Dailyreportfrom Site: Date 10.01.2013
Dailyreportfrom Site: Date 10.01.2013
Dailyreportfrom Site: Date 10.01.2013
S.No:24
1.
Date 10.01.2013
Details of
communications
received on (E-mail,
Fax, Courier, Post, by
hand etc.,)
2.
3.
Nil.
4.
Nil.
5.
MR.M.E.MANIKANDAN(2141)
5.1
Staff (VEESONS)
5.2
6.
Utkal Engineers:
Boiler: Supervisor:01 IB
00; Riger-02;grinder-0 Helper-05(Total=11)
7.
8.
Site status:
VWTA020 BOILER:
3 hours work stopped due to power problem.
O2 cylinder not available.
Work started time: 08-00AM work end time: 7-00PM
1) Sporger header area seal box plate hole cutting work U/P.
2) Roof Water wall panel seal box work u/p.
ESP;
1. Roof beam man hole door erection work u/p.
2. Support insulator erection work U/P.
3. Pin insulator erection work u/p.
Prepared by (Name):
M.E.MANIKANDAN
M.E.MANIKANDAN
Signature:
Signature:
Staff No : 2141