Dailyreportfrom Site: Date 22.11.2012

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

DAILYREPORTFROM SITE

S.No: 01

1.

Date 22.11.2012

Site: M/s Baldev alloys pvt. LTD.


Vwta020,VWHA052,053,054

Details of
communications
received on (E-mail,
Fax, Courier, Post, by
hand etc.,)

Dea. Orientation p

2.

Details of communications sent to HO


on

Dea. Orientation problem mail sent.

3.

Details of consignments / materials


received from HO / others

Nil.

4.

Details of payments received from HO /


others

Nil.

5.

Attendance with details


5.1

Staff (VEESONS)

:
MR.M.E.MANIKANDAN(2141)
Mr. DINESH KUMAR.S (1832)

5.2

6.

Contract Workers (Contractor wise)

Important brief feedback about Fabrication


/ Erection / Commissioning (delay with
reference to schedule, major problems
etc.,)

Utkal Engineers:
Boiler: Supervisor:01 IB
03; Riger-03;grinder-01Helper-02(Total=14)

1.contractor man power shortage

2. Radiography film required from con


3.customer side insert plates

4. Milwright fitter req for rotary equipm

7.

8.

Materials, documents, payments urgently


required from HO with details

Any urgent / important site complaints

1. Utkal engg Contractor payment.


2.refractory contractor

UTKAL Engineering Should be


increasing his manpower.

Site status:

Vwta020 BOILER:
Work started time:08-00AMwork end time: 7-00PM
1) Initial heating and steam inlet piping erection work U/P.
2) Feed piping grinding work U/P.
3) FD fan lifting structure welding work U/P.
ESP;
1. Collecting electrode to carrier beam pin locking work U/P.

Prepared by (Name):

M.E.MANIKANDAN

Checked & Approved by (Name) :

M.E.MANIKANDAN

Signature:

Signature:

Staff No : 2141

Staff No. :2141