Contoh Analisa SNI
4.
1 m1
Pengukuran dan pemasangan bouwplank
1 Bahan
- Kayu Kls II 5/7, Balok
0.012 M3 x Rp.
- Paku Biasa 2" - 5"
0.020 Kg x Rp.
- Kayu Papan 3/20
0.007 M3 x Rp.
2.
Tenaga
- Tukang Kayu
- Pekerja
- Kepala Tukang
- Mandor
0.100
0.100
0.010
0.005
5,535,000.00
13,284.00
5,756,400.00
Jumlah I
=
=
=
=
Rp.
Rp.
Rp.
Rp.
66,420.00
265.68
40,294.80
106,980.48
50,000.00
25,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,000.00
2,500.00
600.00
175.00
8,275.00
115,255.48
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
1 m3
Galian tanah biasa sedalam 1 meter
1. Tenaga
- Pekerja
0.400 Oh
- Tukang Gali
0.000 Oh
- Kepala Tukang
0.000 Oh
- Mandor
0.040 Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
10,000.00
1,400.00
11,400.00
1 m3
Urugan kembali
1. Tenaga
- Pekerja
- Tukang Gali
- Kepala Tukang
- Mandor
x
x
x
x
Rp.
Rp.
Rp.
Rp.
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
4,800.00
665.00
5,465.00
39,745.00 = Rp.
Jumlah I = Rp.
47,694.00
47,694.00
PEKERJAAN TANAH
An. II.1
An.II.2
An.II.3
Tenaga
- Pekerja
- Tukang Gali
- Kepala Tukang
- Mandor
1 m3
Urugan pasir
1. Bahan
- Pasir Urug
0.300
0.000
0.000
0.010
Oh
Oh
Oh
Oh
x Rp.
x
x
x
x
Rp.
Rp.
Rp.
Rp.
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
1.200 M3
x Rp.
Tenaga
- Pekerja
- Tukang Gali
- Kepala Tukang
- Mandor
0.300 Oh
Oh
Oh
0.010 Oh
x
x
x
x
1 m3
Urugan Kerikil
1. Bahan
- Kerikil
1.200 M3
x Rp.
0.300 Oh
Oh
Oh
0.010 Oh
x
x
x
x
2.
An.II.5
Oh
Oh
Oh
Oh
1 m3
Urugan Timbunan Tanah Pilihan
1. Bahan
- Tanah Timbunan
1.200 M3
2.
An.II.4
0.192
0.000
0.000
0.019
2.
Tenaga
- Pekerja
- Tukang Gali
- Kepala Tukang
- Mandor
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
7,500.00
350.00
7,850.00
55,544.00
145,410.00 = Rp.
Jumlah I = Rp.
174,492.00
174,492.00
Rp.
Rp.
Rp.
Rp.
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
Rp.
Rp.
Rp.
Rp.
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
7,500.00
350.00
7,850.00
182,342.00
416,625.00 = Rp.
Jumlah I = Rp.
499,950.00
499,950.00
25,000.00
50,000.00
60,000.00
35,000.00
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
7,500.00
350.00
Jumlah II = Rp.
Jumlah I + Jumlah II = Rp.
An.II.6
1 m3
Pemasangan Lapisan Ijuk
1. Bahan
- Ijuk
2.
Tenaga
- Pekerja
- Tukang Gali
- Kepala Tukang
- Mandor
1.200 M3
x Rp.
0.150 Oh
Oh
Oh
0.015 Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
110,700.00 = Rp.
Jumlah I = Rp.
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
7,850.00
507,800.00
132,840.00
132,840.00
3,750.00
525.00
4,275.00
137,115.00
1 m3
Pasang pondasi batu kosong
1. Bahan
- Batu Gunung
1.200 M3
- Pasir urug
0.300 M3
2.
An.III.a.2
0.780
0.390
0.039
0.039
Oh
Oh
Oh
Oh
x
x
x
x
Tenaga
- Pekerja
- Tukang Batu
- Kepala Tukang
- Mandor
1.500
0.600
0.060
0.075
Oh
Oh
Oh
Oh
1 m2
Plesteran 1 Pc : 2 Ps, tebal 20 mm
1. Bahan
- Semen portland
14.280 Kg
- Pasir pasang
0.023 M3
2.
Tenaga
- Pekerja
- Tukang Batu
- Kepala Tukang
- Mandor
0.250
0.200
0.020
0.0125
Oh
Oh
Oh
Oh
x
x
x
x
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
102,030.00
43,623.00
145,653.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
19,500.00
19,500.00
2,340.00
1,365.00
42,705.00
188,358.00
85,025.00
940.37
195,225.00
Jumlah I
=
=
=
=
Rp.
Rp.
Rp.
Rp.
93,527.50
153,280.11
101,517.00
348,324.61
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
37,500.00
30,000.00
3,600.00
2,625.00
73,725.00
422,049.61
940.37 = Rp.
195,225.00 = Rp.
Jumlah I = Rp.
13,428.47
4,490.175
17,918.64
Rp.
Rp.
Rp.
Rp.
x Rp.
x Rp.
x
x
x
x
85,025.00 = Rp.
145,410.00 = Rp.
Jumlah I = Rp.
Rp.
Rp.
Rp.
Rp.
1 m3
Pasang pondasi batu Gunung, 1 Pc : 4 Ps
1. Bahan
- Batu Gunung
1.100 M3 x Rp.
- Semen portland
163.000 Kg x Rp.
- Pasir pasang
0.520 M3 x Rp.
2.
An.III.a.3
Tenaga
- Pekerja
- Tukang Batu
- Kepala Tukang
- Mandor
x Rp.
x Rp.
Rp.
Rp.
Rp.
Rp.
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,250.00
10,000.00
1,200.00
437.50
17,887.50
35,806.14
720.55
940.37
195,225.00
Jumlah
=
=
=
=
Rp.
Rp.
Rp.
Rp.
