Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 21

NAME

DESIGNATION

COST CODE

EMP
NUMBE
R

A.R.NAFE

SR.ACCOUNTS ASSTT.

19

96358

A.R.NAFE

SR.ACCOUNTS ASSTT.

19

96358

S.C.DEORUKHKAR

MANAGER (CHEM./PRODN.)

642

129031

S.C.DEORUKHKAR

MANAGER (CHEM./PRODN.)

642

129031

P.S.PARKAR

DY. MANAGER
(CHEM./PRODN.)

642

99171

DESCRIPTION
WATER
WASHING/WEIGHT
CALIBRATION ONE IN A
THREE MONTH PERIOD
REMOVE BEND TREE
FROM E-11 AND S-10
LOCATION ROAD GOING
TO CISF GATE
DA-I/II SAMPLE POINT TO
BE GIVEN FROM TP-601
A/B COMMON SUCTION
LINE
PRI. REFORMER FUEL
LINE ONE ADDITIONAL
SMALL SIZED CONTROL
V/V TO BE FITTED AT THE
BYPASS OF THE
PRESENT FRC 32
BY PASS LINE OF 90FRC
554
PROVISION OF BULB
INSTEAD ON MERCURY
LIGHT AT COMPRESSOR
ROOM COMMON TOILET
IN AMM PLANT
TO PROVIDE HELMET
WITH BATTERY LIGHT
PROVISION OF PC IN
UREA PRODUCTION
WELFARE
PROVIDE ONLINE
CONDUCTIVITY METER
TO P2C SEAL FLUSHING
WATER OUTLET LINE
REMOVE 'TAGS' FROM
GROUP 101 FROM DCS
OF OT AREA
IN PLANT CONTROL
VALVE PUT STRIP OF
MARKING 0-TO 100
PROVISION OF NEW
INDICATION STRIP TO
CONTROL VALVE
PROVIDE TEM. SCANNER
(GUN) IN CONTROL
ROOM
BOOK BINDING TO BE
DONE TO PROCESS
MANUAL VOL-I & VOL-II IN
UREA PLANT

SG NO

20130373

20130321

20100041

20123568

20052158

V.R.BURANDE

OPERATOR GR.I

642

107542

20131044

N.R.THALE

SR.OPTR.SG.II

643

78621

P.D.GANDHI

SR.OPERATOR SG II

643

94821

T.R.LOHOTE

SENIOR ENGINEER
(CHEM./PRODN.)

643

98834

R.H.CHAUDHARI

DY. MANAGER
(CHEM./PRODN.)

643

98812

A.S.BHALERAO

SR.OPTR.SG.2

643

99011

P.D.GANDHI

SR.OPERATOR SG II

643

94821

A.B.PATIL

MANAGER (CHEM./PRODN.)

643

86879

R.H.CHAUDHARI

DY. MANAGER
(CHEM./PRODN.)

643

98812

R.D.PATIL

SR.OPTR SG.II

643

98959

TO START PROPER OIL


PANTING WORK IN PLANT

20120829

E.H.PATIL

MANAGER (CHEM./PRODN.)

643

81007

K3 C DRAIN LINE IN UREA


31 TO BE REROUTED

20130791

T.R.LOHOTE

SENIOR ENGINEER
(CHEM./PRODN.)

643

98834

PROVIDE LID ON BUCKET


A & B STOP SWITCH ON
FSC PANEL

20121311

P.S.GHARAT

OPERATOR GR.I SG

643

130395

CHANGE THE STRAINER


OF ME-7

20120842

A.B.PATIL

MANAGER (CHEM./PRODN.)

643

86879

PROVIDE STEAM JACKET


TO TK1/K1 ANT SURGE
C/V

20120986

20130756
20120958

20132086

20120891
20120913
20120939
20120976

20120890

A.B.PATIL

MANAGER (CHEM./PRODN.)

643

86879

P27 DISCHARGE COOLER


PROVIDE COOLING
WATER VENT

20121032

A.B.PATIL

MANAGER (CHEM./PRODN.)

643

86879

TK1/K1 SEALING M.S.


REROUTING IN 21 UNIT

20121061

A.R.KADAM

OPERATOR GR.II

643

128762

A.R.KADAM

OPERATOR GR.II

643

128762

G.K.KULKARNI

OPERATOR GR.II

643

128819

K.K.DABIR

ATTDNT.OPERATOR GR.II

643

78702

C.P.MAKU

SR. OPTR. SG - II

643

88963

B.D.JAGTAP

SR. OPTR. SG. II

643

84289

K.K.DABIR

ATTDNT.OPERATOR GR.II

643

78702

S.J.HAMANE

OPTR. GR. I

643

120526

M.B.PHAPALE

SR.OPTR SG.II

643

94843

U.H.DHAGAONKAR

SR.OPERATOR SG II

643

83387

U.H.DHAGAONKAR

SR.OPERATOR SG II

643

83387

J.A.KULKARNI

SR. OPTR. SG - II

643

99528

A.R.KADAM

OPERATOR GR.II

643

128762

A.B.PATIL

MANAGER (CHEM./PRODN.)

643

86879

P.M.MHATRE

OPTR. GR. I

643

131461

A.H.SAYED

SENIOR ENGINEER
(CHEM./PRODN.)

643

72592

D.D.KHADKE

MANAGER (CHEM./PRODN.)

643

86684

A.R.PALANDE

SENIOR ENGINEER
(CHEM./PRODN.)

643

136113

G.K.KULKARNI

OPERATOR GR.II

643

128819

PROVISION OF RAILING
AT U-11 COMPRESSOR
SEAL RECOVERY VALVE
PROVISION OF
PERMANENT PLATFORM
FOR STARTUP LINE,
K.W.& STEAM LINE
ABOUT C-41 E-12 BACK
WASH WATER DRAIN
KINDLY DO WELDING OF
ROAD OF H W LINE
VALVE
ABOUT WELFARE CHAIRS
PROVIDE COOLING
WATER BACK WAS
FLUSHING
ARRANGEMENT TO THE
11E-21A P-10
CONDENSATE FIRST
COOLER
ABOUT REMAINING
STEEL AT UREA PLANT
EXTENSION LIE TO P-13
DRAIN
MODIFICATION OF P13
OPEN DRAIN
LUBE OIL PUMP'S
PRESSURE SHOULD BE
PRINTED IN IAC LOG SHIT
PRINT THE OPEN/CLOSE
ON S/F BACK WASH
VALVE
11 CO2 COMPRESSOR
H.S. LINE BYPASS
RAILING REROUTING
PROVISION OF
GREASING OF SAND
FILTERS I/V VALVE
21 UNIT L.S. PRDS BY
PASS PROVIDE
TO CONNECT THE
PLATFORMS OF THE
VACUUM SECTION OF
UNIT 31 FOR E41N & E42N
PROVISION OF ALARM ON
DCS/EEE PANEL DURING
PRILLING DIVERSION OR
LINE UP OF UREA MELT
SOLUTION IN UNIT 11/21
PROVISION OF LED
INDICATION
EXTEND P13 LOCAL
DRAIN LINE OUTLET
(NEAR MVS9) TO SAFE
DISTANCE FROM
ISOLATION VALVE IN ALL
UNITS OF UREA PLANT
PROVISION OF LAMP AT
K-3 COMPRESSOR
READING

20121159

20121165
20121172
20121194
20121197

20121200

20121213
20121282
20121299
20121248
20120785
20120808
20121233
20120999

20132137

20120879

20120854

20132212

20121173

K.R.GURAV

OPTR. GR. I

643

131404

A.B.PATIL

MANAGER (CHEM./PRODN.)

643

86879

E.H.PATIL

MANAGER (CHEM./PRODN.)

643

81007

K.R.PATIL

SR.OPTR SG II

643

83398

V.D.PAITHANKAR

ENGINEER (MECH.)

652

72119

A.D.PATIL

TECH. MECH. GR.I

653

107656

A.D.PATIL

TECH. MECH. GR.I

653

107656

G.P.KALE

PLANT ATTENDANT GR.I

653

98429

M.T.SONARKAR

DY. MANAGER(MECH.)

653

95329

P.K.GONDHALI

ENGINEER (MECH.)

