Professional Documents
Culture Documents
Appendix 2. Sub-Bottom Profile
Appendix 2. Sub-Bottom Profile
1.
Introduction
1.1 General
ThisworkwascarriedoutbyPT.QyudosGeosurveyIndonesiaforthe
purposesofDepthInvestigationforGasandOilPipelineinCBLRiver
Area,BabelanandMuaraGembong,Bekasi.
SurveysofthisworkistheSubBottomProfilingSurvey(SBP).Inthis
reportcontainstheresultsofasurveythathasbeencarriedout.The
fieldworkhasbeencompletedfor3daysfromAugust,6August,8,
2014startfrommobilization,datacollectionuntilDemobilization,and
thenfollowedbydataprocessingandpreparationofthefinalreport.
1.2 Purpose
Thepurposeofthissurveyistoobtaininformationonthedepthofoil
andgaspipelinesthatcrossingthroughtheregion,especiallyBabelan
CBLrivertoMuaraGembong,Bekasi.
1.3 Scope
Thescopeofthisworkinclude:
a.Surveyactivity
CarryingoutSubBottomProfilingSurvey(SBP)
Documentationofallsurveysactivities
b.DataProcessingandInterpretation
PerformSubBottomProfiling(SBP)dataprocessing
PipelineDepthanalysisandinterpretationofSubBottom
Profiling(SBP)data
BabelanMuaraGembong,Bekasi,WestJava1
1.4 ReportSystematic
Theresultsofthesurveyarepresentedintheformofareportwith
thefollowingcomposition:
a.Introduction
b.Location
c.ImplementationofSurveyandDataProcessing
d.Result
e.Conclusion
f.Appendix
BabelanMuaraGembong,Bekasi,WestJava2
2.
Location
2.1 SurveyArea
ThelocationisontheCBLRivertoMuaraGembong,Bekasi.Corridor
location in UTM is X: 9322000.00 9331500.00 and Y: 718000.00
728500.00. Location of the survey area can be seen in Figure 1. is
locatedatBabelantoMuaraGembong,Bekasi,WestJava.
Ficture1.Surveyarea(redline)
BabelanMuaraGembong,Bekasi,WestJava3
3.
Survey Implementation
processing
and
Data
Thisworkusesmultiplestagesincludingpreparation,Implementationand
DataProcessing.
3.1 PreparationPhase
3.1.1 SecondaryDataCollection
Prior to the survey conducted, the team first conduct
preliminary surveys and secondary data collection. It aims to
obtainapictureandadditionalinformationontheworkarea,
thepositionandsizeofthepipesonthesurface,logisticsand
availabilityofsurveysvesselandroadaccesstotheworkarea.
Picture2.Signthepositionofthepipeintheground(left)andthe
appearanceonthesurfaceofthepipe(Right)
BabelanMuaraGembong,Bekasi,WestJava4
Picture3.SitePlanofSBPsurvey
SBPsurveyconductedinfour(4)pointlocationascanbeseen
intheimageabove.
BabelanMuaraGembong,Bekasi,WestJava5
3.1.2 Equipment
a. NavigationandPositioning
1(one)unitofTrimble5700GPS
1(ane)unitofNotebookandNavigationSoftware(HydroPro)
Picture4.Trimble5700GPS(left)andAntenaGPSTrimble(right)
b. SubBottomProfiling(SBP)Survey
1(one)unitofSyqwestStratabox3510SBPSystem
Picture5.Stratabox10KHzTranducer(left)andStrataboxConsole(right)
BabelanMuaraGembong,Bekasi,WestJava6
3.1.2.SupportLogistics
1(one)unitofWoodenBoat
1(one)unitofGenerator
1(one)unitofBatteryDCPowerSupply12volt35A
2m
GPS Antenna
6,5m
0,95 m
1,72 m
Picture6.SBPSurveyVesselOffset(above)andsurveyvesselused(below)
BabelanMuaraGembong,Bekasi,WestJava7
3.2 ImplementationPhase
3.2.1 PositioningSystem
Picture7.HydroproNavigationSystem(left)andnavigationprocess(right)
3.2.2 SubBottomProfiling(SBP)Survey
BabelanMuaraGembong,Bekasi,WestJava8
Picture8.ProcessofinstallationStrataboxSystem
Picture9.ProcessofrecordingandqualitycontroldataSBP
Sourceoftheacousticwavesworkingatfrequencyof10kHz,withthe
penetrationcapabilityofabout20mwithasensitivityofupto6cm
thicknessofthelayerdependonthesedimenttype.