50,438.500
17,819.99
7,418.550
75,677.04
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah
Jumlah I + Jumlah II
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
8,000.00
5,000.00
600.00
525.00
14,125.00
89,802.04
1 m2
Pasangan bata merah tebal bata, 1 Pc : 2 Ps
1. Bahan
- Bata merah 5 x 11 x 22
70.000 Bh x Rp.
- Semen portland
18.950 Kg x Rp.
- Pasir pasang
0.038 M3 x Rp.
2.
Tenaga
- Pekerja
- Tukang Batu
- Kepala Tukang
- Mandor
0.320
0.100
0.010
0.015
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
An.III.b.2
1 m2
Pasangan bata merah tebal bata, 1 Pc : 4 Ps
1. Bahan
- Bata merah 5 x 11 x 22
70.000 Bh x Rp.
- Semen portland
11.500 Kg x Rp.
- Pasir pasang
0.043 M3 x Rp.
2.
An.III.b.3
0.320
0.100
0.010
0.015
Oh
Oh
Oh
Oh
1 m2
Plesteran 1 Pc : 2 Ps, tebal 15 mm
1. Bahan
- Semen portland
8.520 Kg
- Pasir pasang
0.017 M3
2.
An.III.b.4
Tenaga
- Pekerja
- Tukang Batu
- Kepala Tukang
- Mandor
Tenaga
- Pekerja
- Tukang Batu
- Kepala Tukang
- Mandor
0.200
0.150
0.015
0.010
Oh
Oh
Oh
Oh
1 m2
Plesteran 1 Pc : 4 Ps, tebal 15 mm
1. Bahan
- Semen portland
5.200 Kg
- Pasir pasang
0.020 M3
2.
Tenaga
- Pekerja
- Tukang Batu
- Kepala Tukang
- Mandor
0.200
0.150
0.015
0.010
Oh
Oh
Oh
Oh
x
x
x
x
720.55
940.37
195,225.00
Jumlah
=
=
=
=
Rp.
Rp.
Rp.
Rp.
50,438.500
10,814.24
8,394.675
69,647.42
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah
Jumlah I + Jumlah II
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
8,000.00
5,000.00
600.00
525.00
14,125.00
83,772.42
940.37 = Rp.
195,225.00 = Rp.
Jumlah I = Rp.
8,011.94
3,318.825
11,330.77
Rp.
Rp.
Rp.
Rp.
x Rp.
x Rp.
x
x
x
x
Rp.
Rp.
Rp.
Rp.
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
x Rp.
x Rp.
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,000.00
7,500.00
900.00
350.00
13,750.00
25,080.77
940.37 = Rp.
195,225.00 = Rp.
Jumlah I = Rp.
4,889.92
3,904.500
8,794.42
Rp.
Rp.
Rp.
Rp.
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,000.00
7,500.00
900.00
350.00
13,750.00
22,544.42
940.37
195,225.00
417,625.00
Jumlah I
=
=
=
=
Rp.
Rp.
Rp.
Rp.
315,963.92
105,421.50
338,276.25
759,661.67
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
17,500.00
2,100.00
35,000.00
104,600.00
864,261.67
1 m3
Membuat beton bertulang, 1Pc : 2 Ps : 3 Kr
1. Bahan
- Semen portland
336.000 Kg x Rp.
- Pasir beton
0.540 M3 x Rp.
- Koral beton
0.810 M3 x Rp.
2.
Tenaga
- Pekerja
- Tukang batu
- Kepala Tukang
- Mandor
2.000
0.350
0.035
1.000
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
An.III.c.2
2.
An.III.c.3
Oh
Oh
Oh
Oh
Tenaga
- Pekerja
- Tukang kayu
- Kepala Tukang
- Mandor
x
x
x
x
Oh
Oh
Oh
Oh
x
x
x
x
1 m2
Pasang bekisting untuk kolom
1. Bahan
- Kayu mal kls III
0.040
- Paku biasa 2" - 5"
0.400
- Minyak bekisting
0.200
- Balok kayu kls III
0.015
- Dolken kayu galam -8-10/4 m 2.000
M3
Kg
Lt
M3
Btg
x
x
x
x
x
Tenaga
- Pekerja
- Tukang kayu
- Kepala Tukang
- Mandor
0.300
0.330
0.003
0.006
Oh
Oh
Oh
Oh
x
x
x
x
1 m2
Pasang bekisting untuk balok
1. Bahan
- Kayu mal kls III
0.040
- Paku biasa 2" - 5"
0.400
- Minyak bekisting
0.200
- Balok kayu kls III
0.018
- Dolken kayu galam -8-10/4 m 2.000
M3
Kg
Lt
M3
Btg
x
x
x
x
x
2.
Tenaga
- Pekerja
- Tukang kayu
- Kepala Tukang
- Mandor
0.320
0.330
0.033
0.006
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
x
x
x
x
17,435.25
199.26
17,634.51
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
175.00
350.00
42.00
10.50
577.50
18,212.01
1,660,500.00
13,284.00
16,605.00
Jumlah I
=
=
=
=
Rp.
Rp.
Rp.
Rp.
74,722.50
3,985.20
1,660.50
80,368.20
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
7,500.00
13,000.00
1,560.00
175.00
22,235.00
102,603.20
1,660,500.00
13,284.00
16,605.00
1,660,500.00
83,025.00
Jumlah I
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
66,420.00
5,313.60
3,321.00
24,907.50
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
7,500.00
16,500.00
198.00
210.00
24,408.00
124,370.10
1,660,500.00 x Rp.
13,284.00 x Rp.
16,605.00 x Rp.
1,660,500.00 = Rp.
83,025.00 = Rp.
Jumlah I = Rp.
66,420.00
5,313.60
3,321.00
29,889.00
x Rp.
x Rp.
x Rp.
0.300
0.260
0.026
0.005
2.