653

83479

G.P.KALE

PLANT ATTENDANT GR.I

653

98429

S.P.SAVAKHANDE

TECHNICIAN (MECH.) GR.II

653

128565

G.P.KALE

PLANT ATTENDANT GR.I

653

98429

S.G.PISAL

MACHINIST GR.III

655

133125

G.B.BANI

EQUIP. OPTR. GR.I SG-II

655

92829

C.L.MAITAM

TECH. MECH. GR. II SG

655

87426

V.M.THAKUR

SR.TECH.MECH.SG.II

655

72349

M.N.THAKUR

SR.TECH.MECH.SG.2

655

74293

PROVIDE LADDER TO
OPEN 11-V3 DRAIN LINE
PLUG VALVE
21 E27 EAST SIDE
COOLING WATER VENT
BROUGHT DOWN TO
BOTTOM
PROVISION OF PROPER
ELECTRIC CONNECTION
& PLATFORM TO
DISPENSARY DOSING
PUMP
PLANTATION OF TREES
PROVIDE A FIXTURE FOR
USE AT THE TIME OF
CHANGING THE SEAL OF
BTAL LOADING ARM AMM
REPLACE THE PIPE
RAILING OF 21MV-7 TANK
PUT THE TAG ON FITTING
& VALVE AT STORES IN
FRONT OF COOLING
TOWER
PROVISION OF HOT
WATER PIPE IN P-11,P-21
& P-31 AT UREA
CAGE PROVISION TO V6
MONKEY LADDER TO BE
DONE IN UREA 21
IN UREA PLANT DRAIN
LINE FOR K-3
COMPRESSOR TO BE
TAKEN TO GROUND
LEVEL TO AVOID
ENTANGLING AND
FALLEN OF PERSONS
MAKE CEMENT SLOPE
NEAR TOWER STAIR
CASE AT P-11,P-21,P-31 AT
UREA
PROVISION OF JOHNSON
TAPE OR TREAD CAP TO
NUT BOLTS WHILE
PAINTING IN PLANT
PROVISION OF FIRST AID
BOX AT UREA
MECHANICAL
WORKSHOP
DISPLAY OF BOARD AT
THE ENTRANCE OF EACH
PLANT
PROVISION OF ROAD
FOR HWP CT CRANE
PROVISION OF LIGHT
ABOVE THE WORKING
TABLE AT AUTO
WORKSHOP
KEEP THE DRILLING
MACHINE SUPPLY CABLE
IN PROPER WAY
TO PROVIDE ELECTRIC
PLUG TOP (SOCKET)
NEAR THE COLUMN
DRILLING MACHINE

20120821

20121054

20121070

20130941

20052011

20120593

20120576

20120620

20130758

20130401

20120621

20120610

20121281

20130773
20120283

20120395

20120307

20120196

R.H.SHETKE

TECHNICIAN (MECH.) GR.II

655

128473

PROVISION OF 10 METER
LONG WIRE EXTENSION
BOARD & FIX IT ON MAIN
BOARD

R.H.SHETKE

TECHNICIAN (MECH.) GR.II

655

128473

PROVISION OF LAMP
UNDER EOT CRANE

20120486

R.V.RAUT

PLANT ATTENDANT GR II SG-I

655

131597

PUT THE TAG OF PLANT


ON MACHINING JOB
DONE

20120238

V.R.NAIK

TECH.(MECH) GR.II

655

127871

PROVISION OF SLEEVE
FOR SHIFTING STUD

20120464

V.M.THAKUR

SR.TECH.MECH.SG.II

655

72349

V.M.THAKUR

SR.TECH.MECH.SG.II

655

72349

G.N.PATIL

SR.TECH.MECH.SG.2

655

74214

G.N.PATIL

SR.TECH.MECH.SG.2

655

74214

V.M.THAKUR

SR.TECH.MECH.SG.II

655

72349

R.H.SHETKE

TECHNICIAN (MECH.) GR.II

655

128473

R.H.SHETKE

TECHNICIAN (MECH.) GR.II

655

128473

G.N.PATIL

SR.TECH.MECH.SG.2

655

74214

G.N.PATIL

SR.TECH.MECH.SG.2

655

74214

G.N.PATIL

SR.TECH.MECH.SG.2

655

74214

D.R.KOLI

RIGGER GR. II SG - II

655

107137

V.M.THAKUR

SR.TECH.MECH.SG.II

655

72349

D.R.KOLI

RIGGER GR. II SG - II

655

107137

V.M.THAKUR

SR.TECH.MECH.SG.II

655

72349

C.L.MAITAM

TECH. MECH. GR. II SG

655

87426

C.L.MAITAM

TECH. MECH. GR. II SG

655

87426

V.M.THAKUR

SR.TECH.MECH.SG.II

655

72349

PROVISION OF
INDICATOR HAND TO
125T CRANE
CHANGE TO EXHAUST
FLAPPER COVER OF 300T
CRANE
REUSE OF 12 TO 20 MM
TAPER SHAKE LOCK
TO ATTACH CLIPS
COLLECTING TRAY TO
SHAPING MACHINE
CLEAN THE WATER
RETURN LINE OF 300T
OIL COOLER
WHILE MAKING R G
BOILER AMMONIA LINER
ID PLATE SHOULD BE
ROUND
PROVISION OF
PNEUMATIC AIR AT
BALANCING MACHINE
TO MAKE SPECIAL
SPANNER FOR JUMBO
BRAKE ADJUSTING
SCREW
TO KEEP SPECIAL TOOL
BOX FOR MACHINE
MAINTENANCE
TO FABRICATE NEW
CUPBOARD TO KEEP
SPECIAL TOOLS OF
COOLING TOWER
GEARBOX MAINTENANCE
PROVISION OF VALVE TO
THE COOLER TANK OF
LATHE MACHINE
PROVIDE DEEP STICK
FOR KNOWING DIESEL
TANK LEVEL OF 12.5 T
CRANE
USE UREA PUMP BLOCK
FOR JUMBO
MAINTENANCE
IN SAN LOCO MADE
WD546 HANGER AS PER
SAN LOCO BRAKE SHOO
TO FILL TRANSMISSION
OIL IN 300T CRANE
PROVIDE Z TYPE PIPE
ALL CRANES GREASING
POINT SHOULD BE IN
ONE JUNCTION BOX
PROVISION OF ELBOW
TO EXHAUST PIPE OF 50T

20120352

20120220
20120228
20120202
20120198
20120302

20120433

20120351

20120405

20120207

20120201

20120187

20120304

20120192
20120303
20120398
20120399
20120310

CRANE
R.H.SHETKE

TECHNICIAN (MECH.) GR.II

655

128473

PROVIDE RACK FOR


KEEPING PLATES

20120165

20120194

C.S.PATIL

TECHNICIAN (MECH.) GR.II

655

127893

DRILL THE HOLE TO


SCRAPPER BUCKET
AFTER PUTTING HOLE
TEMPLATE

D.R.KOLI

RIGGER GR. II SG - II

655

107137

PROVIDE WATER PIPE


LINE AT LATHE MACHINE

20120183

D.R.KOLI

RIGGER GR. II SG - II

655

107137

PROVIDE METAL CABINS


FOR LAPPING MACHINE

20120186

PUT 6" RUBBER PAD


PIECE MIDDLE OF CLAMP
TO FIR AIR CLEANER ON
50T CRANE
PROVIDE DRILL MACHINE
NEAR DYNAMIC
BALANCING MACHINE
FIT ONE PIPE IN ENGINE
OIL DRAIN OF 100T
CRANE
PUT NAME PLATE ON ALL
SWITCHES OF 50 T
CRANE
PROVISION OF LOCK NUT
TO 12.5 T CRANE
DECOMPRESSION LIVER
PROVISION OF
ADJUSTING BOLT TO
ADJUST DOZER
ALTERNATE BELT
CHANGE THE SIZE OF
PULLEY FITTING VOLT OF
300T WATER PUMP BELT
PROVIDE TROLLEY TO
PORTABLE WELDING
MACHINE
FOR GRINDING
NONMAGNETIC BEARING
MADE SPECIAL
SPORTING FIXTURE
MAKING HOWL OF SUMP
COVER GUARD FOR
DRAINING STORE TRUCK
ENGINE OIL
PROVIDE A BOX FOR
PRESS PIN NEAR TO 200T
PRESS M/C

