PROJECT NAME:
AL RAHA BEACH, WESTERN SEA WALLS
VERTICAL MARINE WALLS & GROUND IMPROVEMENT
DOCUMENT TITLE:
Rev.
Date
10/03/08
Prepared by
Checked By
PP
RZ
Approved By
General :
The intent of this method statement is to describe the procedure to be followed during
repair of precast sea wall panels against minor corrosion.
References :
QA 001
PQP/P506/001
HSE/P506/001
HSE Plan
ACI 546R-04
ACI 222R-01
Materials:
o
Concresive 2200
SikaRep Fine
Hardened Chisel
Mason Hammer
Mason Trowel
Work Sequence:
o
Marked and cut the located areas by a minimum depth of 15mm where minor
corrosion noticed using diamond blade cutter.
Remove dust, loose particles, grease, etc. which may affect the adhesion of
filling materials.
Soak the surface before receiving the repair material to have a moisture
transfer between the repair material and the existing concrete.
Fill the gap by two layer of overlay; first layer to be filled by epoxy based repair
mortar concresive 2200 to act as waterproof membrane to minimize the ingress of
water/ chlorine in the concrete, and second layer to be overlaid by polymer
modified sealer SikaRep fine when the first layer has got hard enough.
Compact the repair area by mason trowel to ensure that the entire void is
filled.
The filling and closing of precast sea wall panels will be performed within the area
allocated inside the production yard.
Basic PPE will be worn by all employees (Safety Shoes, Hand Gloves, Hard Hat and
High Visibility Vest)
All
works
will
be
carried
out
in
accordance
with
EHSS
requirements/
manuals/specifications of owner/contractor/subcontractor.
o