mw
=
=
55.93 kN
319.01 kN.m
(Refer to 'Appendix-2')
:
:
Hw
Mw
=
=
157.49 kN
871.25 kN.m
Load Case
Basis
By Vendor
Wind Load
Use value
Vertical
kN
-
0.80
997.25
kN.m
DOC. NO.
Project No.
Rev. No.
Page
: 0
: 130008
: 0
:
:
:
Hee
Mee
=
=
0.00
0.00
kg =
kg =
0.00
0.00
kN
kN.m
- In Operating Condition, EO
Lateral Force
Moment at Top of Pedestal
:
:
Heo
Meo
=
=
0.00
0.00
kg =
kg =
0.00
0.00
kN
kN.m
2) By Calculation UBC 97
(Refer to 'Appendix-3')
- In Empty Condition, EE
Lateral Force
Moment at Top of Pedestal
:
:
Hee
Mee
=
=
- In Operating Condition, EO
Lateral Force
Moment at Top of Pedestal
:
:
Heo
Meo
= 2542.16 kN
= 12710.79 kN.m
85.08 kN
425.39 kN.m
(Refer to 'Appendix-4')
- In Empty Condition, EE
Lateral Force
Moment at Top of Pedestal
:
:
Hee
Mee
=
=
- In Operating Condition, EO
Lateral Force
Moment at Top of Pedestal
:
:
Heo
Meo
= 1622.64 kN
= 8113.21 kN.m
54.30 kN
271.52 kN.m
DOC. NO.
Project No.
Rev. No.
Page
: 0
: 130008
: 0
:
Load Case
Seismic Load
in Empty
Condition
Seismic Load
in Operating
Condition
Basis
By Vendor
By Calculation UBC 97
By Calculation KBC 2009
Use value
By Vendor
By Calculation UBC 97
By Calculation KBC 2009
Use value
- Design Seismic Load In Empty Condition
Lateral Force
: Hee =
Moment at Top of Pedestal
: Mee =
Moment at Bottom of Foundation
Mefe = Mee + Hee x ht
= 85.08
Vertical
kN
-
85.08
425.39
kN
kN.m
x
0.80
0.80
= 12710.79 kN.m
425.39
425.39
Load
Case
D
DE
DO
DT
WL
EE
EO
Vertical
Force
Lateral
Force
Moment at
Bot.of FDN
V
kN
3303.01
272.25
8134.90
8363.86
H
kN
Mf
kN.m
157.49
85.08
2542.16
997.25
425.39
12710.79
Description
kN.m
DOC. NO.
Project No.
Rev. No.
Page
TANK
: 0
: 130008
: 0
:
4. LOAD COMBINATION
4.1 LEGEND
D
DE
DO
DT
Dead Load
Erection(Empty) Load of Equipment
Operating Load of Equipment
Test Load of Equipment
WL
EE
EO
Operating Wind
Erection(Empty) Seismic
Operating Seismic
Load Factor
Remark
1.0 D + 1.0 DO
1.0 D + 1.0 DE + 1.0 WL
1.0 D + 1.0 DE + 0.7 EE
1.0 D + 1.0 DO + 1.0 WL
1.0 D + 1.0 DO + 0.7 EO
1.0 D + 1.0 DT
Normal operating
Empty with wind
Empty with Seismic
Operating with wind
Operating with Seismic
Test
=
0%
Load Factor
1.4 D + 1.4 DO
0.9 D + 0.9 DE + 1.3 WL
0.9 D + 0.9 DE + 1.0 EE
1.2 D + 1.2 DO + 1.3 WL
1.2 D + 1.2 DO + 1.0 EO
1.2 D + 1.2 DT
Remark
Normal operating
Empty with wind
Empty with Seismic
Operating with wind
Operating with Seismic
Test
DOC. NO.
Project No.
Rev. No.
Page
: 0
: 130008
: 0
:
5. STABILITY CHECK
5.1 CALCULATION OF TOTAL WORKING LOAD FOR STABILITY CHECK
Load
Combination
L/C-S1
L/C-S2
L/C-S3
L/C-S4
L/C-S5
L/C-S6
Vertical
load
Lateral
Force
Moment at
Bot.of FDN
V
kN
11437.91
3575.25
3575.25
11437.91
11437.91
11666.87
H
kN
157.49
59.55
157.49
1779.51
-
Mf
kN.m
997.25
297.77
997.25
8897.55
-
Remark
Normal operating
Empty with wind
Empty with Seismic
Operating with wind
Operating with Seismic
Test
DOC. NO.