An.III.c.5
0.007
0.007
0.0007
0.0003
1 m2
Pasang bekisting untuk sloof
1. Bahan
- Kayu mal kls III
0.045 M3
- Paku biasa 2" - 5"
0.300 Kg
- Minyak bekisting
0.100 Lt
2.
An.III.c.4
Tenaga
- Pekerja
- Tukang besi
- Kepala Tukang
- Mandor
16,605.00 = Rp.
13,284.00 = Rp.
Jumlah I = Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
99,962.10
104,943.60
8,000.00
16,500.00
1,980.00
210.00
26,690.00
131,633.60
d. Pekerjaan Lantai
An.III.d.1
1 m3
Membuat beton tumbuk, 1Pc : 3 Ps : 5 Kr
1. Bahan
- Semen portland
218.000 Kg x Rp.
- Pasir beton
0.520 M3 x Rp.
- Koral beton
0.870 M3 x Rp.
2.
An.III.d.2
=
=
=
=
Rp.
Rp.
Rp.
Rp.
205,000.40
101,517.00
363,333.75
669,851.15
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
41,250.00
12,500.00
1,500.00
2,800.00
58,050.00
727,901.15
4,226.73
47,018.44
195,225.00
1,328.40
Jumlah I
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
46,494.00
535,069.85
8,199.45
1,992.60
591,755.90
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
15,500.00
17,500.00
2,100.00
1,050.00
36,150.00
627,905.90
2,767.50
47,018.44
195,225.00
1,328.40
Jumlah I
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
69,187.50
535,069.85
8,199.45
1,992.60
614,449.40
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
15,500.00
17,500.00
2,100.00
1,050.00
36,150.00
650,599.40
1.650
0.250
0.025
0.080
Oh
Oh
Oh
Oh
x
x
x
x
1 m2
Pasang lantai keramik 30 x 30 cm
1. Bahan
- Ubin keramik 30 x 30 cm
11.000
- Semen portland
11.380
- Pasir pasang
0.042
- Semen warna
1.500
Bh
Kg
M3
Kg
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
25.000
11.380
0.042
1.500
Bh
Kg
M3
Zak
x
x
x
x
Rp.
Rp.
Rp.
Rp.
0.620
0.350
0.035
0.030
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
2.
An.III.d.3
Tenaga
- Pekerja
- Tukang batu
- Kepala Tukang
- Mandor
940.37
195,225.00
417,625.00
Jumlah I
Tenaga
- Pekerja
- Tukang batu
- Kepala Tukang
- Mandor
1 m2
1.
2.
0.620
0.350
0.035
0.030
Rp.
Rp.
Rp.
Rp.
Ubin keramik 20 x 20 cm
Semen portland
Pasir pasang
Semen warna
Tenaga
- Pekerja
- Tukang batu
- Kepala Tukang
- Mandor
An.IV.a.2
1 m3
Pasang konstruksi kuda-kuda kayu
1. Bahan
- Kayu Kls I jenis Ulin, balok
1.100 M3 x Rp. 9,409,500.00
- Kayu Kls II jenis Kapur, balo
1.100 M3 x Rp. 5,535,000.00
- Paku biasa 2" -5"
0.800 Lbr x Rp.
13,284.00
Jumlah I Untuk Kayu Kls I
Jumlah I Untuk Kayu Kls II
2. Tenaga
- Pekerja
4.000 Oh x Rp.
25,000.00
- Tukang kayu
12.000 Oh x Rp.
50,000.00
- Kepala Tukang
1.200 Oh x Rp.
60,000.00
- Mandor
0.200 Oh x Rp.
35,000.00
Jumlah II
Jumlah I + Jumlah II untuk kayu Kls I
Jumlah I + Jumlah II untuk kayu Kls II
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
10,350,450.00
6,088,500.00
10,627.20
10,361,077.20
6,099,127.20
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
100,000.00
600,000.00
72,000.00
7,000.00
779,000.00
11,140,077.20
6,878,127.20
1 m1
Pasang lisplang ukuran 2 x (2 x 20) cm, kayu Ulin
1. Bahan
- Kayu Ulin, papan
0.0088 M3 x Rp. 9,963,000.00 = Rp.
- Paku biasa 2" -5"
0.060 Kg x Rp.
13,284.00 = Rp.
Jumlah I = Rp.
87,674.40
797.04
88,471.44
2.
An.IV.a.3
0.100
0.100
0.010
0.050
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
1 m2
Pasang atap seng gelombang BJLS 0.25
1. Bahan
- Seng gelombang bjls 0.25
0.700 Lbr x Rp.
- Paku Seng
0.020 Kg x Rp.
2.
An.IV.a.4
Tenaga
- Pekerja
- Tukang kayu
- Kepala Tukang
- Mandor
Tenaga
- Pekerja
- Tukang kayu
- Kepala Tukang
- Mandor
1 m2
Pasang atap nok seng
1. Bahan
- Seng plat bjls 28
- Paku Seng
2.
Tenaga
- Pekerja
- Tukang kayu
- Kepala Tukang
- Mandor
0.120
0.060
0.006
0.006
Oh
Oh
Oh
Oh
x
x
x
x
Oh
Oh
Oh
Oh
x
x
x
x
2,500.00
5,000.00
600.00
1,750.00
9,850.00
98,321.44
44,280.00 = Rp.
15,498.00 = Rp.
Jumlah I = Rp.
30,996.00
309.96
31,305.96
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
0.150
0.070
0.008
0.006
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,000.00
3,000.00
360.00
210.00
6,570.00
37,875.96
55,903.50 = Rp.
15,498.00 = Rp.
Jumlah I = Rp.
16,771.05
619.92
17,390.97
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,750.00
3,500.00
480.00
210.00
7,940.00
25,330.97
b. Pekerjaan Plafond
An.IV.b.1
1 m2
Pasang langit-langit (1.00 x 1.00) m, rangka kayu kls.II
1. Bahan
- Kayu kls II, balok
0.012 M3 x Rp. 5,535,000.00
- Paku biasa 2" -5"
0.060 Kg x Rp.
13,284.00
Asbes Eternit 1 x 1
1.100 Kg x Rp.
11,623.50
Jumlah I
2.
