Professional Documents
Culture Documents
Lololol
Lololol
I N
T H I S
M A G A Z I N E
1.COMPANY PROFILE
background of perunding rekacekap sdn bhd
2.GETTING PERSONAL
profile of ir kong
5.FINAL WORDS
other info from ir kong
COMPANY PROFILE
Words: Chloe Teh
IR S. Y. KONG is the director of the consulting engereering company Perunding Rekacekap Sdn.
Bhd. After working for ten years, he started this company in 1996, but only began operating in
1999. Perunding Rekacekap has worked with well-known developoers and contractors such as
Sime Darby, TTDI and IOI properties. There are three directors in this company including IR
Kong himself. Perunding Rekacekap Sdn. Bhd. has worked with a wide range of buildings, but
majority of the projects are condominiums and housing areas. Some of the companys well-known
projects include TTDI LAND in Amansari, KL Women and Child Hospital and Cheras Heights
Condominium.
LIST OF PROJECTS
OF PERUNDING REKACEKAP SDN. BHD.
ORGANISATION CHART
OF PERUNDING REKACEKAP SDN. BHD.
PROFILE OF IR KONG
Words: Chung How Cyong
IR S.Y. Kong graduated from University Malaya in 1990 and has been working as a civil engineer for about 26 years since. He has worked as a junior engineer for 3 years and another 7 years
as a senior engineer.
What I did as a junior engineer was to learn from others and try to get involved in every project, but it all depends on ones capabilities. As a senior engineer, I had more opportunities to
handle big projects. I was involved in the design phases and I also had the ability to assign work
to junior engineers as well as solving the problems that occured in site.
IR Kong achieved his IR title 5 years after he graduated from university. Now, he is one of the
directors of Perunding Rekacekap Sdn. Bhd. When we asked him what his greatest achievement
in his career was, he answered with a shy grin, Achievement? I dont have one. But seeing buildings that were designed by me gives me a great sense of accomplishment. I am very proud of
them as I have put my heart and soul into those building constructions. Also, I always recall the
good memories during the construction with the clients and contractors.
After graduating, IR Kong played his trade as a junior engineer for 3 years. One of the early projects he handled during this time was the Swiss Garden Hotel. This Swiss Garden Hotel Kuala
Lumpur between Bukit Bintang and Chinatown.
This Swiss Garden Hotel was his first project as a junior engineer in the company, his roles and
responsibilities then were designing elements, drafting, conducting technical meetings and figuring technical output. He did as much as he could to gain exposure and to find opportunities
in the construction industry as a fresh graduate.
One of the main projects that IR Kong handles currently is the National Women and Children
Hospital that is set to be completed by the end of 2016. The 848 million ringgit project will be
housing an additional 600 people when its completed.
In this project, IR Kong works as a director, he delegates work and ensures that everybody does
a specific task so that every part is well organised and set to be completed by the set dateline.
IR Kong also has to go the site frequently to ensure that everything is okay and solve on site
problems if any should occur. After that he has to compile all of the work and write a report for
the client as prove of work done.