BabelanMuaraGembong,Bekasi,WestJava9
Picture10.SubBottomProfiling(SBP)method
3.3 DataProcessing
Dataprocessingstagesincludedataprocessingandinterpretationof
pipedepth.
3.3.1
PengolahanDataSubBottomProfiling(SBP)
a.Geometry
This stage aims to prepare the data before through the filtering
stages so that the raw data would be to have the value of path
length,thecoordinatesofthetrajectoryandtheactualdatalength.
b.Filtering
Filteringaimstominimizenoiseandreducediffractioneffectsinthe
datathatcaninterferewiththeprocessofinterpretation.
BabelanMuaraGembong,Bekasi,WestJava10
c. Muting
Mutingstageprocessistoeliminatethewatercolumnbetweenthe
surfaceandthebottomsurfaceoftheriversothatthedatawillbe
freeofsurfacenoise.
3.4 DataInterpretation
Afterprocessingthedata,thenextstepistointerpretthedepthof
existingpipelineinthearea.
Toassisttheinterpretation,atthefieldhasbeencarriedoutMarking
the position of the pipe on the SBP of data based on the position
information of the pipe based on secondary data. Secondary data
wereusedincludingthepipepositiondatafromtheClients(CADfile)
andpipepositionsonlandfrompreliminarysurvey.
Location 4
Location 3
Location2
Location 1
Picture11.Secondarydataofpipeposition(Autocad)
BabelanMuaraGembong,Bekasi,WestJava11
Marking
Picture12.MarkingResultsofthepipelinepositiononfieldintheSBPdata
Marking
Picture13.InterpretationoftheSBPdataResults.Pipe(redcircle)and
anotherobject(yellowcircle)
Amplituderesponseindicatinganobjectbelowtheseabed/riveron
thedataofSBPisinfluencedbyseveralfactorsincludingthetypeof
seabed sediment / river, pipe dimensions and depth of the pipe
belowthesurfaceoftheseabed/river.
ForCBLriverandMuaraGembongarea,thesurfaceisdominatedby
thickMudsediment,itcausestheseismicwaveenergyabsorbedby
thelayersothattheseismicwavesexperiencealoss ofenergyfast
enough and weakened with depth. Location of pipe in this area is
estimated to be at a fairly shallow depth (under 5 feet of water
BabelanMuaraGembong,Bekasi,WestJava12
surface)sothatthereflectionofseismicwavesfromthepipeunder
the bottom surface of the river indicated by a point or thick
amplitudespot.
BabelanMuaraGembong,Bekasi,WestJava13
4. Result
After going through the data interpretation of the obtained results as
follows:
4.1 Location1
Pictureofthelocationcanbeseeninthefollowingdocumentation,
Picture14.AreaLocations1contained3crossingraft
Atlocation1,thereare3raftpathsthatcrosstheCBLriversotheteam
haddifficultypassingropestheCrossingraft.
Atlocation1therearetwo(2)trajectoryofSBP,Line1L1andLine1L2.
Thepositionofthetrajectorycanbeseeninthefigurebelow,
BabelanMuaraGembong,Bekasi,WestJava14
Pipe
1L2
1L1
Picture15.PipepositionandtheLineatLocation1
Line1L1
Marking
Picture16.SBPRawdataLine1L1andpipeMarkingonthefield
Picture17.Interpretationresult.Pipe(redcircle)online1L1locatedatadepthof2meters
fromthesurfaceoftheriverbed.
BabelanMuaraGembong,Bekasi,WestJava15
Picture18.ZoompipelineAreaanomaliesintheSBPdatathatisdisplayed
intheWiggleform
Basedonthepictureabovelookforareasofpipeanomalieshaveamplitudes
andperiodsgreaterthanaroundit.
Line1L2
Marking
Picture19.SBPRawdataLine1L2andpipeMarkingonthefield
Picture20.Interpretationresult.Pipe(redcircle)online1L2locatedatadepthof1meters
fromthesurfaceoftheriverbed.