An.IV.b.2
0.180
0.320
0.032
0.090
Oh
Oh
Oh
Oh
x
x
x
x
Tenaga
- Pekerja
- Tukang kayu
- Kepala Tukang
- Mandor
1 m1
List Plafond kayu kls II
1. Bahan
- List kayu
- Paku lis
2.
Tenaga
- Pekerja
- Tukang kayu
- Kepala Tukang
- Mandor
0.030
0.070
0.007
0.0015
Oh
Oh
Oh
Oh
x
x
x
x
66,420.00
797.04
12,785.85
80,002.89
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,500.00
16,000.00
1,920.00
3,150.00
25,570.00
105,572.89
11,623.50 = Rp.
15,498.00 = Rp.
Jumlah I = Rp.
12,785.85
154.98
12,940.83
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
Rp.
Rp.
Rp.
Rp.
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
1.100 M
0.010 Kg
x Rp.
x Rp.
0.050
0.050
0.005
0.003
x
x
x
x
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1 m2
Langit-langit asbes (1,00 x 1,00) m, tebal 4 mm
1. Bahan
- Pelat asbes tebal 4 mm
1.100 Lbr x Rp.
- Paku Asbes
0.010 Kg x Rp.
2.
An.IV.b.3
Tenaga
- Pekerja
- Tukang kayu
- Kepala Tukang
- Mandor
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
750.00
3,500.00
420.00
52.50
4,722.50
17,663.33
6,088.50 = Rp.
15,498.00 = Rp.
Jumlah I = Rp.
6,697.35
154.98
6,852.33
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,250.00
2,500.00
300.00
105.00
4,155.00
11,007.33
1 m3
Pasang kusen pintu dan jendela Kayu Kls I Bayam
1. Bahan
- Kayu Bayam, balok
1.200 M3 x Rp. 9,077,400.00 = Rp.
Jumlah I = Rp.
2.
An.IV.c.2
6.000
18.000
2.000
0.300
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
1 m2
Pasang jalusi mati kusen kayu kls I Ulin
1. Bahan
- Kayu kls I, papan
0.020 M3 x Rp.
- Paku biasa 2 - 5 cm
0.150 Kg x Rp.
2.
An.IV.c.3
Tenaga
- Pekerja
- Tukang kayu
- Kepala Tukang
- Mandor
Tenaga
- Pekerja
- Tukang kayu
- Kepala Tukang
- Mandor
0.500
2.000
0.200
0.025
Oh
Oh
Oh
Oh
x
x
x
x
Tenaga
- Pekerja
- Tukang kayu
- Kepala Tukang
- Mandor
0.800
2.000
0.200
0.040
Oh
Oh
Oh
Oh
x
x
x
x
150,000.00
900,000.00
120,000.00
10,500.00
1,180,500.00
12,073,380.00
9,963,000.00 = Rp.
13,284.00 = Rp.
Jumlah I = Rp.
199,260.00
1,992.60
201,252.60
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
1 m2
Pasang Daun jendela kaca kayu Kls I (2x7)cm
1. Bahan
- Kayu kls I, papan
0.035 M3 x Rp.
2.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
12,500.00
100,000.00
12,000.00
875.00
125,375.00
326,627.60
9,963,000.00 = Rp.
Jumlah I = Rp.
348,705.00
348,705.00
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
1 m2
pasang kaca, tebal 5 mm
1. Bahan
- Kaca
2.
Tenaga
- Pekerja
- Tukang kayu
- Kepala Tukang
- Mandor
1.100 M2
0.015
0.150
0.015
0.00075
Oh
Oh
Oh
Oh
x Rp.
x
x
x
x
Rp.
Rp.
Rp.
Rp.
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
20,000.00
100,000.00
12,000.00
1,400.00
133,400.00
= Rp.
482,105.00
99,630.00 = Rp.
Jumlah I = Rp.
109,593.00
109,593.00
Jumlah I + Jumlah II
An.IV.c.4
=
=
=
=
=
=
10,892,880.00
10,892,880.00
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
375.00
7,500.00
900.00
26.25
8,801.25
118,394.25
An.IV.c.5
1 m2
Pasang pintu panel kayu kelas I
1. Bahan
- Kayu Ulin, papan
0.040 M3
2.
An.IV.c.6
Tenaga
- Pekerja
- Tukang kayu
- Kepala Tukang
- Mandor
1.000
2.500
0.250
0.050
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
25,000.00
125,000.00
15,000.00
1,750.00
166,750.00
565,270.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
107,932.50
15,621.98
1,328.40
124,882.88
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,750.00
22,500.00
2,700.00
2,625.00
31,575.00
156,457.88
49,815.00 = Rp.
Jumlah I = Rp.
49,815.00
49,815.00
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
398,520.00
398,520.00
=
=
=
=
=
=
0.150
0.450
0.045
0.075
x
x
x
x
9,963,000.00 = Rp.
Jumlah I = Rp.
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
2. Tenaga
- Pekerja
- Tukang kayu
- Kepala Tukang
- Mandor
Oh
Oh
Oh
Oh
x Rp.
Rp.
Rp.
Rp.
Rp.
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
2.
An.IV.d.2
2.
An.IV.d.3
Tenaga
- Pekerja
- Tukang kayu
- Kepala Tukang
- Mandor
Tenaga
- Pekerja
- Tukang kayu
- Kepala Tukang
- Mandor
1.000 Bh
x Rp.
0.010
0.500
0.010
0.005
x
x
x
x
Oh
Oh
Oh
Oh
1.000 Bh
0.015
0.150
0.015
0.00075
Oh
Oh
Oh
Oh
2.
