Kandang Sapi 1 Row 135b Teknikal PDF

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

B

135,00

135,00

MINUM

135,00

135,00

135,00

PAKAN

MINUM

135,00

135,00

LIMBAH

MINUM

10

135,00

135,00

210,00

140.00

PAKAN

UTARA

560.00

135.00

PAKAN

A
100.00

350.00

MINUM

PAKAN

70.00

180,00

MINUM

370.00

220.00

100.00

PAKAN

270.00

135.00

MINUM

90,00

270.00

115.00

180.00

45.00

270.00

114.00

370.00

1550.00

DENAH KANDANG

30.00

TAMPAK BELAKANG

150.00

180.00

461.67

150.00

ATAP SENG GELOMBANG

00.

10 Nov 09

No.
Title

Date

Initial drawing
Revision

KANDANG PENGGEMUKAN
SAPI POTONG
INTENSIF, KAPASITAS 10 EKOR

TAMPAK DEPAN

Location

Karangkepoh, Desa Gondoriyo Jambu


AMBARAWA

Project period
TIANG / KOLOM BETON

150.00

180.00

TIANG / KOLOM BETON


110.00
80.00

Project owner

Drawn by

KEMIRINGAN LANTAI 70

115.00
135.00
220.00
350.00

55.00

90.00

70.00

140.00
210.00

220.00

PALANG PEMBATAS
TERNAK

PALANG PAKAN

44.00

PALANG PAKAN

15 Nov 09

Reviewed by
Approvals

560.00

POTONGAN A - A

POTONGAN B - B
kandang sapi 1 row 135b teknikal.vsd/ph

You might also like