A.D.KATOR

SR. TECH. MECH. SG II

655

74271

G.N.PATIL

SR.TECH.MECH.SG.2

655

74214

V.M.THAKUR

SR.TECH.MECH.SG.II

655

72349

V.M.THAKUR

SR.TECH.MECH.SG.II

655

72349

V.M.THAKUR

SR.TECH.MECH.SG.II

655

72349

V.M.THAKUR

SR.TECH.MECH.SG.II

655

72349

V.M.THAKUR

SR.TECH.MECH.SG.II

655

72349

D.R.KOLI

RIGGER GR. II SG - II

655

107137

S.N.PAWASHE

SR.MACHINIST SG-II

655

76778

C.L.MAITAM

TECH. MECH. GR. II SG

655

87426

R.H.SHETKE

TECHNICIAN (MECH.) GR.II

655

128473

C.S.PATIL

TECHNICIAN (MECH.) GR.II

655

127893

ABOUT SCRAP DRUM

20120458

D.A.NAIK

PLANT ATTENDANT GR II

655

131564

LOCKING SYSTEM FOR


PIPE CUTTER MACHINE

20120179

D.A.NAIK

PLANT ATTENDANT GR II

655

131564

LEVEL OF FLOORING
AREA OF WORKSHOP

20120182

G.N.PATIL

SR.TECH.MECH.SG.2

655

74214

V.M.THAKUR

SR.TECH.MECH.SG.II

655

72349

USE TEE CONNECTOR IN


DRAIN LINE OF POWER
SAW COOLANT PIT
PUT THE FILTER
RUSTICATOR AT
PRESSURE SIDE OF 50 T
CRANE

20120195

20120197
20120306
20120210
20120209

20120211

20120305
20120188

20120176

20120069

20120484

20120205

20120213

G.N.PATIL

SR.TECH.MECH.SG.2

655

74214

GIVE COLOUR TO
FIXTURES AT
FABRICATION SHOP

20120372

G.N.PATIL

SR.TECH.MECH.SG.2

655

74214

PROVIDE OIL CUP TO


POWER SAW MACHINE

20120406

V.R.NAIK

TECH.(MECH) GR.II

655

127871

MARKING ON WALL AS
PER CENTER OF EOT
BALANCING CRANE

20120441

C.S.PATIL

TECHNICIAN (MECH.) GR.II

655

127893

ABOUT R G BOILER
FIXTURE

20120461

V.R.NAIK

TECH.(MECH) GR.II

655

127871

PROVIDE AUTO CAD


SHEET FOR ANGULAR
ORIENTATION

20120462

R.H.SHETKE

TECHNICIAN (MECH.) GR.II

655

128473

LIFTER ROAD SHOULD BE


MARK WITH PAINT

20120485

R.H.SHETKE

TECHNICIAN (MECH.) GR.II

655

128473

PROVISION OF CLAMP
THE CONNECT R G
BOILER LINER

20120490

V.R.NAIK

TECH.(MECH) GR.II

655

127871

PROVISION OF PIT FOR


TUBE TESTING

20120507

H.M.WATKARE

SR. MACHINIST SG-II

655

76734

PROVISION OF MOUTH
MASS WHILE DOING
CASTING JOB

20120512

R.H.SHETKE

TECHNICIAN (MECH.) GR.II

655

128473

ABOUT TANK LADDER

20120517

R.H.SHETKE

TECHNICIAN (MECH.) GR.II

655

128473

FOR PULLING CRANE


SHAFT PROVISION OF
JACK PLATE

20120518

C.S.PATIL

TECHNICIAN (MECH.) GR.II

655

127893

MADE SS PIPE FOR R G


BOILER LINER

20120523

C.S.PATIL

TECHNICIAN (MECH.) GR.II

655

127893

ABOUT SURFACE PLATE

20120526

D.A.NAIK

PLANT ATTENDANT GR II

655

131564

INCREASE THE HEIGHT


OF TABLE BLOCK

20131712

S.N.PAWASHE

SR.MACHINIST SG-II

655

76778

V.M.THAKUR

SR.TECH.MECH.SG.II

655

72349

A.N.GHADGE

SR.MACHINIST SG II

655

72176

V.R.NAIK

TECH.(MECH) GR.II

655

127871

PROVISION OF STAND
FOR ACID BOTTLE IN LAB

20120483

P.M.MANWATKAR

SR. TECH.(ELECT.)

663

105044

PUT BOARD OF
DIRECTION OF ROTATION
OF CT PUMP

20120840

P.M.MANWATKAR

SR. TECH.(ELECT.)

663

105044

PROVISION OF TIMER TO
TECH. BLDG. LIGHT

20121319

D.K.PEDNEKAR

TECH.ELECT.GR.I

665

75079

H.S.DESAI

SR.TECH. (ELECT) SG II

665

83873

V.A.TAYDE

SR.TECH.ELECT. SG.II

665

83321

V.A.TAYDE

SR.TECH.ELECT. SG.II

665

83321

MAKE SPECIAL TOOL FOR


TURBINE GLAND
FURNISH MACHINING
CHANGING LOCATION OF
SYNCHRONIZATION, BY
10MM WHICH IS FIXED ON
REELING DRUM
MATERIAL SHOULD BE AS
PER DIMENSION OF JOB
REQUIRED

CHANGE THE ROAD OF


DOZER WHILE GOING
FOR MAINTENANCE
PROVISION OF JUNCTION
BOX AT NAGOAN GATE
LIGHT CABLE
PROVISION OF NEW
FUSE BOX AT PDIL
STORES
USE THE 12V/24V TAP OF
JUMBO BATTERY IN

20120170

20120068

20120492

20120360
20120260
20120353
20120357

ALTERNATOR TESTING
MACHINE
PROVISION OF REVERSE
HORN TO 5T LIFTER
AT CICF MAIN GATE
OFFICE PROVISION OF
CFL
USE HRS FUSE BASE &
CARRIER AGAINST
BOTTLE FUSE
REGULAR
MAINTENANCE/CLEANING
OF EOT CRANE

D.R.PATIL

SR.TECH. ELECT.

665

92389

H.S.DESAI

SR.TECH. (ELECT) SG II

665

83873

V.A.TAYDE

SR.TECH.ELECT. SG.II

665

83321

D.R.PATIL

SR.TECH. ELECT.

665

92389

V.A.TAYDE

SR.TECH.ELECT. SG.II

665

83321

D.R.PATIL

SR.TECH. ELECT.

665

92389

P.G.GHARAT

SR.PLANT ATTENDANT SG II

665

92553

P.G.GHARAT

SR.PLANT ATTENDANT SG II

665

92553

D.K.PEDNEKAR

TECH.ELECT.GR.I

665

75079

H.S.DESAI

SR.TECH. (ELECT) SG II

665

83873

D.R.PATIL

SR.TECH. ELECT.

665

92389

R.A.HANDEDESHMUKH

SR. TECH. ELECT.

665

89221

V.A.TAYDE

SR.TECH.ELECT. SG.II

665

83321

V.A.TAYDE

SR.TECH.ELECT. SG.II

665

83321

V.A.TAYDE

SR.TECH.ELECT. SG.II

665

83321

USE CFL INSTEAD OF


TUBE FITTING

20120222

V.A.TAYDE

SR.TECH.ELECT. SG.II

665

83321

ABOUT CIVIL OFFICE DB


SUPPLY

20120437

V.A.TAYDE

SR.TECH.ELECT. SG.II

665

83321

K.P.POTDAR

SR.TECH.ELECT.

666

92264

R.P.GHORDADEKAR

SR. TECH. INST. SG - 2

672

95401

T.A.THAKUR

PLANT ATTENDANT GR I SG II

673

121196

SHIFT THE POWER MCB


SWITCH OF 300T CRANE
PROVIDE FOUNDATION
TO VICO LENGTH
CONTROL PANEL
PROVISION OF
CONCRETE NEAR PDIL
DB
PROVISION OF
FOUNDATION TO
ELECTRIC DB
PROVISION OF BOX TO
KEEP FMC CRANE
BATTERY
PREPARE ALL STREET
LIGHT LOCATION MAP
AND PUT IN THE OFFICE
PROVISION OF
INDICATION OF ENGINE
SHUT-DOWN ON
LOCOMOTIVE
PROVISION OF COVER
ON DOZER
PROVISION OF EXHAUST
FAN AT ELECT. W/S
STORES ROOM
USE BUS-BAR FLAT
INSTEAD OF NEUTRAL IN
D B AT WORK-SHOP

OCTAGONAL POLE WITH


METAL HAILED LIGHT AT
STORE & SCRAP YARD
FIXING DANGER TAG FOR
ISOLATION OF HT (3.3/11
KV) FEEDER BOTH SIDE
(I.E. PANEL FRONT AND
BACK SIDE ) TO AVOID
THE ACCIDENT
MAKE SEPARATE
INSTRUMENT AIR SUPPLY
ARRANGEMENT FOR
12PV639
PROVISION OF COVER
FOR COOLING TOWER
SWITCH

20120345
20120256
20120232
20120344
20120381
20131631
20120327
20120323
20120217
20120251

20131634

20120312
20120296
20120298

20120233

20130880

20100432

20121135

G.D.SHARMA

SENIOR ENGINEER (INST.)

673

135993

PROVISION OF BAUER
COMPRESSOR
INDICATION & ALARMS
AND TRIP LOGIC
THROUGH DCS

T.A.THAKUR

PLANT ATTENDANT GR I SG II

673

121196

PROVISION OF RUBBER
SHEET ON JUMBO

20121133

G.D.SHARMA

SENIOR ENGINEER (INST.)

673

135993

REPLACEMENT OF
REGULATOR/ITOP PG

20120721

20120580

20120720

U.M.DESHMUKH

SR.TECH (INST) SG I1

673

95307

FOR UNLOAD/LOAD P1
PUMP USE CL OF DCS
INSTEAD OF ANALOG
COMPARATOR

G.D.SHARMA

SENIOR ENGINEER (INST.)

673

135993

SOFTWARE FORM OF
IMPORTANT DOCUMENTS

20120722

20121098

H.H.PATIL

MANAGER (INST.)