BabelanMuaraGembong,Bekasi,WestJava16
Picture21.ZoompipelineAreaanomaliesintheSBPdatathatisdisplayed
intheWiggleform
Basedontheresultsofinterpretation,fortheanomalousonLIne1L1is
indicated as the pipe is at a depth of 2 meters. As for the Line 1L2
anomalyisatadepthof1meter.
4.2 Location2
Pictureofthelocation2canbeseeninthefollowingdocumentation,
BabelanMuaraGembong,Bekasi,WestJava17
Picture22.PipesareseenonthesurfaceintheareaofLocation2
At location 2, there are 3 (three) Trajectory of SBP, Line 2L1, Line 2L2
and Line 2L3. The third position of the trajectory can be seen in the
figurebelow,
Pipe
Pipe
2L2
2L3
2L1
Picture23.PipepositionandSBPLineonLocation2
BabelanMuaraGembong,Bekasi,WestJava18
Line2L1
Marking
Marking
Picture24.SBPRawdataLine2L1andpipeMarkingonthefield
Picture25.Interpretationresult.OnLine2L1,pipe1locatedatadepthof0.5mfrom
theriverbed,pipe2and4locatedatadepthof2m,pipe3atadepthof4mandpipe5
areclosetothesurfaceoftheriverbed
a).
BabelanMuaraGembong,Bekasi,WestJava19
b).
c).
d).
BabelanMuaraGembong,Bekasi,WestJava20
e).
Picture26.ZoompipelineAreaanomaliesintheSBPdatathatisdisplayed
intheWiggleformforallpipeonLine2L1.A).Pipe1,b).Pipe2,c)pipe3,d)pipe4
dane).Pipe5
Basedonthepictureabovelookforareasofpipeanomalieshaveamplitudesand
periodsgreaterthansurroundingareas,andtheresultsareasfollows,
Pipe
pipe1
pipe2
pipe3
pipe4
pipe5
DepthfromRiverbed
(meter)
0.5
2
4
2
Closetothesurface
Table1.Interpretationresultforlocation2Line2L1
BabelanMuaraGembong,Bekasi,WestJava21
Line2L2
Marking
Marking
Picture27.SBPRawdataLine2L2andpipeMarkingonthefield
Picture28.Interpretationresult.OnLine2L2,pipe1locatedatadepthof0.5mfrom
theriverbed,pipe2and4locatedatadepthof2m,pipe3atadepthof4m
a).
BabelanMuaraGembong,Bekasi,WestJava22
b).
c).
d).
Picture29.ZoompipelineAreaanomaliesintheSBPdatathatisdisplayed
intheWiggleformforallpipeonLine2L1.A).Pipe1,b).Pipe2,c)pipe3,and
d)pipe4
BabelanMuaraGembong,Bekasi,WestJava23
Pipe
DepthfromRiverbed
(meter)
pipe1
pipe2
pipe3
pipe4
0.5
2
4
2
Table2.Interpretationresultforlocation2Line2L2
Line2L3
Marking
Marking
Picture30.SBPRawdataLine2L3andpipeMarkingonthefield
Picture31.Interpretationresult.OnLine2L3,pipe1locatedatadepthof0.5mfrom
theriverbed,pipe2and4locatedatadepthof2m,pipe3atadepthof4mandpipe5
locatedclosetothesurfaceofriverbed
BabelanMuaraGembong,Bekasi,WestJava24
a).
b).
c).
BabelanMuaraGembong,Bekasi,WestJava25
d).
e).
