Pipelines
o Field production gathering and injection pipeline network
o Export Pipelines
o Water supply and disposal pipelines
Block Valves (2 Nos) to be located in the existing block valve station of gas
export line
Cathodic Protection for all buried pipelines
Permanent Pig Trap facilities for Production lines and Water injection lines
Mobile/ Permanent Pig trap facilities for gas injection lines
Baseline intelligent pig survey of the production, export oil, export gas, gas
injection and water injection lines.
Pre-engineering survey (topo, bathy, geothecnical, and marine survey)
Track, road, rig, highway, railway crossings. The crossings shall be
constructed by micro tunneling/ thrust boring/ HDD/ Open cut.
PIMS