673

84442

COOLING TOWER LOW


OIL LEVEL TRIP SWITCH
PROPER MOUNTING
ARRANGEMENT TO BE
MADE

T.A.THAKUR

PLANT ATTENDANT GR I SG II

673

121196

PROVISION OF COVER
TO PC-12 VALVE
POSITIONER

20130221

T.A.THAKUR

PLANT ATTENDANT GR I SG II

673

121196

PERMANENT COVER TO
ULTRASONIC
TRANSMITTER

20121122

T.A.THAKUR

PLANT ATTENDANT GR I SG II

673

121196

PERMANENT COVER TO
PT-101 TRANSMITTER

20121127

T.A.THAKUR

PLANT ATTENDANT GR I SG II

673

121196

USE OF I2P SPARE

20121130

T.A.THAKUR

PLANT ATTENDANT GR I SG II

673

121196

PROVISION OF ALU. BOX


FOR UNIT-T1 IT-230, TI235

20121138

T.A.THAKUR

PLANT ATTENDANT GR I SG II

673

121196

PROVISION OF SOFT
BRUSH TO CLEAN LEVEL
GAUGE

20121149

H.H.PATIL

MANAGER (INST.)

673

84442

H.H.PATIL

MANAGER (INST.)

673

84442

J.D.ADATE

DEPUTY MANAGER (INST.)

673

84394

T.A.THAKUR

PLANT ATTENDANT GR I SG II

673

121196

PROVISION OF PLASTIC
COVER TO CALIBRATOR

20121088

20120651

20120677

TI 105B & PR101 B CABLE


TO BE REROUTED
P1 A SPEED PROBE
MOUNTING PLATE
HEIGHT TO BE REDUCED
31P-1 A/B/C T/C
ACTUATOR TUBING TO
BE REPLACED

T.A.THAKUR

PLANT ATTENDANT GR I SG II

673

121196

PROVISION OF
PERMANENT ALU. BOX
TO IT-235 & IT-230 TEMP
POINT AT UREA 21

T.A.THAKUR

PLANT ATTENDANT GR I SG II

673

121196

PROVISION OF PROPER
COVER TO PR5&6 AT
UREA

P.S.KHARCHE

DY.MANAGER(INST.)

673

122827

P1 A/B/C UNLOADING
LOGIC TO BE PROVIDED
ON DCS FOR PUMP

20120706
20120931
20121102

20121189

UNLOADING ALARM &


REAL PUMP UNLOADING
CAUSE
T.A.THAKUR

PLANT ATTENDANT GR I SG II

673

121196

PROVISION OF COVER
FOR PT-07 TRANSMITTER

20121126

T.A.THAKUR

PLANT ATTENDANT GR I SG II

673

121196

PROCURE GOOD
QUALITY THREAD

20121137

LV 65,68 & 75 C/V


POSITIONER
REPLACEMENT WITH MIL
POSITIONER
REPLACEMENT OF
POSITIONER OF PV226B
L.S. PRDS CONTROL
VALVE WITH FISHER
MAKE POSITIONER

J.D.ADATE

DEPUTY MANAGER (INST.)

673

84394

U.M.DESHMUKH

SR.TECH (INST) SG I1

673

95307

T.A.THAKUR

PLANT ATTENDANT GR I SG II

673

121196

G.D.SHARMA

SENIOR ENGINEER (INST.)

673

135993

H.H.PATIL

MANAGER (INST.)

673

84442

U.M.DESHMUKH

SR.TECH (INST) SG I1

673

95307

T.A.THAKUR

PLANT ATTENDANT GR I SG II

673

121196

KINDLY PROCURE GOOD


QUALITY PLASTIC

20121136

20130034

20120681

PROVISION OF TAG TO
AIR HEADER TUBE
REPLACEMENT OF TRIM
MATERIAL OF LV 138
CONTROL VALVE
21T112B
THERMOCOUPLE CABLE
REROUTING TO BE DONE
INSERTION OF BARRIER
IN THE KOOP OF HIGH
LEVEL SWITCH POWER
SUPPLY IN KNOCK DRUM
LEVEL IN 31 UNIT UREA
PLANT

U.M.DESHMUKH

SR.TECH (INST) SG I1

673

95307

STRENGTHENING
SUPPORTS & ROD OF
LADDER AT 21 R1 FROM
TOP TOWARDS EAST
SIDE & REPAINTING

T.A.THAKUR

PLANT ATTENDANT GR I SG II

673

121196

PROVISION OF
PLATFORM TO PC-166
VALVE

P.S.KHARCHE

DY.MANAGER(INST.)

673

122827

G.D.SHARMA

SENIOR ENGINEER (INST.)

673

135993

H.H.PATIL

MANAGER (INST.)

673

84442

T.A.THAKUR

PLANT ATTENDANT GR I SG II

673

121196

U.M.DESHMUKH

SR.TECH (INST) SG I1

673

95307

31P20A1B CIVIL
STRUCTURE PLATFORM
& PUMP PIPING TO BE
REMOVED
PROVISION OF
ISOLATION VALVE IN THE
SUP STREAM OF PV209A
PROVIDE PC209A
DISCHARGED LINE
ISOLATION VALVE &
DRAIN
ARRANGEMENT OF HOLE
TO BEAM OF UNIT11 E-9
FLOOR TO DRAIN THE
RAIN WATER
PROVISION OF
DETACHABLE SAFETY
GUARD TO LV131B
PLATFORM

20121100

20121110

20120690

20120730
20120705

20130857

20120752

20120714

20120929

20121139

20120578

DECREASE THE GAP OF


LADDER AT FRI
TRANSMITTER UNIT 21
OF UREA
TO PROVIDE PROPER
APPROACH TO TV232B
VALVE IN 21 UNIT OF
UREA
LC2, HV1, HV2, HV61
VALVE ORIENTATION TO
MAKE SAME FOR THAT
PHOTO OF EACH VALVE
SHOULD BE GIVEN TO
INST. WORKSHOP
REPLACEMENT OF M.S.
NUT BOLTS OF
ACTUATORS OF C
VALVES IN UREA WITH SS
NUT BOLTS

T.A.THAKUR

PLANT ATTENDANT GR I SG II

673

121196

20120679

U.M.DESHMUKH

SR.TECH (INST) SG I1

673

95307

H.H.PATIL

MANAGER (INST.)

673

84442

U.M.DESHMUKH

SR.TECH (INST) SG I1

673

95307

T.A.THAKUR

PLANT ATTENDANT GR I SG II

673

121196

ABOUT REVERS
FORWARD SWITCH OF
JUMBO

20131404

20132145

20120764

20121094

20120709

U.M.DESHMUKH

SR.TECH (INST) SG I1

673

95307

TO PROVIDE 7 SEGMENT
RED COLOURED DISPLAY
INDICATOR FOR RPM
INDICATOR IN PLACE OF
METAL LOOP INDICATOR
WHICH IS BLACK LIQUID
CRYSTAL

G.D.SHARMA

SENIOR ENGINEER (INST.)

673

135993

V5 LEVEL IN UREA PLANT

20132104

20120726

20121153

G.D.SHARMA

SENIOR ENGINEER (INST.)

673

135993

SUPPORT FOR THE


STEAM DRAIN LINE
WHICH IS NOW RESTING
ON THE ACTUATOR OF
LV101 CV IN 21 UNIT

T.A.THAKUR

PLANT ATTENDANT GR I SG II

673

121196

PROVISION OF SWITCH
STICKER ON JUMBO

U.M.DESHMUKH

SR.TECH (INST) SG I1

673

95307

G.D.SHARMA

SENIOR ENGINEER (INST.)

673

135993

S.S.TEMGHARE

DEPUTY MANAGER (INST.)

674

72373

R.S.VITEKARI

SR.TECH.INST.