Tenaga
- Pekerja
- Tukang kayu
- Kepala Tukang
- Mandor
0.010
0.100
0.010
0.0005
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
x Rp.
x
x
x
x
250.00
25,000.00
600.00
175.00
26,025.00
75,840.00
5,535.00 = Rp.
Jumlah I = Rp.
5,535.00
5,535.00
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
x Rp.
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
375.00
7,500.00
900.00
26.25
8,801.25
14,336.25
4,428.00 = Rp.
Jumlah I = Rp.
4,428.00
4,428.00
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
250.00
5,000.00
600.00
17.50
5,867.50
10,295.50
An.IV.d.4
2.
Tenaga
- Pekerja
- Tukang kayu
- Kepala Tukang
- Mandor
1.000 Bh
0.015
0.150
0.015
0.00075
Oh
Oh
Oh
Oh
x Rp.
x
x
x
x
Rp.
Rp.
Rp.
Rp.
7,195.50 = Rp.
Jumlah I = Rp.
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Rp.
Rp.
Rp.
Rp.
Rp.
375.00
7,500.00
900.00
26.25
8,801.25
= Rp.
15,996.75
3,874.50 = Rp.
Jumlah I = Rp.
3,874.50
3,874.50
Jumlah I + Jumlah II
An.IV.d.5
2.
An.IV.d.6
Tenaga
- Pekerja
- Tukang kayu
- Kepala Tukang
- Mandor
2.
Tenaga
- Pekerja
- Tukang kayu
- Kepala Tukang
- Mandor
1.000 Bh
0.050
0.500
0.050
0.0025
Oh
Oh
Oh
Oh
x Rp.
x
x
x
x
Rp.
Rp.
Rp.
Rp.
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
1.000 Bh
x Rp.
0.020
0.200
0.020
0.001
x
x
x
x
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
=
=
=
=
=
7,195.50
7,195.50
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,250.00
25,000.00
3,000.00
87.50
29,337.50
33,212.00
2,214.00 = Rp.
Jumlah I = Rp.
2,214.00
2,214.00
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
500.00
10,000.00
1,200.00
35.00
11,735.00
13,949.00
1 m2
1.
2.
An.V.2
1 m2
1.
2.
An.V.3
0.300 Kg
x Rp.
Tenaga
- Pekerja
- Tukang cat
- Kepala Tukang
- Mandor
0.006
0.060
0.012
0.006
x
x
x
x
Oh
Oh
Oh
Oh
15,221.25 = Rp.
Jumlah I = Rp.
Rp.
Rp.
Rp.
Rp.
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
=
=
=
=
=
=
4,566.38
4,566.38
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
150.000
3,000.000
720.000
210.000
4,080.00
8,646.38
12,177.00 = Rp.
12,177.00 = Rp.
Jumlah I = Rp.
1,461.24
2,191.86
3,653.10
Tenaga
- Pekerja
- Tukang cat
- Kepala Tukang
- Mandor
0.120 Kg
0.180 Kg
1 m2
Pengecatan plafond (1 lapis cat dasar, 2 lapis cat penutup)
1. Bahan
- Cat dasar
0.120 Kg x Rp.
12,177.00 = Rp.
- Cat penutup 2 x
0.180 Kg x Rp.
12,177.00 = Rp.
Jumlah I = Rp.
1,461.24
2,191.86
3,653.10
Tenaga
- Pekerja
- Tukang cat
- Kepala Tukang
- Mandor
0.028
0.042
0.0042
0.0025
0.028
0.042
0.0042
0.0025
Oh
Oh
Oh
Oh
x Rp.
x Rp.
700.000
2,100.000
252.000
87.500
3,139.50
6,792.60
Oh
Oh
Oh
Oh
x
x
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
Rp.
Rp.
Rp.
Rp.
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
700.000
2,100.000
252.000
87.500
3,139.50
6,792.60
1 m2
pengecatan bidang kayu (1 lapis Plamir, 1 lapis cat dasar, 2 lapis cat penutup)
1. Bahan
- Plamir
0.150 Kg x Rp.
5,535.00 = Rp.
830.25
- Cat dasar
0.170 Kg x Rp.
32,103.00 = Rp.
5,457.51
- Cat penutup 2 kali
0.170 Kg x Rp.
32,103.00 = Rp.
5,457.51
Jumlah I = Rp.
11,745.27
2.
An.V.5
Bahan
- Cat Seng
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2.
An.V.4
pengecatan permukaan baja lapis seng (galbani) secara manual sistem 2 lapis
Tenaga
- Pekerja
- Tukang cat
- Kepala Tukang
- Mandor
0.070
0.075
0.008
0.0025
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
1 m2
pelaburan bidang kayu dengan cat residu dan ter
1. Bahan
- Residu atau ter
0.350 Ltr x Rp.
2.
Tenaga
- Pekerja
0.100 Oh x Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,750.00
3,750.00
450.00
87.50
6,037.50
17,782.77
5,535.00 = Rp.
Jumlah I = Rp.
1,937.25
1,937.25
25,000.00
=
=
=
=
=
=
= Rp.
2,500.000
- Tukang cat
- Kepala Tukang
- Mandor
Oh x Rp.
Oh x Rp.
0.006 Oh x Rp.
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
210.000
2,710.00
4,647.25
PEKERJAAN SANITASI
An.VI.1
2.
-
An.VI.2
2.
-
An.VI.3
Tenaga
Pekerja
Tukang batu
Kepala Tukang
Mandor
Tenaga
Pekerja
Tukang batu
Kepala Tukang
Mandor
1.000 Bh
x Rp.
0.010
0.100
0.010
0.005
x
x
x
x
Oh
Oh
Oh
Oh
Tenaga
Pekerja
Tukang batu
Kepala Tukang
Mandor
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
250.00
5,000.00
600.00
175.00
6,025.00
22,630.00
99,630.00
47,018.44
195,225.00
Jumlah I
=
=
=
=
Rp.
Rp.
Rp.
Rp.