Project No.
Rev. No.
Page
: 0
: 130008
: 0
:
L/C-S5
11437.91 kN
1779.51 kN
8897.55 kN.m
Pua
/ 24 ea
Pha =
100.00 kN/ea
O.K
100.00 kN/ea
O.K
O.K
L/C
No.
L/C-S1
L/C-S2
L/C-S3
L/C-S4
L/C-S5
L/C-S6
Pvmax.
kN/ea
476.58
172.60
156.02
500.21
687.39
486.12
Check
O.K
O.K
O.K
O.K
O.K
O.K
Lateral Reaction
Phmax.
Pha
Check
kN/ea kN/ea
100.00 O.K
6.56 100.00 O.K
2.48 100.00 O.K
6.56 100.00 O.K
74.15 100.00 O.K
100.00 O.K
DOC. NO.
Project No.
Rev. No.
Page
TANK
: 0
: 130008
: 0
:
Fu
0.70 (hp)
Fu1
Fu2
Tu = 1/2 x Fu x Dia.
0.40
Tu
Tu
(tw)
Tank I.D = 11.00
Ringwall Dia. = 11.20
* Coefficient of earth pressure at rest
1) Max. Tension Force of Rebar
- Uniform contents load
Wu = 8134.90 / (
= 1 - sin 30 = 0.50
: Ko = 1 - sin
L/C-U1
x 11.00 /
4 ) =
85.60
kN/m2
11.20
- Design moment
Mu = Fu1 x hp/2 + Fu2 x hp/3
= 47.94 x ( 0.70 / 2 ) +
288.20
3.53
kN/m
kN
x (
0.70
3 ) =
17.60
kN.m/m
DOC. NO.
Project No.
Rev. No.
Page
TANK
: 0
: 130008
: 0
:
Load
Combination
Wu
2
kN/m
85.60
2.86
2.86
85.60
85.60
88.01
L/C-U1
L/C-U2
L/C-U3
L/C-U4
L/C-U5
L/C-U6
Fu1
Fu2
Fu
Tu
Mu
kN/m
47.94
1.60
1.60
47.94
47.94
49.29
kN/m
3.53
3.53
3.53
3.53
3.53
3.53
kN/m
51.46
5.13
5.13
51.46
51.46
52.81
kN
288.20
28.74
28.74
288.20
288.20
295.76
kN.m/m
17.60
1.38
1.38
17.60
17.60
18.07
Remark
fy
Mpa
420
Tension Shear
0.85
0.75
b
mm
1000
h
mm
400
cover
mm
75
d
mm
325.0
Vu
kN
52.81
Mu
kN.m
18.07
Tu
kN
295.76
1) Rebar check
Rnreq. =
Mu
18.07 x 10 6
=
bd
0.85 x 1000 x 325
0.85fck
fy
1-
1-
2 x Rn
0.85fc'
0.2013 N/mm2
0.85 x 24
420
1-
1-
2 x 0.2013
0.85 x 24
Asreq.
= xbxd
= 0.00048 x 1000 x 325.0
Astemp. = 0.0020 x b x h / 2 [1800mm] = 0.002 x 1000 x 400 / 2
Asmin.1 = 1.4/fy x b x d
= 1.4 / 420 x 1000 x 325.0
Asmin.2 = 0.25 x fck/fy x b x d = 0.25 x 24 / 420 x 1000 x 325.0
Asreq. x 4/3 = 157 x 4/3
USE :
D16
@200 ( As =
993 mm )
>
Asselect =
= 0.00048
= 157 mm
= 400 mm
= 1083 mm
= 948 mm
= 209 mm
400 mm
O.K
2) Shear check
Vc = x 1/6 x fck x b x d
= 0.75 x 1/6 x 24 x 1000 x 325.0
199.02 kN
>
Vu = 52.81 kN
=
O.K
= Tu / ( x fy)
= 295756 / ( 0.85 x 420 ) =
= 0.0025 x tw x hp = 0.0025 x 400 x 700
=
1589 mm )
>
828 mm
700 mm
Asselect =
828 mm
O.K
DOC. NO.
Project No.
Rev. No.