674

120861

U.N.POTDAR

TECH.(INST.)GR.I

674

121682

G.M.GHARAT

TECH.GR.II (INST) SG-I

675

92507

G.S.PATIL

SR.TECH INST SG.II

675

96082

ABOUT HOT WATER LINE


IN UNIT 21 CO2
COMPRESSOR
SHIFTING OF PT141
CLOSE TO THE VESSEL
TAPPING
MODIFICATION IN THE
HOPPER DOOR FOR
PROPER SEALING
USE THIN RUBBER FOR
TIGHT GRIP OF GRAVITY
FEEDER FEED GATE AND
SHAFT INSTEAD OF
KNURLING AND
SURRESSIONS
USE EMBEDDED
STAINLESS STEEL NUT
BOLTS INSTEAD OF MILD
STEEL FOR CLAMP
RUBBER
ABOUT PRESSURE
TESTING HOSE PIPE AT
INSTRUMENT
WORKSHOP
SHAFT WELDING FOR
VAIN AND PIN IN
BUTTERFLY VALVES

20121106
20120718
20100053

20110360

20110359

20120429

20120247

G.S.PATIL

SR.TECH INST SG.II

675

96082

USE OF GUIDING PIPE IN


ASSEMBLING THE
SAFETY VALVE HAVING
BONNET MORE HEIGHT

A.G.GHARAT

OPERATOR GR.II

678

128602

PROVISION OF STOOL AT
CENTRAL CHEMICAL LAB

20110161

P.D.GHARAT

FIRE/SAFETY SUPERVISOR

679

121671

PROVISION OF CO2
EXTINGUISHER INSTEAD
OF DCP EXTINGUISHER

20130430

S.V.SURYAWANSHI

MANAGER (SAFETY)

679

92483

ADM BUILDING FIRE &


LIFE SAFETY AUDIT

20130390

G.N.PATIL

OFFICER (MATERIALS)

681

139721

INTERNET ID &
PASSWORD SHALL BE
GIVEN TO PURCHASE
OFFICERS

20130161

R.V.JADHAV

OFFICER (MATERIALS)

681

139384

E-MAIL STORAGE LIMIT

20130068

D.R.MHATRE

SENIOR MANAGER
(MATERIALS)

681

68875

M.M.DEO

DY GEN MANAGER
(HWP),THAL

692

93963

M.M.DEO

DY GEN MANAGER
(HWP),THAL

692

93963

PROVIDE ACCESS TO
FINANCIAL DETAILS IN
SAP TO PURCHASE
DEPARTMENT
PROVISION OF A FLOW
RECORDER FOR
CATALYST FEED IN DMF
REACTOR
PROVISION OF NEW
URINAL AT FA LOADING
AREA
LT 191 INDICATION IS
PRESENTLY IN GROUP
TO BE SHIFTED TO
GROUP 72 IN PLACE OF
UA142 FOR
SIMULTANEOUSLY OF
LT191 AND LT138
PROVISION OF LIGHT IN
ALL THREE PRILLING
TOWER
MS DEPARTMENT
SHOULD CONDUCT
MEETING IN WELFARE TO
ENCOURAGE PEOPLES
ABOUT QC

20120409

20130088

20123974

20123973

G.N.PATIL

SENIOR ENGINEER
(CHEM./PRODN.)

733

72443

S.V.BHOIR

ASSTT.PLANT ATTENDANT

735

132709

A.D.RAMTEKE

DY.MANAGER(CHEM/PRODN.)

748

125338

K.A.RAUT

PLANT ATTENDANT GR.II SGII

748

121636

ABOUT GAS TYPE


SAFETY GOGGLE

20122441

A.S.JAGE

SENIOR ENGINEER
(CHEM./PRODN.)

748

129307

CONVEX MIRROR TO BE
INSTALLED ON TURNING
OF ROAD

20123109

S.N.PATIL

SENIOR ENGINEER
(CHEM./PRODN.)

748

108455

P.M.NAIK

OPTR. GR. I SG I

748

120031

S.S.PATIL

SENIOR MANAGER
(CHEM./PRODN.)

748

108177

S.S.MESHRAM

DY. MANAGER
(CHEM./PRODN.)

748

126853

TO GIVE 1 DRAIN VALVE


NEAR 11 MAP FOR
TAKING COMMON
CONDENSATE SAMPLE
CHANGING ANHYDROUS
VALVE POSITION BY 90
DEGREE
METHYL AMINES
ANHYDROUS STORAGE
AREA PLATFORM TO BE
MAINTAINED
VENT VALVE IN HGRU, ITS
RESPONSE TO BE MADE
FASTER

20130846

20120587

20122479

20123145

20123113

20123902

20124321

S.P.KENDKI

OPTR. GR. I

748

107853

A.M.ASBE

OPERATOR GR.II

748

124541

P.D.PATIL

SR.OPERATOR

748

120215

N.G.ZITE

TECH. MECH. GR.II SG-I

748

94162

P.D.PATIL

SR.OPERATOR

748

120215

N.G.ZITE

TECH. MECH. GR.II SG-I

748

94162

S.S.MESHRAM

DY. MANAGER
(CHEM./PRODN.)

748

126853

B.S.DESHMUKH

SENIOR ENGINEER(MECH.)

748

98407

B.A.DESHPANDE

DY. MANAGER (INST.)

748

95283

D.S.KOLI

SR.TECH.(MECH.)

748

85725

S.S.MOHITE

OPERATOR GR.II

748

128624

A.M.ASBE

OPERATOR GR.II

748

124541

A.R.NAGVEKAR

OPERATOR GRADE II

748

119009

A.R.NAGVEKAR

OPERATOR GRADE II

748

119009

S.H.LAGHULE

DY. MANAGER
(CHEM./PRODN.)

748

129331

S.S.MESHRAM

DY. MANAGER
(CHEM./PRODN.)

748

126853

N.G.ZITE

TECH. MECH. GR.II SG-I

748

94162

S.S.MESHRAM

DY. MANAGER
(CHEM./PRODN.)

748

126853

S.S.MESHRAM

DY. MANAGER
(CHEM./PRODN.)

748

126853

ADDITIONAL COMMODE
TOILET IN DMF CONTROL
ROOM
N2 TANK A & B & AR TANK
A/B OUTLET VALVE I.E.
TANKER FILLING VALVE
REQUIRED HAND WHEEL
ABOUT USING CHECK
LIST OF TANKER LIST IN
FAP
CHANGING DEFLECTOR
OF 31 P 206 PUMP
ABOUT USE OF VEHICLE
IN DMF LOADING SHED
FOR DRUM SHIFTING
CHANGING PUMP 105 A
BY MECHANICAL SEAL
PUMP
TWO RECHARGEABLE
TORCH TO BE MADE
AVAILABLE IN CONTROL
ROOM
CHANGE THE MATERIAL
OF G-102 A/B PUMP'S
CASING O RING
'SMAR' TRANSMITTERS
TO BE REPLACED IN
DMAC
G-911 A/B PUMP'S
COOLING LINE IS NOT
NOTE IN USE PL
DISCONNECT IT
PROPER APPROACH OF
ISA DRYER I/L BY PASS
V/V & V5220 DRAIN VALVE
IS NECESSARY
CHLORINATION UNIT LINE
HAVE PROPER SUPPORT
SYSTEM
IN AR PLANT LOADING
POINT SHED IS
REQUIRED
PROCESS FLOW
DIAGRAM OF EACH
POINT IS REQUIRED IN
CONTROL ROOM OF AR
CF PLANT
COUPLING GUARD
MISSING AT SOME OF
PUMPS IN CO-FA
SMALL TOOL BOX &
HANGER HOOK
ARRANGEMENT NEAR
LOADING AREA OF
ARGON PLANT
ABOUT ORIGINAL O
RINGS OF PUMPS
PROVISION OF CL2
DETECTOR NEAR TOILET
AREA/CL2 UNIT IT'S
INDICATION ON DCS
CHECKING OF N2
ACCUMULATOR IN
SHUTDOWN PERIOD IN
ARGON PLANT

20123138

20123776

20122968
20123176
20122969
20123186

20124357

20122436

20123643

20122706

20123556

20122769
20122888

20122887

20123631

20122986

20123175

20124329

20123501

CHANGE GLAND
PACKING SEAL TO
SPRING LOADED
MECHANICAL SEAL OF
F105 A/B IN FAP
PROVIDE DRAIN V/V
BETWEEN C.W. INLET &
OUTLET LINE OF IAC IN
AR PLANT
PROVISION OF
SUFFICIENT PLACE FOR
KEEPING GAS CYLINDER
LIQ NO TANK B
OVERFLOW IS TO BE
EXTENDED AT SAFE
LOCATION
PROVISION OF DRAIN
VALVE OR VENT VALVE
ON RECYCLE LINE OF
ARGON STORAGE TANK A
,B & C
IN AR PLANT PSV VENT
OF STREAM EJECTOR
PAIR IS TO BE MOUNTED
IN DOWNWARDS
DIRECTION AT AVOID HOT
CONDENSATE BURNING
IF PSV PASSED
PROVISION OF PROPER
CLAMP AT INST AIR LINE
TO COOLING TOWER IN
AR PLANT.
ARGON TANK VENT
VALVE TO BE
CONNECTED TO EACH
OTHER FOR MUTUAL
TRANSFER
GIVING NAME TO HALL
WHICH IS ON FA
CONTROL ROOM

A.R.YEMUL

SENIOR ENGINEER (MECH.)

748

136402

S.S.MOHITE

OPERATOR GR.II

748

128624

K.H.GHASE

TECHNICIAN(MECH.)GR.III

748

132904

S.S.MOHITE

OPERATOR GR.II

748

128624

S.S.MESHRAM

DY. MANAGER
(CHEM./PRODN.)

748

126853

S.S.MOHITE

OPERATOR GR.II

748

128624

A.M.ASBE

OPERATOR GR.II

748

124541

S.S.MOHITE

OPERATOR GR.II

748

128624

A.C.PATIL

SR.TECH.(ELECT.)