99,630.00
282,110.64
1,952.25
383,692.89
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
25,000.00
75,000.00
18,000.00
3,850.00
121,850.00
505,542.89
= Rp.
= Rp.
Jumlah I = Rp.
24,243.30
707.10
24,950.40
1.000
1.500
0.300
0.110
x
x
x
x
0.081
0.135
0.0135
0.0041
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
x Rp.
x
x
x
x
16,605.00
16,605.00
=
=
=
=
=
=
x Rp.
x Rp.
x Rp.
2.
-
Rp.
Rp.
Rp.
Rp.
1.000 Bh
6.000 Kg
0.010 M3
Oh
Oh
Oh
Oh
16,605.00 = Rp.
Jumlah I = Rp.
Rp.
Rp.
Rp.
Rp.
20,202.75
25,000.00
50,000.00
60,000.00
35,000.00
Jumlah II
Jumlah I + Jumlah II
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,025.00
6,750.00
810.00
143.50
9,728.50
34,678.90
No.
TENAGA KERJA
SATUAN
3
Harga Dasar
(Rp)
4
(Rp)
Mandor
Orang/Hari
35,000.00
35,000.00
Tukang Kepala
Orang/Hari
50,000.00
60,000.00
Tukang
Orang/Hari
40,000.00
50,000.00
Pekerja
Orang/Hari
25,000.00
25,000.00
Bahan Bangunan
Satuan
A. Bahan Dasar
1
Batu Gunung
2
Batu Belah 2 - 3 cm
3
Pasir Urug
4
P a s i r
5
Kerikil
6
Timbunan Pilihan
7
Batu Bata
8
Kapur Bakar
9
Kapur Pasangan
10
Bambu
11
Ijuk
(Rp)
4
Tamb. Gol. C
(Rp)
5
75,000.00
375,000.00
130,000.00
175,000.00
375,000.00
35,000.00
650.00
2,500.00
2,500.00
10,000.00
100,000.00
2,000.00
2,500.00
1,500.00
1,500.00
1,500.00
1,000.00
1.00
kg
920.00
46,000.00
kg
900.00
kg
kg
kg
C. Bahan Besi
1
Besi Tulangan Beton
2
Kawat Beton
3
Kawat Ram
4
Kawat Duri
5
Mur/Baut diameter 20 mm
6
Mur/Baut diameter 25 mm
7
Mur/Baut diameter 18 mm
8
Mur/Baut diameter 10 mm
9
Beugel U. 40.4 mm
10
Beugel Strip 40.4 mm
11
Paku Gording Panjang > 5 cm
12
Paku biasa 6 - 10 cm
13
Paku Biasa 2 - 5 cm
14
Paku Seng Biasa
15
Paku Beton
16
Paku asbes
17
Paku Les
18
Terali Naco (Besi Batangan)
19
Rangka Naco/batang
D. Bahan Lantai dan Dinding
1
Tegel keramik warna 40 x 40 cm
2
Tegel Keramik 30 x 30 cm (Polos) KIA
3
Tegel Keramik 20 x 20 cm (Alur) KIA
4
Tegel Keramik 20 x 20 cm (Polos)
5
Tegel ubin warna 20x 20 cm
6
Tegel plint 10 x 30
7
Paving Blok tebal 6 cm
8
Teakwood 120 x 240 cm tebal 3 mm
9
Loster
10
Tripleks biasa 3 mm
B. Bahan Semen
1
Portland Cement PC (@ 50 kh/zak)
2
- Merk tonasa
3
4
5
6
7
- Merk Bosowa
Portland Cement PC (@ 40 kh/zak)
- Merk tonasa
- Merk Bosowa
Semen putih (@ 50 kg/zak)
m3
m3
m3
m3
m3
m3
buah
m3
kg
btg
m3
Harga Dasar
Retribusi/
IMB (Rp)
6
Lansiran/Transpor Jasa 10 %
t ( RP)
(Rp)
7
8
525.00
2,625.00
910.00
1,225.00
2,625.00
245.00
4.55
17.50
17.50
70.00
700.00
7,500.00
37,500.00
13,000.00
17,500.00
37,500.00
3,500.00
65.00
250.00
250.00
1,000.00
10,000.00
6.44
92.00
700.00
663.00
1,200.00
6.30
4.90
4.64
8.40
90.00
70.00
66.30
120.00
kg
kg
m2
roll
bh
bh
bh
bh
bh
bh
kg
kg
kg
kg
bh
kg
kg
btg
daun
15,000.00
12,000.00
25,500.00
80,500.00
5,000.00
7,000.00
4,500.00
3,000.00
7,500.00
5,500.00
15,000.00
13,000.00
12,000.00
14,000.00
800.00
14,000.00
14,000.00
21,000.00
12,000.00
105.00
84.00
178.50
563.50
35.00
49.00
31.50
21.00
52.50
38.50
105.00
91.00
84.00
98.00
5.60
98.00
98.00
147.00
84.00
1,500.00
1,200.00
2,550.00
8,050.00
500.00
700.00
450.00
300.00
750.00
550.00
1,500.00
1,300.00
1,200.00
1,400.00
80.00
1,400.00
1,400.00
2,100.00
1,200.00
bh
bh
bh
m2
bh
bh
/ biji
lbr
bh
lbr
9,700.00
3,818.18
2,500.00
47,500.00
1,800.00
1,500.00
2,000.00
42,500.00
20,000.00
42,000.00
67.90
26.73
17.50
332.50
12.60
10.50
14.00
297.50
140.00
294.00
970.00
381.82
250.00
4,750.00
180.00
150.00
200.00
4,250.00
2,000.00
4,200.00
E. Bahan Kayu
1
Kayu Kelas I Jenis Ulin
- Balok
- papan
2
Kayu Kelas I Jenis Bayam
- Balok
- papan
3
Kayu Kelas II Jenis Kapur
- Balok
- papan
3
Kayu Kelas III
- Balok
- papan
4
Kayu untuk perancah
5
Kayu Dolken / Batang 4 m
6
Les Kayu Plafond 1 x 4 cm Kelas II