Page
TANK
: 0
: 130008
: 0
:
Load
Combination
L/C-U1
L/C-U2
L/C-U3
L/C-U4
L/C-U5
L/C-U6
Vertical
load
Lateral
Force
Moment at
Bot.of FDN
V
kN
16013.07
3217.73
3217.73
13725.49
13725.49
14000.24
H
kN
204.74
85.08
204.74
2542.16
-
Mf
kN.m
1296.42
425.39
1296.42
12710.79
-
Remark
Normal operating
Empty with wind
Empty with Seismic
Operating with wind
Operating with Seismic
Test
2
3
=
=
127.37 m
208.78 m
L/C-U05
208.78
- Design moment
Mu(+) = Wu x Ln / 11
Mu(-) = Wu x Ln / 10
= 168.64 x 2.90
= 168.64 x 2.90
2
2
/ 11 = 128.93 kN.m /m
/ 10 = 141.83 kN.m /m
873.05 kN/ea
DOC. NO.
Project No.
Rev. No.
Page
: 0
: 130008
: 0
:
Pile reaction
Pvumax.
kN/ea
667.21
164.79
144.15
602.61
873.05
583.34
fy
Mpa
420
Tension Shear
0.85
0.75
b
mm
1000
h
mm
600
cover
mm
150
d
mm
450.0
Vu
Mu
Pvu
kN
kN.m
kN
244.53 141.83 873.05
1) Rebar check
Rnreq. =
Mu
141.83 x 10 6
=
bd
0.85 x 1000 x 450
0.85fck
fy
1-
1-
2 x Rn
0.85fc'
0.824 N/mm2
0.85 x 24
420
1-
1-
2 x 0.824
0.85 x 24
Asreq.
= xbxd
= 0.00200 x 1000 x 450.0
Astemp. = 0.0020 x b x h / 2 [1800mm] = 0.002 x 1000 x 600 / 2
Asmin.1 = 1.4/fy x b x d
= 1.4 / 420 x 1000 x 450.0
Asmin.2 = 0.25 x fck/fy x b x d = 0.25 x 24 / 420 x 1000 x 450.0
Asreq. x 4/3 = 901 x 4/3
USE :
D19
@200 ( As = 1433 mm )
>
Asselect = 1202 mm
2) Shear check
Vc = x 1/6 x fck x b x d
= 0.75 x 1/6 x 24 x 1000 x 450.0
275.57 kN
>
Vu = 244.53 kN
=
O.K
= 0.00200
= 901 mm
= 600 mm
= 1500 mm
= 1312 mm
= 1202 mm
O.K
DOC. NO.
Project No.
Rev. No.
Page
: 0
: 130008
: 0
:
873.05 kN
2985
x 450.0
2985
x 450.0
1628.42 kN
>
Vpu =
873.05 kN
O.K
DOC. NO.
Project No.
Rev. No.
Page
: 0
: 130008
: 0
:
8. REBAR SKETCH
Ringwall rebar
Footing rebar
D16 @200
D19 @200
2 x 4ea - D16
REBAR PLAN
2 x 4ea - D16
D16 @200
D19 @200
REBAR SECTION
DOC. NO.
Project No.
Rev. No.
Page
: 0
: 130008
: 0
:
: ASCE 7-10
:
:
:
III
C
V =
40.00 m/sec
3) Information of Equipment
- Diameter/Width
- Total Height
- Section Shape
:
:
:
D = 11.00 m
h = 10.00 m
Round
( T.O.G
= 0.50 m
Kz :
Kzt :
Kd :
Kd
DOC. NO.
Project No.
Rev. No.
Page
TANK
See the below 26.9
G =
0.85
: 0
: 130008
: 0
:
+ 4.49
0.1335
0.89
IZ : Intensity of Turbulence at Height 'z'
IZ = c x (10 / z)1/6
= 0.20 x ( 10 / 6.00 ) 1/6 = 0.22
c : Turbulence Intensity Factor
= 0.20 (for Exposure C)
z : The Equivalent Height of the Str. as 0.6he, but Not Less than zmin.