748

107772

N.G.ZITE

TECH. MECH. GR.II SG-I

748

94162

CHANGE THE STRAINER


POSITION OF 103 A PUMP

20123602

20123071

20123519

A.K.MHATRE

OPTR. GR. I

770

132052

REPLACEMENT OF
SUCTION DRAIN TUBE OF
K 106 CO2 COMPRESSOR
IN CO PLANT

S.V.MHATRE

PLANT ATTENDANT GR II SG-I

770

131689

NAMEPLATE PROVISION
AT DMA/TMA SOLUTION
FILLING POINT

P.S.GAIKWAD

CHIEF MANAGER
(CHEM./PRODN.)

770

107345

K.S.PATIL

OPTR.GR.I

770

120434

P.H.TANNA

DY. MANAGER
(CHEM./PRODN.)

770

126529

N.S.GOKHALE

SR. OPTR.

770

108466

PROVIDE THE LUBE OIL


PRESSURE INDICATION
ON PANEL
PROVISION OF TOILET AT
FA LOADING SHED
REFLUX FLOW OF
NITROGEN COLUMN
SHOULD BE KEPT
POWER THAN NORMAL
VALVE DURING STARTUP
OF ARGON PLANT
PREVENTIVE
MAINTENANCE OF FLARE
STACK SCHEDULE TO BE
DONE

20122708

20123554

20122911

20123550

20130777

20130875

20130037

20130029

20123209

20123935
20123939

20124105

20123285

P.H.TANNA

DY. MANAGER
(CHEM./PRODN.)

770

126529

R.M.NANNAWARE

MANAGER (CHEM./PRODN.)

770

132317

P.H.TANNA

DY. MANAGER
(CHEM./PRODN.)

770

126529

D.K.REDDY

DY. MANAGER
(CHEM./PRODN.)

770

127466

D.K.REDDY

DY. MANAGER
(CHEM./PRODN.)

770

127466

A.J.AWASKAR

OPERATOR GR. I

770

107923

D.K.REDDY

DY. MANAGER
(CHEM./PRODN.)

770

127466

A.K.MHATRE

OPTR. GR. I

770

132052

P.B.PATIL

OPTR GR.I SG-II

770

120029

K.S.PATIL

OPTR.GR.I

770

120434

J.D.THALE

OPTR.GR.I

931

120467

S.S.KHARCHE

SENIOR MANAGER (MECH.)

931

73864

S.P.JADHAV

JR.BOILER OPERATOR

931

132858

A.D.CHIKTE

JR.BOILER OPERATOR

931

132926

A.D.CHIKTE

JR.BOILER OPERATOR

931

132926

D.H.PATIL

SR.OPERATOR

931

107553

S.P.JADHAV

JR.BOILER OPERATOR

931

132858

S.P.JADHAV

JR.BOILER OPERATOR

931

132858

J.J.RANE

DY. MANAGER
(CHEM./PRODN.)

931

78919

J.J.RANE

DY. MANAGER
(CHEM./PRODN.)

931

78919

MEMBER OF CONTROL
ROOM WORKING IN
SHIFT AS PANEL OFFICER
SHOULD BE CALLED IN
MORNING MEETING WITH
DGM
PROVISION OF SS
VESSEL FOR CLEANING
OF LO TILTER IN ARGON
N2 COMP.
DISTANCE TO BE
MAINTAINED BETWEEN
N2 & ARGON TANKS
ISOLATION VALVE OF N2
VAPORIZER SHOULD BE
REPLACED AS IT IS
PASSING
CHLORINATION WATER
TO BE USED ON
COOLING TOWER DECK
FOR CLEANING
CHLORINE DETECTOR
PROVISION
PROVISION OF F ROD TO
OFFICERS IN ARGON
PLANT
PROVIDE ADDITIONAL
ISOLATION PRODUCT
VALVE TO MF T 1-3 A
SLIPPERY AREA ON THE
FOUNDATION OF G 210
PUMP IN FA PLANT TO BE
ATTENDED
PROVISION OF SAMPLE
POINT AT V-203 AT FAP
PROVISION OF
CONCRETE NEAR AREA
OF ID, FD
PROVISION OF
COMPLETE A/C SHEET
ROOF AT TOP OF
BURNER GH FLOOR OF
BOILER NO1,2,3
MODIFICATION IN OIL FILL
UP SYSTEM OF RAH
ELECTRIC MOTOR
ABOUT FILLING OIL IN
COMPRESSOR 1,2&3 IN
SGP
ABOUT TO FILL OIL IN
FEED PUMP IN SGP
FINAL RISE TIME IS MORE
PROVISION OF ALARM TO
40 ATA PRDS B CONTROL
VALVE OPENING OUTPUT
60% & 80%
PROVISION OF ALARM 40
ATA PRDS A CPMTRP;
VALVE OPENING OUTPUT
50% AND 70%
PROVIDE O2 TRIM SET
POINT BUTTON ON BLR
NO 1 DCS
PIC - 501 OUTPUT
BUTTON TO BE GIVEN ON
BLR NO 1 DCS

20122566

20123927

20123462

20123607

20123608
20123712
20123616
20123547

20130800
20123230
20121521

20121455

20122343
20121439
20121440
20122333
20121690

20121689

20122218
20122219

J.D.THALE

OPTR.GR.I

931

120467

V.S.EKBOTE

SR.OPTR. SG II

931

86916

A.K.RAUL

MANAGER (CHEM./PRODN.)

931

72513

S.K.GHARAT

JR.BOILER OPERATOR

931

132847

PROVISION OF BIG
FUNNEL FOR FILLING
PHOSPHATE TANK
ABOUT ACID DRAIN PIPE
PROVISION OF POWER
WATER TO WTP I THRU
DM PUMP O/L INSTEAD
DEGASSER PUMP O/L OF
ABOUT FEED PUMP TANK
OIL LEVEL
PROVISION OF
PERMANENT PLATFORM
TO OPERATE VALVE
NEAR MAKE UP TANK 501
&502
PROVISION OF LIGHT AT
MOTOR CYCLE SHED AT
SGP
PROVISION OF WATER
SUPPLY PIPE LINE AT
BOILER
PROVISION OF SIMPLE
WATER TAP BY PUTTING
TON AQUA GUARD LINE
PROVISION OF BOARD
FLAMING GAS' AT GPRS
SECTION
THERE IS FOUR HOLES
AT 3RD & 4TH FLOOR
STAIR CASE OF SGP PL
WELD IT BY 2X2 MS
PLATE
PROVISION OF MAKEUP
TANK CONDENSATE
VALVE PLATFORM FOR
SAFETY & EASY
OPERATION
MAKE THE PLATFORM
FOR 105 TO 40 ATA PRDS
VENT PIPE AND SPRAY
WATER INTER
CONNECTION VALVE
PROVISION OF
PLATFORM AT MAKEUP
TANK

20121516
20121710
20121711

20121757

S.P.JADHAV

JR.BOILER OPERATOR

931

132858

S.K.GHARAT

JR.BOILER OPERATOR

931

132847

A.D.CHIKTE

JR.BOILER OPERATOR

931

132926

S.K.GHARAT

JR.BOILER OPERATOR

931

132847

S.P.JADHAV

JR.BOILER OPERATOR

931

132858

S.P.JADHAV

JR.BOILER OPERATOR

931

132858

A.E.SHINDE

SENIOR ENGINEER (ENERGY)

931

129191

A.G.JOSHI

SR. BOILER OPTR. SG - 2

931

72568

B.K.MOHITE

OPTR. GR. II SG

931

92542

V.G.KHANDALKAR

JR.BOILER OPERATOR

931

132882

J.D.THALE

OPTR.GR.I

931

120467

S.K.GHARAT

JR.BOILER OPERATOR

931

132847

P.S.PATIL

STOREKEEPER

941

95537

V.S.PAWAR

SENIOR ENGINEER (MECH.)

941

126597

WTP I/II ALLOMETRIC


VALVES OPEN/CLOSE
WORKING

20121480

V.S.PAWAR

SENIOR ENGINEER (MECH.)

941

126597

ABOUT SGP LIFT

20121481

R.C.KAWALE

SR. TECH. MECH. SG - II

941

72073

RE ARRANGE OF RESIN
DRUM AT BPML PLANT

20122146

VENT CONNECTION TO
FEED PUMP OIL FILTER
ID, FD COOLING WATER
SHOULD BE DRAIN IN
GALLEY
CLEAN THE RESERVOIR
ROOF OF THREE WATER
TANK
PROVISION OF EXHAUST
FAN/STAND FAN AT MECH.
STORES

20121778

20122087
20122103
20122176
20122205

20122206

20122256

20122291

20122296
20122338
20121520
20122080
20121462

R.C.KAWALE

SR. TECH. MECH. SG - II

941

72073

CHANGE THE SWITCH


BOARD OF GRINDER AT
RIGHT SIDE IN MECH.
WORK SHOP SGP

V.S.PAWAR

SENIOR ENGINEER (MECH.)

