Ct-fm-171 1 Site Diary 2014.05.13 Acesta Estructuras

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

DAILY SITE REPORT

CONTRACTOTOR
DAY:
Martes

ACESTA
DATE:

05/13/2014

CONTRACTOR PLANT AND EQUIPMENT


Equipment
1
GRUA DE 20 toneladas (p and
h
2
3 claims or 9jenys

Equipment

Equipment

5.

9.

6.

10.

3.

7.

11.

4.

8.

12.

CONTRACTOR PERSONNEL
Indirect
Specify Employee Name & role

Direct
Trades

Total: 2
#

Trades

Salvador Hernandez pacheco


Agustin aguilera

Other Office Staff Total:

SITE CONDITIONS
Dia soleado

Page: 1 of 2

MEETINGS
ATTENDED
/
DIRECTIONS
&
SUBCONTRACTORS / INTERFACE WITH CLIENT

INSTRUCTIONS

ACESTA

HSE (JHA, PRESTARTS, SITE INSPECTIONS)


Llenado correctamente

DELAYS OR ISSUES

Print Name:

Sign:

Date:

Carlos Gaset
05/13/2014

Page: 2 of 2

GIVEN

TO

You might also like