z = 0.60 x 10.00 =
6.00 m zmin. = 4.57 m (for Exposure C)
qQ , qV : Peak Factor for Background Response, Wind Response
= 3.40
qR : Peak Factor for Resonant Response
qR = {2 ln(3600n1)} + 0.577 / {2 ln(3600n1)}
= { 2 x ln ( 3600 x 3.64 ) } + 0.577 / { 2 x ln ( 3600 x 3.64 ) }
= 4.49
n1 : Building Natural Frequency
n1 = 1 / T = 1 / (Ct x hx)
3.64 Hz
= 1 / ( 0.0488 x 10.00 0.75 ) =
Q : Background Response Factor
Q = [1 / {1 + 0.63 x ((B + he)/LZ)0.63}]
= ( 1 / [ 1 + 0.63 x { ( 11.00 + 10.00 ) / 137.60 }
= 0.92
B : Horizontal Dimension of Building
= 11.00 m
LZ : Integral Length Scale of Turbulence at the Equivalent Height
LZ = I x (z / 10)
137.60 m
= 152 x ( 6.00 / 10 ) 1/5 =
l =
152.40 m , = 1/5 (for Exposure C)
0.63
] )
DOC. NO.
Project No.
Rev. No.
Page
: 0
: 130008
: 0
:
Type of Surface
All
Rough
1
1.3
0.7
h/D
7
1.4
0.8
25
2.0
0.9
DOC. NO.
Project No.
Rev. No.
Page
TANK
: 0
: 130008
: 0
:
To
m
4.60
6.10
7.60
9.10
10.50
Kz
qz
Cf
Af
Arm
Length
Expos.C
0.85
0.90
0.94
0.98
1.04
kN/m
0.79
0.84
0.88
0.91
0.97
m
45.10
16.50
16.50
16.50
15.40
kN
21.25
8.23
8.60
8.96
8.88
m
2.55
5.35
6.85
8.35
9.80
kN.m
54.19
44.05
58.90
74.85
87.02
0.85
0.70
:
:
Hw =
Mw =
55.93
55.93 kN
319.01 kN.m
319.01
DOC. NO.
Project No.
Rev. No.
Page
: KBC 2009
:
:
C
V =
40.00 m/sec
3) Information of Equipment
- Diameter/Width
- Total Height
- Section Shape
:
:
:
D = 11.00 m
h = 10.00 m
Round
( T.O.G
= 0.50 m
: 0
: 130008
: 0
:
DOC. NO.
Project No.
Rev. No.
Page
: 0
: 130008
: 0
:
IH = 0.1 x
Bf :
Bf =
=
H :
B :
LH : (m)
H
0.5
LH = 100 x
= 57.74 m
30
k = 0.33 ( H B)
k = -0.33
k = -0.33 ( H < B)
DOC. NO.
Project No.
Rev. No.
Page
: 0
: 130008
: 0
:
Z (m)
10.00
15.00
20.00
25.00
kg/m
1.22
1.22
1.22
1.22
Vo
m/s
40.00
40.00
40.00
40.00
Kzr
1.00
1.07
1.11
1.15
Kzt
1.00
1.00
1.00
1.00
Iw
1.00
1.00
1.00
1.00
Vz
m/s
40.00
42.63
44.51
46.03
qz
kN/m
0.98
1.11
1.21
1.29
123456789 ###################################
6) Calculation of Wind Force & Moment at Equipment Base Level
- Equipment
- Max(H,D) / Min (H,D) = 11.00 / 10.00 = 1.10 Cf = 0.70
Height, Z (m)
qz
Gf
Cf
A
Wf
Arms Moment
from
to
kN/m
m
kN
m
kN.m
0.50
10.00
0.98
2.08
0.70
104.50
148.61
5.25
780.19
10.00 10.50
1.11
2.08
0.70
5.50
8.88
10.25
91.07
:
:
Hw =
Mw =
157.49
157.49 kN
871.25 kN.m
871.25
Remark
DOC. NO.
Project No.
Rev. No.
Page
: 0
: 130008
: 0
:
: UBC 97
SD
:
(Stiff Soil Profile)
: C
- Seismic Zone
- Soil Profile Type
- Seismic Source Type
Z =
0.15
3) Information of Equipment
- Total Height
- Empty Weight
- Operating Weight
:
:
:
h =
DE =
DO =
10.00 m
272.25 kN
8134.90 kN
DOC. NO.
Project No.
Rev. No.