941

126597

PROVISION OF WTP-II
CADT TANK OPERATION
SCHEDULE

20121618

V.S.PAWAR

SENIOR ENGINEER (MECH.)

941

126597

PROVIDE SUPPORT THE


TH BMB VENT LINE

20122033

N.A.KATHE

SR. TECH. ELECT. SG - II

951

78768

PROVISION OF D G
SUPPLY TO EXHAUST
FAN

20122134

U.N.ADHIKARI

SR.TECH. (ELECT) SG II

951

78757

ABOUT TUBE LIGHT IN


MSS

20120111

M.R.MHATRE

SR. TECH. ELECT. SG - II

951

78643

N.A.KATHE

SR. TECH. ELECT. SG - II

951

78768

N.A.KATHE

SR. TECH. ELECT. SG - II

951

78768

D.E.BHOIR

SR.TECH. (ELECT) SG II

951

78781

N.A.KATHE

SR. TECH. ELECT. SG - II

951

78768

R.M.PATHAK

SR. TECH.ELECT.SG.II

951

79061

PROVISION OF DRINKING
WATER AT LIFT TROLLEY

20121457

20121764

20121904

PROVISION OF SINGLEPHASE SOCKET SUPPLY


AT W.T.U. I & II
CHANGE THE AUL. CABLE
WITH COPPER CABLE OF
BOILER AREA
PROVISION OF HOSE
PIPE TO FILL WATER
TANKER AT PUMP HOUSE
PROVISION OF
SEPARATE FUSE BOX
FOR EVERY FLOOR FOR
BOILER LIGHTING
PROVISION OF BALL
KNOCK AT U P C 3
FRONT SIDE WATER TANK

20121541

20122030
20122122
20121597

20121920

20122124

U.N.ADHIKARI

SR.TECH. (ELECT) SG II

951

78757

PROVISION OF
EXTENSION BOARD AT
HRA HT ECONOMIZER
AREA AT SGP

N.A.KATHE

SR. TECH. ELECT. SG - II

951

78768

TUB LIGHT FITTING ON


WALL AT THERMAX M.C.C.

U.M.PATIL

SR.TECH. (ELECT) SG II

951

83851

D.G.BANSODE

SR.TECH. (ELECT)

951

104878

P.V.KHARCHE

SENIOR ENGINNER (ELECT)

951

136124

PROVIDE THERMAX
EMERGENCY EXIT DOOR

20122376

U.M.PATIL

SR.TECH. (ELECT) SG II

951

83851

PROVISION OF TO START
11KV & 3.3.KV

20121726

S.D.SONAR

SR.TECH.ELECT.SG II

951

98026

PROVISION OF
MOUNTING TUBE LIGHT
AT JANITRA FLOOR

20121498

P.V.KHARCHE

SENIOR ENGINNER (ELECT)

951

136124

REWIRE ON POWER
CIRCUIT OF CT FAN 3 VFD
PANEL

20121809

78768

PROVIDE REFRESH
TRAINING OF CO2
EXTINGUISHER SYSTEM
FOR T G

20121908

N.A.KATHE

SR. TECH. ELECT. SG - II

951

PROVISION OF
PERMANENT 24 VOLT
HEAD LAMP AT BOILER
USE CERAMIC HOLDER
INSTEAD OF PLASTIC
HOLD IN HAND LAMP

20121418
20122328

N.A.KATHE

SR. TECH. ELECT. SG - II

951

78768

PERMANENT NUMBER
PROVISION TO TR1 & 2

20121939

N.A.KATHE

SR. TECH. ELECT. SG - II

951

78768

PROVISION OF TAGGING
TO EOT CRANE

20121901

N.A.KATHE

SR. TECH. ELECT. SG - II

951

78768

PROVISION OF BENCH
VICE FITTING

20121907

D.E.BHOIR

SR.TECH. (ELECT) SG II

951

78781

PROVISION OF INSULATE
TO METAL CHANNEL
WHICH SUPPORT
BATTERY BANK CABLE

20121915

P.V.KHARCHE

SENIOR ENGINNER (ELECT)

951

136124

ABOUT WTP MOTORS


NOMENCLATURE
PROPERTY

20122038

D.G.BANSODE

SR.TECH. (ELECT)

951

104878

N.A.KATHE

SR. TECH. ELECT. SG - II

951

78768

M.R.MHATRE

SR. TECH. ELECT. SG - II

951

78643

S.D.SONAR

SR.TECH.ELECT.SG II

951

98026

N.A.KATHE

SR. TECH. ELECT. SG - II

951

78768

M.N.GHASE

TECH. ELECT. GR. I

951

107886

PROVISION OF HACKSAW
AT ELECT. DEPT

20122068

20122326

MARKING OF OUTGOING
SUPPLY ON EACH LDB
FROM MCB
PROVISION OF SMOKE
DETECTOR AT SWITCH
YARD CONTROL ROOM
PROVISION OF
EMERGENCY DOOR AT
THERMAX M.C.C.
PUT LIGHTING LOCATION
& MCB NUMBER ON ALL
LIGHT DISTRIBUTION
BOARD
PROVISION OF
EMERGENCY DOOR AT
THERMAX M.C.C.

20122078
20122141
20122173

20122252

20121899

D.G.BANSODE

SR.TECH. (ELECT)

951

104878

KEEP SPARE COPY OF


ELECTRIC DRAWING &
SPARE FUSES IN EACH
MCC & SWITCHGEAR

P.V.KHARCHE

SENIOR ENGINNER (ELECT)

951

136124

LOAD MANAGEMENT
PROGRAM ME LOGIC
SIMPLIFICATION

20122371

P.V.KHARCHE

SENIOR ENGINNER (ELECT)

951

136124

ABOUT TERMINAL STRIP


DETAILS

20122276

H.M.TALATHI

SR.TECH.ELECT.SG-II

951

83608

P.V.KHARCHE

SENIOR ENGINNER (ELECT)

951

136124

N.A.KATHE

SR. TECH. ELECT. SG - II

951

78768

N.A.KATHE

SR. TECH. ELECT. SG - II

951

78768

S.T.GHARAT

SR.PLANT ATTENDANT SG II

961

99585

J.B.PAWAR

SENIOR ENGINEER (INST.)

961

136227

QUTO RESTART OF
DIODE COOLING FAN OF
TG
DIFFERENT COLOUR
MARKING ON LIFT ROPE
TO UNDERSTAND THE
FLOOR NO
PROVISION OF
CONCRETE AT USS.A
FRONT SIDE AT SGP
ABOUT EARTHING PLATE
AT SWITCH YARD
PROVISION OF ON/OFF
SWITCH AT SGP INST.
WELFARE ROOM
OPENING O & CLOSING
TIME OF BLOCK VALVE
TO BE RECORDED IN
LOGIC

20132191

20122313

20122138
20122139
20121970

20121467

J.B.PAWAR

SENIOR ENGINEER (INST.)

961

136227

REPLACE THE
MULTICORE CABLE OF
BOILER AJB

20121468

20121894

20121973

S.T.GHARAT

SR.PLANT ATTENDANT SG II

961

99585

ON /OFF SWITCH
OUTSIDE THE DOOR AT
INST. STORES AT BLR NO
3

S.T.GHARAT

SR.PLANT ATTENDANT SG II

961

99585

STOP LEAKAGE OF BLY


3RD FLOOR PVC TANK
PROVIDING PROPER
FLOW FOR BACKWASH
OF SAND FILTERS IN WTP
II
REMOVING OF THERMAL
PROTECTION OF DUAL
COIL SOV OF MFT & MFT
VENT
REMOVE THE FUSE OF AT
& AO DCS PANEL WHICH
ARE NOT IN USE (AIP AO
USED FOR NAPHTHA)
USE EMPTY SILICA
ANALYZER BOTTLES FOR
MONSOON PROTECTION

R.R.JAGTAP

SR. TECH. INST. SG - II

961

86892

J.B.PAWAR

SENIOR ENGINEER (INST.)

961

136227

J.B.PAWAR

SENIOR ENGINEER (INST.)

961

136227

S.T.GHARAT

SR.PLANT ATTENDANT SG II

961

99585

S.T.GHARAT

SR.PLANT ATTENDANT SG II

961

99585

PROVIDE LIGHT IN SGP


PARKING SHED

20121943

S.T.GHARAT

SR.PLANT ATTENDANT SG II

961

99585

WRITE BLR NO BELOW


THE INDICATOR BULB IN
SGP C/R

20121883

S.T.GHARAT

SR.PLANT ATTENDANT SG II

961

99585

PROVIDE FAN IN INST. ICB


STORES

20121882

TO REMOVE THE LOCAL


PANEL INDICATORS OF
COAL FIRING FROM
BURNERS
PROVIDE ON-OFF
SWITCH OUTSIDE ON
THE WALL OF BURNER
FLOOR A.C. CABIN IN SGP

20132157

20122259

20121469

20121984

S.T.GHARAT

SR.PLANT ATTENDANT SG II

961

99585

S.T.GHARAT

SR.PLANT ATTENDANT SG II

961

99585

J.B.PAWAR

SENIOR ENGINEER (INST.)