7
Papan Pelapi Kelas III
m3
m3
8,500,000.00
9,000,000.00
59,500.00
63,000.00
850,000.00
900,000.00
m3
m3
8,200,000.00
8,700,000.00
57,400.00
60,900.00
820,000.00
870,000.00
m3
m3
5,000,000.00
5,200,000.00
35,000.00
36,400.00
500,000.00
520,000.00
m3
m3
m3
btg
m'
m3
1,500,000.00
1,500,000.00
2,100,000.00
75,000.00
5,500.00
2,300,000.00
10,500.00
10,500.00
14,700.00
525.00
38.50
16,100.00
150,000.00
150,000.00
210,000.00
7,500.00
550.00
230,000.00
F. Bahan Atap
1
Seng Gelombang BWG 32" BJLS 0.25 mm
2
Seng BWG 33" BJLS 0,20 mm
3
Bubungan seng 90 x 180
4
Seng Plat BWG 28"
5
Seng Gelombang BWG 33"
6
Karet Talang
7
Multi roof
8
Nok multi roof
9
Surya roof
10
Nok surya roof
lbr
kaki
lbr
lbr
kaki
m
lbr
lbr
lbr
lbr
40,000.00
5,500.00
35,000.00
50,500.00
5,750.00
280.00
38.50
245.00
353.50
40.25
4,000.00
550.00
3,500.00
5,050.00
575.00
45,000.00
40,000.00
37,000.00
37,000.00
315.00
280.00
259.00
259.00
4,500.00
4,000.00
3,700.00
3,700.00
G. Bahan Kaca
1
Kaca Bening Tebal 3 mm
2
Kaca Bening Tebal 5 mm
3
Kaca naco panjang 60 cm
m2
m2
m2
70,000.00
90,000.00
8,820.00
490.00
630.00
61.74
7,000.00
9,000.00
882.00
buah
psg
psg
buah
buah
buah
psg
buah
buah
45,000.00
65,000.00
35,000.00
5,000.00
4,000.00
2,000.00
6,500.00
3,500.00
4,500.00
315.00
455.00
245.00
35.00
28.00
14.00
45.50
24.50
31.50
4,500.00
6,500.00
3,500.00
500.00
400.00
200.00
650.00
350.00
450.00
kg
kg
kg
kg
kg
kg
7,500.00
15,000.00
29,000.00
25,000.00
5,000.00
37,000.00
52.50
105.00
203.00
175.00
35.00
259.00
750.00
1,500.00
2,900.00
2,500.00
500.00
3,700.00
kg
ltr
lbr
kg
kg
kg/ltr
20,500.00
5,000.00
2,500.00
11,000.00
13,750.00
5,000.00
143.50
35.00
17.50
77.00
96.25
35.00
2,050.00
500.00
250.00
1,100.00
1,375.00
500.00
Dempul
Minyak Cat (Afduner)
Kertas Gosok (Amplas)
Cat Tembok
Cat Atap Seng merk AGA
Bahan anti rayap
J. Bahan Sanitasi
1
Floor Drain
2
Dol Penguras
3
Closed Jongkok Merek TOTO
4
Closed duduk merk TOTO
5
Urinior
6
Wastapel
7
Pipa PVC Type D Diameter 4" merk wapin
8
Pipa PVC Type D Diameter 3" merk wapin
9
Pipa Gip Dia. 2" meerk wapin
10
Pipa PVC Type D Diameter 3/4" merk wapin
11
Pipa PVC Type D Diameter 1/2" merk wapin
12
Kran air 1/2" merk Amico
13
Kran air 3/4" merk Amico
14
Sambungan T dan L PVC Diameter 2"
15
Pas. Sambungan Elbo 3/4"
16
Pas. Sambungan Elbo 1/2 "
17
Pas. Sambungan T 1/2 "
18
Pas. Sambungan T 3/4"
19
Pas. Socket 3/4"
20
Pas. Sambungan Lurus 1/2"
buah
buah
buah
bh
bh
set
m'
m'
m'
m'
m'
bh
bh
buah
/ bh
/ bh
/ bh
/ bh
/ bh
/ bh
15,000.00
4,500.00
90,000.00
250,000.00
200,000.00
250,000.00
18,250.00
13,750.00
8,750.00
4,250.00
3,750.00
13,000.00
17,000.00
5,500.00
2,750.00
2,750.00
3,500.00
3,000.00
2,750.00
2,750.00
105.00
31.50
630.00
1,750.00
1,400.00
1,750.00
127.75
96.25
61.25
29.75
26.25
91.00
119.00
38.50
19.25
19.25
24.50
21.00
19.25
19.25
1,500.00
450.00
9,000.00
25,000.00
20,000.00
25,000.00
1,825.00
1,375.00
875.00
425.00
375.00
1,300.00
1,700.00
550.00
275.00
275.00
350.00
300.00
275.00
275.00
K. Bahan Listrik
1
Sekring Kas 2 Grup
2
Saklar Tunggal
3
Saklar Ganda
4
Saklar Tiga
5
Stop Kontak
6
Lampu TL 20 Watt
7
Pitting Lampu Pijar
8
Lampu pijar 18 watt "Philips"
9
Lampu Pijar 15 Watt "Philips"
10
Lampu Pijar 40 Watt "Philips"
11
Pipa Pengaman kabel
12
Kabel NYA 2,5 mm
13
Kabel NYA 1,5 mm
14
Pipa Pengaman Kabel
/ bh
/ bh
/ bh
/ bh
/ bh
/ bh
/ bh
/ bh
/ bh
/ bh
btg
roll
/m
/m
57,500.00
10,000.00
15,000.00
13,500.00
15,000.00
45,000.00
5,000.00
25,000.00
4,000.00
5,000.00
5,000.00
150,000.00
2,250.00
5,000.00
402.50
70.00
105.00
94.50
105.00
315.00
35.00
175.00
28.00
35.00
35.00
1,050.00
15.75
35.00
5,750.00
1,000.00
1,500.00
1,350.00
1,500.00
4,500.00
500.00
2,500.00