Page
: 0
: 130008
: 0
:
V = {(Cv x I) / (R x T)} x W
= { ( 0.32 x 1.25 ) / ( 2.20 x 0.274 ) } x W =
0.663 W
0.313 W
: Ve =
0.313 W
- In Empty Condition
272.25
Lateral Force
: Hee = 0.313 x DE
= 0.313 x
Moment at Top of Pedestal
Mee = Hee x h / 2
85.08
425.39 kN
=
x 10.00 x 1/2 =
- In Operating Condition
Lateral Force
: Heo = 0.313 x DO
= 0.313 x 8134.90
Moment at Top of Pedestal
Meo = Heo x h / 2
12710.79 kN
= 2542.16 x 10.00 x 1/2 =
85.08 kN
2542.16 kN
DOC. NO.
Project No.
Rev. No.
Page
: KBC 2009
- Seismic Zone
- Soil Profile Type
2) Information of Equipment
- Total Height
- Empty Weight
- Operating Weight
:
:
:
h =
DE =
DO =
10.00 m
272.25 kN
8134.90 kN
V = Cs x W
Note, W : effective weight
Cs : Seismic response coefficient
S =
0.22
: 0
: 130008
: 0
:
DOC. NO.
Project No.
Rev. No.
Page
: 0
: 130008
: 0
:
(SD1 x IE) / (R x T)
SDS x IE / R
0.01
SDS : design, 5 percent damped, spectral response acceleration
parameter at short periods
SDS = S x 2.5 x Fa x 2/3
= 0.499
SD1 : design, 5 percent damped, spectral response acceleration
parameter at 1 second periods
SD1 = S x Fv x 2/3
= 0.287
S = Zone factor = 0.22
...refer to the following table
Fa =
1.36
=
...refer to the following table
Fv = 1
1.96
=
...refer to the following table
IE : importance factor = 1.20
...refer to the following table
R : response modification coefficient = 3.00
...refer to the following table
T : the fundamental period of the structure
T = Ct x hn3/4
= 0.276 Sec
Ct : numerical coefficient
= 0.085 ; for steel moment-resisting frames
= 0.073 ; for reinforced concrete moment-resisting frames
hn
DOC. NO.
Project No.
Rev. No.
Page
: 0
: 130008
: 0
:
3) Reference Table
1
2
2
(S)
0.22
(, , , , , , , , ,
), (, , , , , , , ,
, , ),
0.14
(m/s)
N (blow/300mm)
Su (kPa)
SA
SB
SC
SD
SE
1500 >
760 ~ 1500
360 ~ 760
180 ~ 360
< 180
> 50
15 ~ 50
< 15
> 100
50 ~ 100
< 50
Ss<0.25
Ss=0.50
SA
0.8
0.8
SB
1.0
1.0
SC
1.2
1.2
SD
1.6
1.4
SE
2.5
1.9
Ss=0.75
0.8
1.0
1.1
1.2
1.3
S0.1
S=0.2
SA
0.8
0.8
SB
1.0
1.0
SC
1.7
1.6
SD
2.4
2.0
SE
3.5
3.2
Note, S (S).
Use Fv = 1.96 (for Site Class : SD , Ss = 0.22)
S=0.3
0.8
1.0
1.5
1.8
2.8
DOC. NO.
Project No.
Rev. No.
Page
: 0
: 130008
: 0
:
(IE)
()
- 1000m
- 1000m ,
, , , ,
- ,
1.5
(1)
- 1000m
- 1000m ,
, , , ,
- 5000m , , , ,
, ,
( )
- , , ,
- 5 , , ,
-
1.2
1.0
(2), (3)
,
( )
( )
R
8
7
6
8
5
3
2.5
DOC. NO.
Project No.
Rev. No.
Page
: 0
: 130008
: 0
:
Cs
= (SD1 x IE) / (R x T)
= ( 0.287 x 1.20 ) / ( 3.00 x 0.276 )
- Csmax. = SDS x IE / R
= ( 0.499 x 1.20 ) / 3.00
-
0.417 W
0.199 W
Csmin. = 0.01
Use Design Shear Force
V =
0.199 W
- In Empty Condition
272.25
Lateral Force
: Hee = 0.199 x DE
= 0.199 x
Moment at Top of Pedestal
Mee = Hee x (h x 1/2)
54.30
271.52 kN
=
x ( 10.00 x 1/2 ) =
- In Operating Condition
Lateral Force
: Heo = 0.199 x DO
= 0.199 x 8134.90
Moment at Top of Pedestal
Meo = Heo x (h x 1/2)
8113.21 kN
= 1622.64 x ( 10.00 x 1/2 ) =
54.30 kN
1622.64 kN