961

136227

THE SPARE OF NAPHTHA


INSTRUMENTS TO BE
USED

20122151

S.T.GHARAT

SR.PLANT ATTENDANT SG II

961

99585

REPLACE CEMENT PIPE


BY PVC PIPES IN SGP
BLDG.

20121879

S.T.GHARAT

SR.PLANT ATTENDANT SG II

961

99585

ABOUT CABLE

20121887

S.T.GHARAT

SR.PLANT ATTENDANT SG II

961

99585

S.T.GHARAT

SR.PLANT ATTENDANT SG II

961

99585

S.T.GHARAT

SR.PLANT ATTENDANT SG II

961

99585

S.T.GHARAT

SR.PLANT ATTENDANT SG II

961

99585

S.T.GHARAT

SR.PLANT ATTENDANT SG II

961

99585

NYLON/PATI CEILING
PROVISION AT SGP INST,
DEPT.
PROVISION OF LONG
NOSE OIL CAN AT WTP
INST.
INCREASE THE HOLES
OF TG VIBRATION PROBE
MOUNTING CASING
CLOSE THE HOLES MADE
DURING FEED PUMP
PANEL GLADDING
CLOSE THE HOLES DONE
WHILE FEED PUMP PLATE
GLADDING

20121950

20121885

20121964
20121981
20121983
20132026
20132029

J.P.KHEMJI

SR. RIGGER SG - II

991

86535

17C4 HEATER TUBE DE


CHOKING
PROVISION OF
ASBESTOS SHEET SHED
FOR ID FAN MOTORS OF
MAIN CRACKERS A AND B
IN HWP
PROVISION OF
STAIRCASE AND RAILING
WHILE GOING ON 15T
CRANE FROM 100 T
CRANE
LAYING OLD RUBBER
CONVEYOR BELT
BENEATH 100 TON EOT
CRANE TRAILING CABLE
PROVIDING LATCH FOR
NEW MOTOR ROOM AT
MSEB SWITCHYARD
TO REDUCE PRESSURE
CROP ACROSS CONTROL
VALVE FOR PRECISE
FLOW CONTROL IN 14S3
AND TO AVOID CONTROL
VALVE MAINTENANCE
OPERATING PLATFORM
IS TO BE PROVIDED
OVER PIPE LINES

20132044

V.N.BHAGWAT

SR.TECH.ELECT.SG.II

992

79037

V.N.BHAGWAT

SR.TECH.ELECT.SG.II

992

79037

V.N.BHAGWAT

SR.TECH.ELECT.SG.II

992

79037

V.P.KOLI

SR. TECH.(ELECT.)

992

95997

R.P.GHANEKAR

DY. MANAGER
(CHEM./PRODN.)

994

126518

S.J.MADHAVI

OPERATOR GRADE II

994

127558

S.D.CHANDEKAR

SENIOR ENGINEER
(CHEM./PRODN.)

994

98786

PROVISION OF N2
LINE/POINT FOR EMPTY
DRUM DRYING IN 26 UNIT

20120568

20130797

20110309

V.N.PATIL

SR.OPERATOR SG II

994

95191

DO NOT USE MONKEY


LADDER OR STAIRCASE
WHILE ERECTION OF
SWAYAPHO FOLDING

S.N.KULKARNI

SENIOR ENGINEER
(CHEM./PRODN.)

994

136054

32K11/12 DISCHARGE
LINE U LOOP TO BE
PROVIDED

P.T.LADAGE

OPTR. GR. I

994

107597

R.B.PAWAR

SENIOR ENGINEER
(CHEM./PRODN.)

994

136102

S.C.KATOLE

SENIOR ENGINEER
(CHEM./PRODN.)

994

129504

R.P.GHANEKAR

DY. MANAGER
(CHEM./PRODN.)

994

126518

M.P.GHARAT

OPERATOR GR.II

994

128876

S.I.SHEIKH

DY. MANAGER
(CHEM./PRODN.)

994

127306

R.R.BORADE

CHEMIST SG II

996

94716

14V62A LG HP ISOLATION
VALVE ORIENTATION TO
BE CHANGED
OPERATING PLATFORM
OR STOOL TO PROVIDE
FOR 34 UNIT AMMONIA
TRANSFER I/V
EXISTING SAFETY WATER
TANK NEEDS TO BE
INSPECTED OR NEEDS
TO BE REPLACED IN HWP
NEW HYDRAZINE PUMP
FEEDBACK INDICATION
ON DCS TO BE PROVIDED
FOR 17C4A/B RETIRE
ADKIST,EMT PM 18
METER ARRANGE THE
SHADE FROM MONSOON
PROTECTION
NEW LINE PROVISION
FROM 12P11/12 D/S FOR
PURIFIER 12A11/12
AMMONIA PUMPING
PL EXTEND STEAM
CONDENSATE PIPE UP
TO SAFE POINT

20120087

20120454

20120125

20131810

20100395

20110274

20123573

20123579

20130817

20130903

20131768

20131096

20120573

P.S.TINKHEDE

CHEMIST SG-II

996

99355

P.S.TINKHEDE

CHEMIST SG-II

996

99355

R.R.BORADE

CHEMIST SG II

996

94716

H.S.JADHAV

CHEMIST SG-II

996

109692

A. D. PATIL

DRIVER CUM OPERATOR GR.I

679

82636

R. V. SHETYE

OFFICER (S)

738

109946

R. V. SHETYE

OFFICER (S)

738

109946

S. R. SAWANT

SR. WELDER - SG II

655

86949

PROVIDE A PROPER
SUPPORT FOR 17G1B
SAMPLE POINT
PROVISION OF INSULATE
TO 12T1B DRAIN LINE
PROVISION OF
CONTAINER TO CARRY A
SAMPLE BOTTLE
GLASS/ PLASTIC
TRANSPARENT BOARD
FOR END POINT
ANALYSIS DURING
TITRATION IN ALL LAB
NEED OF FOAM MAKER
ON WATER MIX FOAM
SOLUTION LINE AT BOTH
METHANOL TANK
INFORMATION OF
IMPLEMENTED
SUGGESTION WITH
SAVING IN DAILY
ANNOUNCEMENT
CONGRATULATION TO
PLANT/DEPT. FOR
RECEIVING HIGHEST
SUGGESTION IN A
MONTH
'PASAY DAN' AT THE END
OF SUGGESTION WEEK
GRAVITY FEEDER GATE
BLOCK SHOULD HAVE
VERTICALLY OBLONG
HOLES FOR PROPER
GRIPPING
HOPPER DOOR HOLDING
BLOCKS TO BE
REPLACED BY SS
BLOCKS
USE THE CUPBOARD OF
SCRAP ROOM TO KEEP
NUT-BOLT, CLAMPS ETC

20131185
20131809
20131192

20130397

20110074

20120274

20120275

20120416

S. S. TEMGHARE

MANAGER (INST.)

674

72373

S. S. TEMGHARE

MANAGER (INST.)

674

72373

G. S. PATIL

SR. TECH. SG II

675

96082

S. B. BHENDKAR

ATTENDANT RIGGER

655

121036

PROPER SIZE FUNNEL TO


FILL OIL

20120501

D. K. GHARAT

WELDER- SG II

655

76561

PROVISION OF BEARING
STAND FOR SHAFT
WELDING

20120294

S. B. BHENDKAR

ATTENDANT RIGGER

655

121036

ABOUT MILLING MACHINE


NUT BOLT

20120320

S. B. BHENDKAR

ATTENDANT RIGGER

655

121036

S. B. BHENDKAR

ATTENDANT RIGGER

655

121036
128587

128587

128587

PROVISION OF CLAMP
NUT BOLT TO BORING
M/C
PROVISION OF 2" PIPE
FROM TAP TO COLON
TANK
IN AR PLANT TSA DRYER
A ABNORMAL SOUND TO
BE CHECKED
EYE WINDOW TO BE
PROVIDED TO SEE THE
LEVEL OF COOLING
TOWER IN ARGON PLANT
N2 EXPANDER LUBE OIL
ACCUMULATOR NOT
WORKING PROPERLY

20130027

20054032

20120496

20120500
20120503
20124320

20123433

20132098

S. S. MESHRAM

DY. MANAGER (PROD.)

748

126853

MINIMUM & MAXIMUM


LOCK TO BE GIVEN FOR
SET POINT OF 51FIC4646,
51FIC5400, 51HIC2612 &
51SIC26062

20130905

You might also like