2) With the help of patch cord establish connections between corresponding terminals of TX & TR stators. i.e. connect S1 to S1 , S2to S2 and S3 to S3 of TX & TR stator respectively. 3) Switch on SW1 & SW2 as well as main of instrument. 4) Move the pointer (rotor position of TX in steps of 30 degrees and observe the new position of TR. 5) Enter the input angular position & output angular position in the tabulator from & plot the grap
Tabular column: Sr.No
Synchro Transmitter
Synchro Receiver
Result: - The Synchro Transmitter Receiver in pair or as an error detector was