Picture32.ZoompipelineAreaanomaliesintheSBPdatathatisdisplayedinthe
WiggleformforallpipeonLine2L1.A).Pipe1,b).Pipe2,c)pipe3,d)pipe4and
e).Pipe5
Based on the picture above look for areas of pipe anomalies have
amplitudes and periods greater than surrounding areas, and the results
areasfollows,
BabelanMuaraGembong,Bekasi,WestJava26
Pipe
DepthfromRiverbed
(meter)
pipe1
pipe2
pipe3
pipe4
pipe5
0.5
2
4
2
Closetothesurface
Table3.Interpretationresultforlocation2Line2L3
4.3 Location3
Picture of the location 3 can be seen in the results of the following
documentation,
Picture33.AtLocation3therearesignofPertaminapipelinenearaCBLRiver
BabelanMuaraGembong,Bekasi,WestJava27
Atthelocation3,thereare3(three)trajectoryofSBP,Line3L1,Line3
L2,andLine3L3.Thepositionofthetrajectorycanbeseeninthefigure
below,
Pipe
3L3
3L2
3L1
Picture34.PipepositionandtrajectoryonLocation3
Line3L1
Marking
Picture35.SBPRawdataLine3L1andpipeMarkingonthefield
BabelanMuaraGembong,Bekasi,WestJava28
Picture36.Interpretationresult.OnLine3L1,pipelocatedatadepthof2mfromthe
riverbed
Picture37.ZoompipelineAreaanomaliesintheSBPdatathatisdisplayed
intheWiggleform
Lintasan3L2
Marking
Picture38.SBPRawdataLine3L2andpipeMarkingonthefield
BabelanMuaraGembong,Bekasi,WestJava29
Picture39.Interpretationresult.Pipe(redcircle)onLine3L2locatedclosetothe
riverbed
Picture40.ZoompipelineAreaanomaliesintheSBPdatathatisdisplayed
intheWiggleform
Line3L3
Marking
Picture41.SBPRawdataLine3L3andpipeMarkingonthefield
BabelanMuaraGembong,Bekasi,WestJava30
Picture42.Interpretationresult.Pipe(redcircle)onLine3L3locatedclosetothe
riverbed
Picture43.ZoompipelineAreaanomaliesintheSBPdatathatisdisplayed
intheWiggleform
Basedontheresultsofinterpretation,forthelocation3,anomalyonLine
3L1isindicatedasthepipeisatadepthof2meters.AsfortheLine3L2
andLine3L3anomaliesarenearthesurfaceoftheriverbed.
4.4 Location4
Location 4 description can be seen in the results of the following
documentation,
BabelanMuaraGembong,Bekasi,WestJava31
Picture44.Location4areintheseanearMuaraGembong
Atlocation4,thereare3(three)trajectoryofSBP,Line4L1,Line4L2,
and Line 4L3. The position of the trajectory can be seen in the figure
below,
4L3
4L2
4L1
Pipe
Picture45PipepositionandthetrajectoryonLocation4
BabelanMuaraGembong,Bekasi,WestJava32
Line4L1
Marking
Picture46.SBPRawdataLine4L1andpipeMarkingonthefield
Picture47.Interpretationresult.pipe(redcircle)onLine4L1locatedatadepthof2,2
mfromtheriverbed
Picture48.ZoompipelineAreaanomaliesintheSBPdatathatisdisplayed
intheWiggleform
Basedonthepictureabovelookforareasofpipeanomalieshaveamplitudes
andperiodsgreaterthanaroundit.
BabelanMuaraGembong,Bekasi,WestJava33
Line4L2
Marking
Picture49.SBPRawdataLine4L2andpipeMarkingonthefield
Picture50.Interpretationresult.pipe(redcircle)onLine4L2locatedatadepthof2m
fromtheriverbed
Picture51.ZoompipelineAreaanomaliesintheSBPdatathatisdisplayed
intheWiggleform
BabelanMuaraGembong,Bekasi,WestJava34
Line4L3
Marking
Picture52.SBPRawdataLine4L3andpipeMarkingonthefield
Picture53.Interpretationresult.pipe(redcircle)onLine4L3locatedatadepthof2m
fromtheriverbed
Picture54.ZoompipelineAreaanomaliesintheSBPdatathatisdisplayed
intheWiggleform
BabelanMuaraGembong,Bekasi,WestJava35
Followingisasummarytableofeachpipedepthforalllocation,
Table1.Listofpipedepthinterpretation
BabelanMuaraGembong,Bekasi,WestJava36
5. Conclusions
1. Thick Mud sediment Type and shallow depth of the pipe causing the
indicationsofthepipelineintheformofapointorhighamplitudespot.
Forlocation2thereare5pipes,thepipesarelocatednearthesurfaceup
to4mfromtheriverbed.
Thenatlocation3,thepipeisnearthesurfaceupto2metersfromthe
riverbed.
For the last location of the Location 4 which is in the waters of Muara
Gembong to the offshore direction, the pipe was at a depth of 2 2.2
metersbelowtheseabed.
BabelanMuaraGembong,Bekasi,WestJava37