400.00
500.00
500.00
15,000.00
225.00
500.00
L. Bahan Plafond
1
Asbes Semen (Eternit) 1 x 1 Meter
2
Seng Plat BWG 34"
lbr
lbr
10,500.00
30,000.00
73.50
210.00
1,050.00
3,000.00
Harga Satuan
Harga Dasar
Harga Dasar
Harga Dasar
(Rp)
9
(Rp)
4
(Rp)
4
(Rp)
4
85,025.00
417,625.00
145,410.00
195,225.00
416,625.00
39,745.00
720.55
2,767.50
2,767.50
11,070.00
110,700.00
78,500.00
118,800.00
66,000.00
74,950.00
78,500.00
118,800.00
66,000.00
74,950.00
78,500.00
118,800.00
66,000.00
74,950.00
66,000.00
385.00
75,000.00
66,000.00
###
75,000.00
66,000.00
385.00
75,000.00
5,000.00
###
5,000.00
47,018.44
32,500.00
32,500.00
32,500.00
7,150.00
11,550.00
22,500.00
###
11,550.00
22,500.00
7,150.00
11,550.00
22,500.00
4,000.00
3,500.00
3,000.00
9,900.00
7,500.00
15,850.00
###
###
###
10,560.00
###
15,850.00
4,000.00
3,500.00
3,000.00
11,220.00
7,500.00
15,850.00
14,000.00
19,800.00
14,000.00
19,800.00
14,000.00
19,800.00
10,670.00
10,670.00
10,670.00
27,000.00
40,000.00
35,000.00
27,000.00
40,000.00
35,000.00
27,000.00
40,000.00
35,000.00
35,000.00
35,000.00
35,000.00
996.30
774.90
733.94
1,328.40
16,605.00
13,284.00
28,228.50
89,113.50
5,535.00
7,749.00
4,981.50
3,321.00
8,302.50
6,088.50
16,605.00
14,391.00
13,284.00
15,498.00
885.60
15,498.00
15,498.00
23,247.00
13,284.00
10,737.90
4,226.73
2,767.50
52,582.50
1,992.60
1,660.50
2,214.00
47,047.50
22,140.00
46,494.00
2,909.09
9,409,500.00
9,963,000.00
9,077,400.00
9,630,900.00
5,535,000.00
5,756,400.00
1,660,500.00
1,660,500.00
2,324,700.00
83,025.00
6,088.50
2,546,100.00
44,280.00
6,088.50
38,745.00
55,903.50
6,365.25
3,000,000.00
3,000,000.00
3,000,000.00
3,000,000.00
3,000,000.00
3,000,000.00
3,000,000.00
3,000,000.00
3,000,000.00
3,000,000.00
3,000,000.00
3,000,000.00
3,000,000.00
3,000,000.00
3,000,000.00
3,000,000.00
3,000,000.00
3,000,000.00
3,000,000.00
3,000,000.00
3,000,000.00
3,000,000.00
3,000,000.00
3,000,000.00
2,000.00
950,000.00
###
950,000.00
2,000.00
950,000.00
5,350.00
5,200.00
5,000.00
48,000.00
48,000.00
48,000.00
70,000.00
70,000.00
70,000.00
66,000.00
66,000.00
66,000.00
6,500.00
5,000.00
6,600.00
###
###
###
6,500.00
5,000.00
6,600.00
3,500.00
4,000.00
###
###
3,500.00
4,000.00
20,000.00
27,500.00
15,000.00
20,000.00
27,500.00
15,000.00
20,000.00
27,500.00
15,000.00
15,000.00
3,500.00
14,520.00
20,000.00
15,000.00
###
14,520.00
20,000.00
15,000.00
3,500.00
14,520.00
20,000.00
49,815.00
44,280.00
40,959.00
40,959.00
77,490.00
99,630.00
9,763.74
49,815.00
71,955.00
38,745.00
5,535.00
4,428.00
2,214.00
7,195.50
3,874.50
4,981.50
8,302.50
16,605.00
32,103.00
27,675.00
5,535.00
40,959.00
22,693.50
5,535.00
2,767.50
12,177.00
15,221.25
5,535.00
16,605.00
4,981.50
99,630.00
276,750.00
221,400.00
276,750.00
20,202.75
15,221.25
9,686.25
4,704.75
4,151.25
14,391.00
18,819.00
6,088.50
3,044.25
3,044.25
3,874.50
3,321.00
3,044.25
3,044.25
5,000.00
4,000.00
99,000.00
###
###
99,000.00
5,000.00
4,000.00
99,000.00
11,750.00
11,750.00
11,750.00
13,250.00
13,250.00
13,250.00
5,000.00
1,500.00
1,500.00
2,000.00
1,750.00
1,500.00
1,500.00
###
###
###
###
###
###
###
5,000.00
1,500.00
1,500.00
2,000.00
1,750.00
1,500.00
1,500.00
63,652.50
11,070.00
16,605.00
14,944.50
16,605.00
49,815.00
5,535.00
27,675.00
4,428.00
5,535.00
5,535.00
166,050.00
2,490.75
5,535.00
50,000.00
6,000.00
8,500.00
12,000.00
6,000.00
30,000.00
5,000.00
50,000.00
###
###
12,000.00
###
30,000.00
###
50,000.00
6,000.00
8,500.00
12,000.00
6,000.00
30,000.00
5,000.00
3,500.00
4,500.00
###
###
3,500.00
4,500.00
2,500.00
1,500.00
1,500.00
###
###
###
2,500.00
1,500.00
1,500.00
11,623.50
33,210.00
11,800.00
24,000.00
11,800.00
24,000.00
11,800.00
24,000.00