Qatar Engineering & Construction Company W.L.L
Contract Department
P.O Box 24491
Dena, Sats of Cater &
Phone: 4458 7348, Fax: 4458 7201 Qcon
MEMORANDUM
From: Saad Rabbani To: P.K. Sankarankutty
Ref: QconiContr/Memo/94/RMT/15 Date: 25° March 2015
ENo.E- 5EL6
Sub.: Subcontract No. RGP-SA-475-001; Site Preparation, Grading and Installation of
Fencing on the Perimeter of the Facility.
Dear Si
Please find herewith attached the above mentioned subject Letter of Intent issued by Chiyoda
Almana Engineering LLC, for your review and consent to the followings.
SINo | Activity Description Comments. | Remarks
1 | Scope verification oe
2 ‘Schedule Verification FD BE AE —_
3 | Price Verification ok
“| Reviewed by ak
Best regars,
sundae
Sr. Contracts Engineer
Encl: A/a Received by:exrvonn aun om
ENGINEERING LLC
‘Al Gasser Tower 12% Floor P.O, Box: 22961 Doha-Oatar C.R. No.: 38375
TEL: +974-4407-4665 Fax: +874-4407-4650
RasGas Long Term 2PCn Service Contract
LETTER
To: Me. Mazen Abu Naba’a Date : March 25, 2015
Managing Director Ref. No. RGP-475-L-CtQCon-0008
Job No. + RLO9133
Qatar Engineering and
Construction Co. WEL (QCON)
P.O. Box:24491, Doha-Qatar
Tel:+974 4458 7219/7200
Fax: +974 4458 7201
Page No (s) : 3
Sent by () Fax
(00 Handearry
From: John H. A. Mooren Issued For : (X)Request
Project Director Action/Reply
Chiyeda-Almana Eng’g LLC ()Reply to your Doc.
Doha-Qater ( )Information
( )For your Action
Subject: LETTER OF INTENT
IRGCP-475] Site Preparation, Grading and Installation of Fencing on
the Perimeter of the Facility (RPS-128-001)
REFERENCE: RGP-475-INQ-001
Gentlemen,
a. Th
is to inform you that we, Chiyoda-Almana Engineering LLC
ereinafter called “Chiyoda-Almana”) are engaging you, Qatar
Engineering and Construction Co. WL (hereinafter called
“SUBCONTRACTOR”} as the preferred subcontractor for the site
Preparation, Grading and Installation of Fencing on the Perimeter
of the Facility. to be performed in Ras Laffan Industrial City,
Qatar, for KasGas Company Limited (hereinafter called “COMPANY”) .
2. Time is of the essence and “SUBCONTRACTOR shall proceed with the
necessary work immediately pending execution of the Subcontract.
Chiyoda-Almana hereby authorizes SUBCONTRACTOR to commence the
Work, starting from the date of this Letter of Intent so that the
COMPLETION OF THE: WORK as defined in Article 1 of the Subcontract
General Terms and Conditions shall be achieved.on or before the
agreed Schedule (refer to Section-6, Work Schedule, of the
Requisition and Addendum #2), that is, within 45 days from date of
mobilization and approval of eCPw permit
Page | of 3eee om
ENGINEERING LLC -
‘Al Gassar Tower 12% Floor P.O. Box! 22961 Doha-Qater C.R. No.: 38375
‘TEL: +974-4407-4666 FAK: +974-4407-4650
3. The all-inclusive Fixed Lump Sum price of the Subcontract shall be
United States Dollars Seven Hundred Fifty One Thousand Three
Hundred Fifty One and Thirty Two Cents (US$ 751,351.32) only.
‘The Fixed Lump Sum Price shall not be subject to escalation nor
nerease for any reason whatsoever unless otherwise specifically
provided in the Subcontract.
4. The Subcontract shall be finalized based on the following
documents:
a) This Letter of Intent
b) Draft Subcontract Agreement (RGP-SA~475-001)
c) Subcontract General Terms and Conditions, Document | No.
GTC-CAEL-001 Rev 1 dated 29 March 2011
d) Instructions to Subcontractors (RGP-475-ITS-001-B)
e) Clarifications/Addendum, if any
£) QCON’s Technical and Commercial Proposals dated st
Decenber 2014 and subsequent clarifications
g) Requisition No. RGP-475-R-00-001-B dated 16% October 2014.
Tf there are any conflicts between any of the above mentioned
documents, the documents shall have the priority in the above
order.
‘The parties shall use their best efforts to have the Subcontract
executed within thirty (30) days after the date of this Letter of
Intent. If the parties fail to execute the Subcontract within such
period, Chiyoda-Almana reserves the right to cancel this Letter of
Intent at any time at Chiyoda~Almana’s absolute discretion, and
upon receipt of Chiyoda-Almana’s written notice of cancellation,
SUBCONTRACTOR shall discontinue the Work. However, in such case,
SUBCONTRACTOR shall be reimbursed for all reasonable and duly
substantiated costs and expenses actually incurred for the Work up
to the date of termination:
6. Upon execution of the Subcontract
(a) The Subcontract shall be deemed to have commenced on the date
hereof;
(b) This Letter of Intent shall be terminated; and
Page 2 of 3perreon see om
ENGINEERING LLC ss
‘Al Gassar Tower 12” Floor P.O, Box: 22861 Doha-Qatar C.R. No.: 38375
TEL: +974-4407-4665 Fak: +974-4407-4650
(c) All the Work performed by SUBCONTRACTOR hereunder by virtue of
this Letter of Intent shall be deemed to have been performed by
SUBCONTRACTOR under the Subcontract.
7], SUBCONTRACTOR shall not issue any press release, publicity or
information of any kind concerning this Letter of Intent or the
Work without prior written approval of Chiyoda-Almana.
8. SUBCONTRACTOR shall furnish Chiyoda~Almana the required Insurances
(Article 28 of the Subcontract General Terms and Conditions and
clarifications) and Performance Bond (Article 6 of the Subcontract
Agreement) before site mobiliz
9. This Letter of Intent shall be governed by and construed in
accordance with the laws of the State of Qatar. Any dispute
arising out of of in connection with this Letter of Intent
including any question regarding its existence, validity or
termination shall be referred to and finally resolved by
arbitration in Doha, Qatar (refer to clarifications). The
arbitration proceedings shall be conducted in the English
Language.
10. Please execute, stamp an
return one enclosed copy of this Letter
of Intent to the undersigned.
yours Faithfully,
Earns
SITCOA MANA BE
Jot HA, Maren Ds) y— some 1
EXIfeGS RiAtne Enotneering ute sa een a
Date:
cepted and Agreed to:
Mr, Mazen Abu Naba’a
Managing Director
Qatar Engineering and Construction Co. WLL
Date: