Download as pdf
Download as pdf
You are on page 1of 4
Qatar Engineering & Construction Company W.L.L Contract Department P.O Box 24491 Dena, Sats of Cater & Phone: 4458 7348, Fax: 4458 7201 Qcon MEMORANDUM From: Saad Rabbani To: P.K. Sankarankutty Ref: QconiContr/Memo/94/RMT/15 Date: 25° March 2015 ENo.E- 5EL6 Sub.: Subcontract No. RGP-SA-475-001; Site Preparation, Grading and Installation of Fencing on the Perimeter of the Facility. Dear Si Please find herewith attached the above mentioned subject Letter of Intent issued by Chiyoda Almana Engineering LLC, for your review and consent to the followings. SINo | Activity Description Comments. | Remarks 1 | Scope verification oe 2 ‘Schedule Verification FD BE AE —_ 3 | Price Verification ok “| Reviewed by ak Best regars, sundae Sr. Contracts Engineer Encl: A/a Received by: exrvonn aun om ENGINEERING LLC ‘Al Gasser Tower 12% Floor P.O, Box: 22961 Doha-Oatar C.R. No.: 38375 TEL: +974-4407-4665 Fax: +874-4407-4650 RasGas Long Term 2PCn Service Contract LETTER To: Me. Mazen Abu Naba’a Date : March 25, 2015 Managing Director Ref. No. RGP-475-L-CtQCon-0008 Job No. + RLO9133 Qatar Engineering and Construction Co. WEL (QCON) P.O. Box:24491, Doha-Qatar Tel:+974 4458 7219/7200 Fax: +974 4458 7201 Page No (s) : 3 Sent by () Fax (00 Handearry From: John H. A. Mooren Issued For : (X)Request Project Director Action/Reply Chiyeda-Almana Eng’g LLC ()Reply to your Doc. Doha-Qater ( )Information ( )For your Action Subject: LETTER OF INTENT IRGCP-475] Site Preparation, Grading and Installation of Fencing on the Perimeter of the Facility (RPS-128-001) REFERENCE: RGP-475-INQ-001 Gentlemen, a. Th is to inform you that we, Chiyoda-Almana Engineering LLC ereinafter called “Chiyoda-Almana”) are engaging you, Qatar Engineering and Construction Co. WL (hereinafter called “SUBCONTRACTOR”} as the preferred subcontractor for the site Preparation, Grading and Installation of Fencing on the Perimeter of the Facility. to be performed in Ras Laffan Industrial City, Qatar, for KasGas Company Limited (hereinafter called “COMPANY”) . 2. Time is of the essence and “SUBCONTRACTOR shall proceed with the necessary work immediately pending execution of the Subcontract. Chiyoda-Almana hereby authorizes SUBCONTRACTOR to commence the Work, starting from the date of this Letter of Intent so that the COMPLETION OF THE: WORK as defined in Article 1 of the Subcontract General Terms and Conditions shall be achieved.on or before the agreed Schedule (refer to Section-6, Work Schedule, of the Requisition and Addendum #2), that is, within 45 days from date of mobilization and approval of eCPw permit Page | of 3 eee om ENGINEERING LLC - ‘Al Gassar Tower 12% Floor P.O. Box! 22961 Doha-Qater C.R. No.: 38375 ‘TEL: +974-4407-4666 FAK: +974-4407-4650 3. The all-inclusive Fixed Lump Sum price of the Subcontract shall be United States Dollars Seven Hundred Fifty One Thousand Three Hundred Fifty One and Thirty Two Cents (US$ 751,351.32) only. ‘The Fixed Lump Sum Price shall not be subject to escalation nor nerease for any reason whatsoever unless otherwise specifically provided in the Subcontract. 4. The Subcontract shall be finalized based on the following documents: a) This Letter of Intent b) Draft Subcontract Agreement (RGP-SA~475-001) c) Subcontract General Terms and Conditions, Document | No. GTC-CAEL-001 Rev 1 dated 29 March 2011 d) Instructions to Subcontractors (RGP-475-ITS-001-B) e) Clarifications/Addendum, if any £) QCON’s Technical and Commercial Proposals dated st Decenber 2014 and subsequent clarifications g) Requisition No. RGP-475-R-00-001-B dated 16% October 2014. Tf there are any conflicts between any of the above mentioned documents, the documents shall have the priority in the above order. ‘The parties shall use their best efforts to have the Subcontract executed within thirty (30) days after the date of this Letter of Intent. If the parties fail to execute the Subcontract within such period, Chiyoda-Almana reserves the right to cancel this Letter of Intent at any time at Chiyoda~Almana’s absolute discretion, and upon receipt of Chiyoda-Almana’s written notice of cancellation, SUBCONTRACTOR shall discontinue the Work. However, in such case, SUBCONTRACTOR shall be reimbursed for all reasonable and duly substantiated costs and expenses actually incurred for the Work up to the date of termination: 6. Upon execution of the Subcontract (a) The Subcontract shall be deemed to have commenced on the date hereof; (b) This Letter of Intent shall be terminated; and Page 2 of 3 perreon see om ENGINEERING LLC ss ‘Al Gassar Tower 12” Floor P.O, Box: 22861 Doha-Qatar C.R. No.: 38375 TEL: +974-4407-4665 Fak: +974-4407-4650 (c) All the Work performed by SUBCONTRACTOR hereunder by virtue of this Letter of Intent shall be deemed to have been performed by SUBCONTRACTOR under the Subcontract. 7], SUBCONTRACTOR shall not issue any press release, publicity or information of any kind concerning this Letter of Intent or the Work without prior written approval of Chiyoda-Almana. 8. SUBCONTRACTOR shall furnish Chiyoda~Almana the required Insurances (Article 28 of the Subcontract General Terms and Conditions and clarifications) and Performance Bond (Article 6 of the Subcontract Agreement) before site mobiliz 9. This Letter of Intent shall be governed by and construed in accordance with the laws of the State of Qatar. Any dispute arising out of of in connection with this Letter of Intent including any question regarding its existence, validity or termination shall be referred to and finally resolved by arbitration in Doha, Qatar (refer to clarifications). The arbitration proceedings shall be conducted in the English Language. 10. Please execute, stamp an return one enclosed copy of this Letter of Intent to the undersigned. yours Faithfully, Earns SITCOA MANA BE Jot HA, Maren Ds) y— some 1 EXIfeGS RiAtne Enotneering ute sa een a Date: cepted and Agreed to: Mr, Mazen Abu Naba’a Managing Director Qatar Engineering and Construction Co. WLL Date:

You might also like