Bid Document - POS Kiosks

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

KIOSKS IN KIDZANIA MANILA

PROJECT BRIEF:
Kidzania Manila is sourcing vendors / partners to design, fabricate and deliver/ install
Kiosks in the Play City.

The requirement is for five (5) of kiosks (all with rubber wheels)
1. Goldilocks
2. National Bookstore
3. Purefoods
4. Merchandising KZ Generic
5. Merchandising KZ Generic

REFERENCE DOCUMENTS:
This Outline specification is to be read in conjunction with the attached drawings.
REQUIRED DOCUMENTS FROM VENDOR:
Detailed Plans
- Materials Specifications
- Booth Specifications with Dimensions and 3D
- Signage Specifications with Dimensions and 3D

Electrical Requirements
Electrical Load Schedule
Riser Diagram
Electric Meter Certificate of Calibration from ERC
Plug type Power Cord
Sub-meters and Kiosk electrical breaker

OTHER REQUIREMENTS:
Net with lock to cover the cart after operations
Utility cabinets / drawers for cleaning supplies
Fire Extinguisher and bracket
Operational Manuals
DELIVERY AND INSTALLATION:
All kiosks shall be delivered in suitable covering to avoid any damages
All deliveries and transportation will be shouldered by the vendor (include time of
deliveries and debris hauling)
Equipment needed for the assembly and installation of the Kiosks will be provided by
the vendor.
Modular type of construction is encouraged.
SERVICE REPLACEMENT:
Warranty period shall not be less than one (1) year.

Play Innovations Inc. 12/F Avecshares Center, 1132 University Parkway


Bonifacio Global City, Taguig 1634 Philippines | +63 2 551.2526

Proposal on how to address repairs:


- Warranty period (free of charge)
- Beyond warranty period

PERMITS AND CONSTRUCTION BONDS


Applicable permits and bonds shall be secured by the Vendor.
INSPECTION
The Client reserves the right to inspect the kiosks while in production.
CUSTOMER SERVICE PROGRAM
Indicate contact person and other relevant information.

TIMETABLE
Activ ity
Bidding Period
Bid Submission
Bid Clarification, Rev iew of
Commercial and Technical
Submissions
Bid Awarding
Construction
Deliv ery to Site

Timetable
February 3 - 13
February 13 (3PM)

February 14 - 25
February 26
March 2 (start)
April 1

You might also like